1 Overview of WTSA-12 Outcome Xiaoya Yang Head, WTSA Programmes Division ITU-TSB Joint ATU-ITU Seminar on WTSA-12 and WCIT-12 Outcome (Durban, South Africa,

Slides:



Advertisements
Similar presentations
Tutorial for leadership teams of ITU-T study groups, TSAG, tariff groups and focus groups Overview of WTSA-08 Resolutions and A-series Recommendations.
Advertisements

ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Working Methods Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04.
Committed to connecting the world ITU-T Programs to Help Developing Countries ITU Regional Forum 2012 Bridging the standardization gap for RCC countries.
Committed to connecting the world Major issues related to work programme and working methods of ITU-T Africa Regional Preparatory Meeting for WTSA-12 Durban,
Committed to connecting the world Major issues related to working methods of ITU-T WTSA-12 Regional Preparatory Meeting Tashkent, Uzbekistan 3 April 2012.
Committed to connecting the world Bridging The Standardization Gap for RCC ITU Regional Forum 2012 Bridging the standardization gap for RCC countries Tashkent,
Committed to connecting the world Status of World Telecommunication Standardization Assembly Resolutions Preparatory Meeting for WTSA-12 Tashkent, Uzbekistan.
ITU Activities on Bridging the Standardization Gap (BSG) ITU Regional Standardization Forum for Africa (Kampala, Uganda, June 2014) Vijay Mauree,
Maputo, Mozambique, April 2014 ITU Activities on Bridging the Standardization Gap (BSG) Hiroshi OTA Study Group Engineer, ITU/TSB
Summary of Actions ITU Regional Standardization Forum for Africa (Kampala, Uganda, June 2014)
Committed to connecting the world Overview of GSS,WTSA-12Outcomes.
ITU Forum Bridging Standardization Gap – Brasilia, May 2008 Forum Accra June 2009 ITU-T Bridging Standardization Gap Forum Accra, 16 – 17 June 2009.
Geneva, Switzerland, 4 December 2014 ITU-T Study Group 17 activities in the context of digital financial services and inclusion: Security and Identity.
ITU Workshop on “Quality of Service and Quality of Experience of Multimedia Services in Emerging Networks” (Istanbul, Turkey, 9-11 February 2015) ITU Activities.
ITU Encouraging the deployment of IPv6 in the developing countries IPv6 workshop, Communications and Information Technology Commission (CITC). Riyadh,
WTSA 2012 World Telecommunications Standardization Assembly Debriefing, Durban 2013 WTSA-12 Action Plan for Africa By Dr. Sherif Guinena Advisor to NTRA.
International Telecommunication Union Preparation for WTSA-08 Malcolm Johnson Director, TSB International Telecommunication Union ASTAP March 2007.
1 Updates on ITU-T Mandate and Working Method Xiaoya Yang Head, WTSA Programmes Division ITU-TSB Joint ATU-ITU Seminar on WTSA-12 and WCIT-12 Outcome (Durban,
Africa's involvement in ITU-T Including Quality Aspects
Nadi, Fiji, September 2009 REGIONAL PERSPECTIVE OF WTSA-08 OUTCOMES Ron Box Manager, International ACMA ITU-T FORUM ON IMPLEMENTATION OF WTSA-08.
Geneva, 24 May nd Consultation Meeting on Action Line C8 “Cultural Diversity and Identity, Linguistic Diversity and Local Content ” ITU Work on Internationalized.
International Telecommunication Union Committed to connecting the world 1 ITU-T TSB Director’s Report 2011: Highlights Malcolm Johnson Director Telecommunication.
ITU Activities on Bridging the Standardization Gap (BSG) Vijay Mauree, ITU ITU Regional Workshop on Bridging the Standardization Gap (Yangon, Myanmar,
Yangon, Myanmar, November 2013 Setting up a National Standardization Secretariat (NSS) Vijay Mauree, Programme Coordinator ITU ITU Regional Workshop.
ITU Overview Empowering global ICT development Malcolm Johnson DOCUMENT #:GSC13-XXXX-nn FOR:Presentation SOURCE:ITU AGENDA ITEM:Opening Plenary, 4.6 CONTACT(S):Malcolm.
Guidelines for establishing a National Standardization Secretariat (NSS) for ITU-T Xiaoya Yang Head, WTSA Programmes Division ITU-TSB
Presentation to the Select Committee: Final Acts of the ITU Plenipotentiary Conference – Antalya, Turkey February 2011 Making South Africa a Global.
Draft Action Plan for the Implementation of WCIT12 outcomes By Dr. Sherif Guinena Advisor to NTRA Exec. President Coordinator for African Common Proposals.
International Telecommunication Union Accra, Ghana, June 2009 BRIDGING THE DIGITAL DIVIDE: EFFORTS OF GHANA Isaac Boateng Assistant Manager, Regulatory.
Durban, South Africa, 8 July 2013 Outcome of WTSA-12 on spam Xiaoya Yang, Head, WTSA Programmes Division ITU-TSB ITU Workshop on “Countering.
International Telecommunication Union Accra, Ghana, June 2009 AN AFRICAN VIEW ON THE OUTCOMES OF WTSA-08 Joshua Peprah Director, Regulatory Administration,
Setting up a National Standardization Secretariat (NSS) Vijay Mauree, Programme Coordinator ITU Joint ITU-AICTO Regional Standardization Forum for Arab.
Outputs from APT, RCC and Arab Regions WTSA preparatory events ITU Americas Region Preparatory Meeting Buenos Aires, Argentina, May 2012 Paolo Rosa.
International Telecommunication Union Forum Fiji 16 September 2009 WTSA-08 Resolutions for Developing Countries and Asia-Pacific region Forum on: Implementation.
International Telecommunication Union Accra, Ghana, June 2009 Implementation of WTSA 08 decisions: : National (Kenya) and Sub- Regional (East Africa)
WTSA 2012 World Telecommunications Standardization Assembly Debriefing, Durban 2013 Key Issues on NNAI (Numbering, Naming, Addressing and Identification)
Bangalore, India,17-18 December 2012 Bridging the Standardization Gap (BSG) Toby Johnson, Senior Comms Officer, ITU Joint ITU-GISFI.
Committed to connecting the world Status of World Telecommunication Standardization Assembly Resolutions ITU Americas Region Preparatory Meeting Buenos.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-GTSC6-10 FOR:Presentation SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
ITU-T Activities in Bridging The Standardization Gap Vijay Mauree Programme Coordinator, TSB ITU ITU Regional Standardization Forum for Asia-Pacific (Jakarta,
ITU Activities on Bridging the Standardization Gap (BSG) Vijay Mauree, TSB ITU Joint ITU-AICTO Regional Standardization Forum for.
International Telecommunication Union Forum Quito 7 July 2009 Committed to connecting the world RELATIONSHIP BETWEEN INPUTS BY THE AMERICAS REGION TO WTSA-08.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-XXXX-nn FOR:Presentation or Information SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
International Telecommunication Union Committed to connecting the world Overview of ITU-T/SG5 “Environment and climate change” Ahmed Zeddam Chairman of.
RCC Preparations WCIT-12 Dmitry Cherkesov (Russia) Deputy Head of RCC WP for WCIT-12 Com-ITU Meeting 6 – 8 September 2011 Lisbon, Portugal.
Committed to connecting the world Preparing for WTSA-12 Status at TSAG July 2012 Bruce Gracie, TSAG Chairman.
Inter-American Telecommunication Commission
Inter-American Telecommunication Commission
Preparation for World Telecommunication Standardization Assembly 2016
ITU PLENIPOTENTIARY CONFERENCE GUDALAJARA - MEXICO October 2010
Key Issues on Bridging the Standardization GAP
Guidelines for Drafting WTSA Resolutions
Head of WTSA Programmes Division, ITU-TSB
Key Issues on Conformance & Interoperability (C&I)
Bridging the Standardization Gap (BSG) Programme
ITU Activities on Bridging the Standardization Gap (BSG)
ITU Activities on Bridging the Standardization Gap (BSG)
De-Briefing Meeting on WCIT-12 Durban, July 8th 2013
ITU Regional Standardization Forum For Arab Region SESSION 1 10:30-11:05 Introduction to ITU-T Standardization Process.
Summary of Actions ITU Regional Standardization Forum for Africa
Bridging The Standardization Gap
Bilel Jamoussi Chief, Study Groups Dept. TSB/ITU
Bridging the Standardization Gap (BSG)
ITU Activities on Bridging the Standardization Gap (BSG)
Bilel Jamoussi Chief, Study Groups Dept. TSB/ITU
Initiatives of TSB to implement WTSA-08 Resolutions
Interplay between Study Groups and TSAG
Malcolm Johnson, Director, Telecommunication Standardization Bureau
ITU Update since GSC-13 Global Standards Collaboration (GSC) 14
ITU PLENIPOTENTIARY CONFERENCE GUDALAJARA - MEXICO October 2010
Presentation transcript:

1 Overview of WTSA-12 Outcome Xiaoya Yang Head, WTSA Programmes Division ITU-TSB Joint ATU-ITU Seminar on WTSA-12 and WCIT-12 Outcome (Durban, South Africa, July 2013)

Committed to connecting the world Durban, South Africa, July 2013 Content 1. Overview of WTSA-12 conference 2. Overview of WTSA-12 Resolutions 3. Overview of WTSA-12 approved Recommendations 4. Introduction of 11 July’s workshop programme 2

Committed to connecting the world Durban, South Africa, July 2013 Overview of WTSA-12 3

Committed to connecting the world Durban, South Africa, July 2013 World Telecommunication Standards Assembly November 2012  WTSA-12 saw record attendance with delegates from 100+ countries  Structure of ITU-T and priorities  New ITU-T leadership teams appointed for 10 ITU-T Study Groups with membership from 35 countries (24 developing countries) 4

Committed to connecting the world Durban, South Africa, July 2013  1 WTSA-12 Opinion  50 WTSA-12 Resolutions  6 new, 44 revised  6 technical Recommendations  7 A-series Recommendations 5 WTSA-12 Proceedings

Committed to connecting the world Durban, South Africa, July 2013 New Opinion 1 “Practical application of network externality premium”  “considering the progress achieved … those Member States concerned may wish to … possibly withdraw the reservations about Recommendation ITU-T D.156, Network externalities,”  Member States to implement Recommendation ITU-T D.156,  Council to report on this subject to PP

Committed to connecting the world Durban, South Africa, July 2013 Overview of WTSA-12 Resolutions 7

Committed to connecting the world Durban, South Africa, July 2013 ‘Roughly’ Grouping 50 WTSA-12 Resolutions into 4 categories 1. ITU-T ‘house-keeping’ (16) 2. Collaboration and cooperation (6) 3. Bridging standardization gap (5) 4. Thematic topics (23) 8

Committed to connecting the world Durban, South Africa, July 2013 Resolutions on ITU-T house- keeping (16)  Res 1 – ITU-T rules of procedures  Res 2 – ITU-T SG mandates  Res 22, 40, 45 – coordination of SGs and TSAG’s role  Res 31 – associate membership  Res 32 – electronic working method  Res 33 – ITU-T strategic guideline  Res 34 – voluntary contribution  Res 35 – Chairman and Vice-Chairman  Res 66 – technology watch  Res 67 – use of UN languages on equal footing  Res 68 – evolving role of WTSA  Res 71 – academia membership  Res 80 – acknowledge membership involvement in ITU-T  Res 82 – review committee  Res 1 – ITU-T rules of procedures  Res 2 – ITU-T SG mandates  Res 22, 40, 45 – coordination of SGs and TSAG’s role  Res 31 – associate membership  Res 32 – electronic working method  Res 33 – ITU-T strategic guideline  Res 34 – voluntary contribution  Res 35 – Chairman and Vice-Chairman  Res 66 – technology watch  Res 67 – use of UN languages on equal footing  Res 68 – evolving role of WTSA  Res 71 – academia membership  Res 80 – acknowledge membership involvement in ITU-T  Res 82 – review committee 9

Committed to connecting the world Durban, South Africa, July 2013 Resolutions on collaboration and cooperation (6)  Res 7 – ISO/IEC  Res 11 – UPU  Res 18 – ITU-R  Res 38, 57 – coordination of ITU Sectors on IMT and other matters  Res 81 – Strengthening Collaboration  Res 7 – ISO/IEC  Res 11 – UPU  Res 18 – ITU-R  Res 38, 57 – coordination of ITU Sectors on IMT and other matters  Res 81 – Strengthening Collaboration 10

Committed to connecting the world Durban, South Africa, July 2013 Resolutions on Bridging Standardization Gap (5)  Res 43 – Regional preparations for WTSAs  Res 44 – Bridging Standardization Gap  Res 54 – regional groups  Res 59 – telecom operators from developing countries  Res 74 – sector members from developing countries  Res 43 – Regional preparations for WTSAs  Res 44 – Bridging Standardization Gap  Res 54 – regional groups  Res 59 – telecom operators from developing countries  Res 74 – sector members from developing countries 11

Committed to connecting the world Durban, South Africa, July 2013 Resolutions on thematic topics(23)  SG2&3 related (11):  Res 20 NNAI, 60 numbering, 61 number misuse, 65 Calling Party Number Delivery  Res 29 alternative calling procedures, 62 dispute settlement  Res 47 ccTLD, 48 IDN, 49 ENUM, 64 IPv6  Res 69 – non-discriminatory access to Internet  SG17 related: Res 50 cybersecurity, 52 spam, 58 CIRTs  SG5 related: Res 72 EMF, 73 climate change, 79 e- waste  Res 76 – Conformity and Interoperability  Res 77 SDN, 78 e-health  Res 70 – accessibility  Res 75 - WSIS  Res 55 – gender perspective  SG2&3 related (11):  Res 20 NNAI, 60 numbering, 61 number misuse, 65 Calling Party Number Delivery  Res 29 alternative calling procedures, 62 dispute settlement  Res 47 ccTLD, 48 IDN, 49 ENUM, 64 IPv6  Res 69 – non-discriminatory access to Internet  SG17 related: Res 50 cybersecurity, 52 spam, 58 CIRTs  SG5 related: Res 72 EMF, 73 climate change, 79 e- waste  Res 76 – Conformity and Interoperability  Res 77 SDN, 78 e-health  Res 70 – accessibility  Res 75 - WSIS  Res 55 – gender perspective 12

Committed to connecting the world Durban, South Africa, July 2013  House-keeping (2)  Res 22 – TSAG to act between WTSAs  Res 68 – evolving role of WTSA  Cooperation (2)  Res 38 – ITU Sectors coordination for IMT  Res 57 – strengthening ITU Sectors coordination  Thematic topics (4 – SG2&3 related)  Res 60 – Evolution of numbering  Res 62 – Dispute settlement  Res 47 - ccTLD  Res 48 - IDN 8 Resolutions only editorially Updated 13

Committed to connecting the world Durban, South Africa, July 2013 Overview of WTSA-12 Approved Recommendations 14

Committed to connecting the world Durban, South Africa, July 2013  6 new technical Recommendations (standards)  MPLS-TP (ITU-T G and G )  Remote management of networked devices in home networking (ITU-T G.9980)  power line transceiver (ITU-T G.9901)  Deep packet inspection (ITU-T Y.2770)  Time-scale for settlement of accounts (ITU-T D.195) 15

Committed to connecting the world Durban, South Africa, July 2013  7 A-series Recommendations  A.1 - working methods for ITU-T SGs  A.2 - Presentation of contributions to ITU ‑ T  A.4 – Communication process between ITU ‑ T and forums and consortia  A.5 - Generic procedures for including references to documents of other organizations in ITU-T Recommendations  A.6 - Cooperation and exchange of information between ITU ‑ T and national and regional standards development organizations  A.7 - Focus groups: Working methods and procedures  A.11 - Publication of ITU ‑ T Recommendations and WTSA proceedings 16

Committed to connecting the world Durban, South Africa, July 2013 Workshop Programme (11 July 2013) 17

Committed to connecting the world Durban, South Africa, July 2013  Xiaoya Yang will present:  Resolutions in Category 1 & 2  new Resolutions in Category 4: thematic topics  WTSA-12 approved A-series Recommendations  Kwame Baah-Acheamfour, SG12 Chair, will present Resolutions in Category 3: Bridging Standardization Gap  revised Resolutions in Category 4 will be covered by:  NNAI: Sherif Guinea, SG2 Chair  CIT: Isaac Boateng, SG11 Vice-Chair  Security: Martin Euchner, SG17 Counsellor  Accounting and Economics: Josephine Adou Biendjui, SG3 Vice-China 18

Committed to connecting the world Durban, South Africa, July 2013 Any Questions? 19

Committed to connecting the world Durban, South Africa, July 2013 Thank you! 20