TE-MPE-CP, RD, 03-Dec-2010 1 Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems),

Slides:



Advertisements
Similar presentations
Wind Turbine Session 4.
Advertisements

LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
CLIC Workshop 2009 Power Converters implications for CLIC machine protection 25/05/2015TE-EPC / S. Pittet1.
Chapter 9 Practical Application Issues of Power Semiconductor Devices
Semiconductor Power Switches and Supplementary Components and Systems.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Chapter 1 Power Electronic Devices
REVIEW OF THE CRYOGENIC BY-PASS FOR THE LHC DS COLLIMATORS ELECTRICAL CIRCUIT MODIFICATION, INCLUDING OPERATIONAL CONSIDERATIONS PRESENTED BY A. SIEMKO.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
TEV DUMP SWITCH FAILURES OF 2/10/09 Dan Wolff/EE Support.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Electrical Installation 2
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
Changes in QPS R. Denz, TE-MPE-EP MPP workshop Acknowledgements: K. Dahlerup-Petersen, V. Froidbise, S. Georgakakis, B. Magnin, C. Martin, J.
Becoming familiar with QPS systems in the LHC (incl. EE) Presentation 02 Sept PART 1 of 3. Part 1: General layouts and principles Presentation of.
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
Power electronics, control of the electromechanical energy conversion process and some applications Prof. J.D. Van Wyk, Dr.sc.tech., Prof. H.-Ch. Skudelny,
Etienne CARLIER, LBDS Audit, 28/01/2008 LBDS Environmental Aspects EMC, radiation, UPS… Etienne CARLIER AB/BT/EC.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
WAMSDO-2013, New Techniques, GdR WAMSDO, January 2013 Gijs de Rijk CERN 1 NEW TECHNIQUES.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
Essential lessons from commissioning of the 28 EE systems of LHC sector A corrector circuits.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
Andrzej SIEMKO CERN, Geneva The 2014 Kyoto Workshop on HTS Magnet Technology for High Energy Physics –WAMHTS-2.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
TE-MPE -EI 23/6/2011,Antonopoulou Evangelia RQS circuit Simulation results of Quench Antonopoulou Evangelia June 2011 Thanks to E. Ravaioli.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
Powering the damping rings wigglers Daniel Siemaszko, Serge Pittet OUTLINE : Powering superconductive magnets, Powering wigglers strategy, Existing.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
SYNERGY INSTITUTE OF ENGINEERING AND TECHNOLOGY
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
Types Of Thyristors And Their Applications
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Electrical Configuration and System Protection
Power Supply and Energy Extraction System for the CBM magnet
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
D1 and D2 powering and protection
11T Magnet Test Plan Guram Chlachidze
The HL-LHC Circuits: Global View and Open Questions
Superconducting Circuits, a generic view
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Ideas and design concepts, and challenges
LV Safe Powering from UPS to Clients
Powering the LHC Magnets
the CERN Electrical network protection system
Detailed global view on protection and detection of the circuits
Quench detection electronics for the HL-LHC magnet circuits of the LHC
Power Supply and Energy Extraction System for the CBM magnet
COOLING OF POWER DEVICES
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

TE-MPE-CP, RD, 03-Dec Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems), TE-MPE-CP

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings  Elements requiring protection: –Current leads, superconducting bus-bars, wiggler magnets  Protection devices (active and passive): –Cold parallel extraction resistors (passive) –Active energy extraction systems –Quench heaters and power supplies (to be decided) –Quench detection systems –Crowbar for decoupling of power converter in case of fast discharge (part of power converter) –Earth fault detection (part of power converter)  Supervision and interlocks for protection systems –Hardwired interlock loops linking quench protection, power converters and machine protection –Supervision system providing link to accelerator / test bench controls

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings  Boundary conditions (as known when preparing the talk...) –Maximum current: 1 kA –Maximum voltage (differential and to ground): 1 kV –Detection thresholds and maximum reaction time to be defined by equipment designers Current leads: to be defined (LHC HTS: 3 mV / 100 ms, RES: 100 mV / 100 ms) Magnets: to be defined (LHC: 100 mV / 20 ms) Superconducting bus-bars: to be defined (LHC: 600A circuits 100 mV / 20 ms, 13 kA circuits 300  V, 10s) –All protection electronics and energy extraction systems to be fed by redundant (source and line) UPS system (autonomy to be defined, typically 10 minutes) –All protection electronics and energy extraction systems to be installed in radiation free areas

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings  Dedicated protection systems for magnet, bus-bars and HTS leads  Proposed instrumentation scheme allows easy compensation of inductive voltages and enhanced diagnostics in case of faults –All voltage taps and instrumentation wires must be redundant –Routing of wires to be studied in detail  The optional current sensor would allow the implementation of graded, i.e. energy dependent detection thresholds

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings – magnet protection  Magnet protection system will compare the coil voltages for timely detection of transition to the resistive state –Compensation of inductive voltages and eventual saturation effects –The system can be based on LHC solutions, e.g. the symmetric quench detection systems for the LHC main magnets –Mixed signal system with analog input stage, analog to digital conversion and digital evaluation combining protection and diagnostics –Analog part of the detection systems is always on the magnet potential, electrical insulation is provided by digital isolators for the signal and DC-DC converters for the power part  The number of individual detection boards depends on the final wiggler layout  All systems will be redundant using two independent detection systems –Hardwired OR for the interlock configuration

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings – HTS lead and bus-bar protection  Protection of HTS leads requires normally a high precision system with a slower reaction time (LHC: 3 mV, 100 ms). The systems developed for the LHC can be used for this purpose. –Type of current lead (resistive or HTS) still to be confirmed  Depending on quench calculations the protection of bus-bar segments may be included into the magnet protection or a dedicated high precision system with slower reaction time (e.g. LHC main circuits 300  V, 10 s) can be deployed. It is also feasible to use both solutions in parallel. –High precision systems allow measurement of splice resistances with a resolution of about 1 n  –In case individual splices shall be measured, adequate instrumentation must be foreseen

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings – integration of protection systems  Various protection systems to be integrated into common crate –Signal distribution to various protection systems –Bundling of interlocks –Supervision of protection systems and link to accelerator controls (via field-bus or Ethernet)  Possibility to install additional independent DAQ systems in parallel to protection unit(s) but compatibility must be checked carefully –Concerns basically prototype test –Electrical insulation, EMC, input stages Example of an LHC style protection system integrating individual protection and supervision systems

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings –interlocks  Hardwired interlocks (typically current loops) for the link between quench protection, energy extraction, power converter and machine protection) –Short reaction time, reliable operation, EMC immunity Example of and hardwired interlock loop linking quench protection, power converters and machine protection.

TE-MPE-CP, RD, 03-Dec Protection of superconducting wigglers in the CLIC damping rings –supervision  Supervision of quench protection and energy extraction systems plus data acquisition system for super-conducting circuits –Permanent supervision of protection equipment status (basic task) Software interlocks on top of the hardwired abort loops in case of problems –Remote setting of detection parameters –Potential remote firmware upgrade of protection systems –Logging of device status, generation of alarms  Supervision system expected to be significantly different form the LHC implementation –No need for field-bus – Ethernet preferred, enhanced computing capabilities of local systems –To be adapted to user requirements especially for prototype testing (integration into existing controls infrastructure)

TE-MPE-CP, RD, 03-Dec Energy Extraction for the s.c. Wigglers of the CLIC Damping Rings – a first Approach. - A most obvious first approach for an initial design would be an attempt to profit from the LHC (or other existing developments) by re-employing already elaborated and proven layouts, topologies and component selections. - Parameter-wise the LHC corrector chains come closest to the Wiggler powering circuits EE systems have been designed and built for these LHC circuits (a joint QPS/BINP project) – see pictures below. The design parameters of these systems do not exceed: 600 A total DC current, 450 VDC extraction voltage, 154 kJ of stored energy and minimum 15 ms total opening time. - The extraction switches are electro-mechanical devices based on modified, 3-phase a.c circuit breakers, equipped with snubber capacitors for commutation aid and current equalizing resistors. Three such switches (one used as back-up in the opening process) are series-inserted in the circuit and operate often in combination with ‘internal’ (cold) parallel resistors. However, the external system is always dimensioned for the full energy dump. Two, 600A extraction systems in a common rack Circuit lay-out Dump resistors for 150 kJ

TE-MPE-CP, RD, 03-Dec Basic Extraction Requirements for CLIC SINGLE PROTOTYPE s.c. Wiggler Protection: With Nb-Ti wire: up to 790 ADC, 1.6 H, 392 kJ stored energy, discharge time constant τ < 1s. Total dump resistance to be shared between internal and external resistors. With Nb 3 Sn wire: up to 1000 ADC, stored energy may be a factor of 2 higher than for Nb-Ti. Also here use of internal and external extraction resistors are foreseen. To this comes a request for a total opening time not exceeding 10 ms for both coil wire types and a wish to foresee a ‘Nb 3 Sn-ready’ design from the beginning. FIRST CONSIDERATIONS : Important modifications would be needed in order to adapt the LHC systems to the Wiggler requirements. Whereas the current capability of the LHC systems would just match the need for Nb-Ti technology, it is not the same with the voltage capability of the switches, for which the maximum voltage (450 V) is determined by the arc chamber design (special for DC arc extinction). The requirement for very short release times, below 10 ms, is not compatible with the electro-magnetic driver of the mechanical contacts. The LHC switches are already equipped with ultra-fast pulsed coils for active opening and the arcing time is reduced by optimized capacitive snubbers. Further improvements will be difficult. The dump resistor energy capability, however, is easily extendable. There exist already a design with adequate rating for a single Nb 3 Sn Wiggler. For the final damping ring circuits with 13 series-connected magnets, a compact, liquid-cooled extraction resistor design is presently being considered. It features a resistor body immersed in a dielectric, heat transfer liquid, in-turn cooled through a built-in liquid-to-water heat exchanger for short cycling time. CONCLUSION: The only type of switch, which is rapid enough to satisfy the CLIC Wiggler commutation rate, will be based on power semi-conductor technology. QPS is suggesting the use of IGCT’s (Integrated-Gate Commutated Thyristors). An IGCT operates like a GTO (Gate Turn-Off Thyristor), however, having lower conduction losses and higher dV/dt capability (therefore no snubbers needed). Developments of high-current, medium-voltage IGCT’s has advanced considerably over the last years. For other CERN applications, such as HIE-ISOLDE and possible upgrades of LHC equipment, a prototype IGCT switch is already in the design phase at QPS. Although a RADTOL version of the gate drive will be required for other applications at CERN, the CLIC Wiggler extraction facilities can use traditional electronics. Gate drives for IGCT’s used as static switches already exist (on- pulse to gate, off-pulse to cathode). Furthermore, the CLIC system can be mono-polar. Energy Extraction for the s.c. Wigglers of the CLIC Damping Rings

TE-MPE-CP, RD, 03-Dec Knud 1 Dec 2010 The IGCT will only operate correctly with a dedicated gate drive which is designed for the application. With a gate turn-off current exceeding the anode current, the minority carrier injection from the lower PN-junction is being totally eliminated. This results in a faster turn-off time than in the GTO. In the IGCT the gate connection is designed for a minimum inductance of the gate drive circuit. The high gate currents and high dI/dt rise of the gate current prevents the use of normal wires for connecting the gate drive to the semiconductor press-pack. The design features a drive circuit in which the PCB is integrated into the package of the device. The drive circuit surrounds the IGCT with a circular conductor attaching the edge of the puck. The inductance and resistance of the connection is minimized by the large contact area and short distance. The proposed IGCT and its integrated drive electronics. A complete prototype switch (bi-polar) with non-RADTOL drives shall be ready for testing in May A contract with ABB, Lenzburg is being prepared for a joint development with CERN of a RADTOL version of the g-drive. Energy Extraction for the s.c. Wigglers of the CLIC Damping Rings

TE-MPE-CP, RD, 03-Dec Summary and outlook  Protection of the superconducting wigglers in the CLIC damping rings can be realized with systems based on LHC designs –New developments (hard and software) nevertheless required  From past experience it is considered as very useful to use the protection systems foreseen for the final installation as well for the prototype protection  Timeline including the definition of deliverables and milestones still missing –Detailed information concerning the magnet and the super- conducting circuit as well not yet complete  Very fast reaction time of energy extraction systems cannot be realized with electro-mechanical devices –New development of semiconductor based systems necessary  System integration (instrumentation, interlocks, infrastructure, supervision) to be started soon