International Federation of Consulting Engineers FIDIC FIDIC Contracts and Infrastructure Development Athens, 28 March 2012 Dr William Godwin Barrister,

Slides:



Advertisements
Similar presentations
Overview and Short Comparison between FIDIC’s Red Book & New Red Book
Advertisements

CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr. Judit Gyulay – Dr. Zoltán András Vattai BUTE Department of Construction Technology & Management.
1 RICS Singapore Branch CPD Event 19 June 2012 An Overview of the FIDIC FORMS OF CONTRACT and Contracts Committee Activities Philip Jenkinson Chair of.
Contracts – important issues
FIDIC Workshop WS 12, Beijing Conference
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
International Federation of Consulting Engineers Speaker: Richard Kell AM FTSE BE(Hons) HonFIEAust CPEng, Director, Cardno International Pty Ltd.
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
International Federation of Consulting Engineers Speaker:Sarwono Hardjomuljadi Dr, Ir, MSc, MSBA, MPA, MDBF, ACIArb, ACPE Special Adviser to the Minister.
USING THE GOLD BOOK IN PRACTICE SOME COMMERCIAL / LEGAL ISSUES Mark Roe, Partner – Pinsent Masons LLP Dansk Byggeri/E Pihl & Son AS 5 March 2009.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
Contract price & payment
Mikael Wahlgren NCC Construction Sverige AB ESCL Conference August 25th 2006 – Risk in Construction and how to deal with them. Duty for the contractor.
This project is co-financed by the European Union and the Republic of Turkey REPUBLIC OF TURKEY MINISTRY OF SCIENCE, INDUSTRY AND TECHNOLOGY 1 Bölgesel.
11. November 2011 The European Society of Construction Law (ESCL) Construction contracts By Attorney Peter Wengler-Jørgensen.
The Private Finance Initiative n Advantages * Benefits of the PFI The major appeal of the PFI for the government is that the cost of the hospital does.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
Stave Lake Water Supply and Treatment Project Business Case for P3 Canada Fund Funding Request AMWSC April
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
International Federation of Consulting Engineers
Copenhagen, 5th March 2009 dansk byggeri - Export Section1 By Frank Kehlenbach Director of EIC.
Construction Contracts and Project Delivery Methods
Strategic Planning : The best way to manage EPC Contract Risks Pankaj K Sinha Abu Dhabi 17 th Nov 2014.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
Energy for the Future Belene Nuclear Power Plant Project Status.
Chapter 19 International Construction Contracts. International Contracts Is payment for work assured? –Is there a principal’s bond? –Is there an owner’s.
Presented by Keith J. Platte, P.E. Construction Contracting The Rollercoaster Construction Contracting The Rollercoaster R. W. Beck, Inc. IPED COAL POWER.
TECHNOPOLIS ACROPOLIS I C T PARK PROJECT DEVELOPMENT SCHEMES ΑΚΡΟΠΟΛΙΣ Α.Ε. Πάρκο Επιχειρήσεων Υψηλής Τεχνολογίας και Έρευνας.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
ACCOUNTING STANDARD - 7 ACCOUNTING FOR CONSTRUCTION CONTRACTS J.P., KAPUR & UBERAI.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Conditions Of Contract For Construction Conditions Of Contract For Construction Presented BY : Arch. INA’AM J. El TAWIL FIDIC 1999Conditions of Contract.
Management Approaches. Construction Management Customer appoints Design team and Management team.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
Islamic Development Bank (IsDB)
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
EFCA Annual Conference 2016, 02–04 June 2016, Sofia, Bulgaria Application of FIDIC CC for EU- Funded Projects in Bulgaria Assen Antov Transport Engineer.
FIDIC Tendering Procedures
Amendments to the Public Works Contracts
Procurement and Contract Management Training
Insurance in Construction
Treatment of Key Risks under EPC Contracts
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr
Design-Build/EPC Contracts: legal and practical issues encountered
Introduction to FIDIC - Manuals
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Particular Conditions of Contract & Appendix to Tender
Financial Clauses and Procedures.
Drawings Introduction to FIDIC - Drawings -.
Administration of a FIDIC Contract - Financial Management
Administration of a FIDIC Contract - Award to Commencement -
Particular Conditions of Contract & Appendix to Tender
COST PLANNING AND ESTIMATION
تاكيد بر اجراي قراردادهاي EPC
بازاریابی و بازرگانی زمستان 93.
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
Contractual Arrangement
Dennis Li - HKCIC Lecturer
Definitions EPC EPCM Design/Build Contract Lump Sum
Construction Contract Administration
“Bankable” Construction Contracts
Presentation transcript:

International Federation of Consulting Engineers FIDIC FIDIC Contracts and Infrastructure Development Athens, 28 March 2012 Dr William Godwin Barrister, London International Federation of Consulting Engineers

Range of the FIDIC Contracts FIDIC contracts are at the heart of infrastructure projects all over the world. This is in part because of the range of FIDIC standard forms available. ‘Red Book’ (Construction) Employer design Measurement Basis Engineer Even-handed Balance of Risk

‘ MDB Red Book’ (Multilateral Development Banks Harmonised Edition) May 2005, revised March 2006 Standardised form where project MDB financed ‘Yellow Book’ (Plant and Design-Build) Contractor Design Lump Sum Price Engineer Even-handed Balance of Risk

‘Gold Book’ (Design-Build-Operate) Contractor Design/Operation Lump Sum Price Employer’s Representative Even-handed Balance of Risk ‘Silver Book’ (EPC/Turnkey) Contractor Design Lump Sum Price No Engineer Contractor Risk

Which Contract? Single point of responsibility? The design-build forms: Yellow, Gold and Silver Books Operation and Maintenance: the Gold Book Certainty of Time and Cost? The Silver Book ‘EPC’ : Engineer, Procure, Construct

Unforeseeable difficulties/physical conditions Silver: No extension of time or additional payment for Contractor unless otherwise stated in Contract (cl 4.12). Yellow and Gold: Extension of time and additional payment (but not profit) if conditions were ‘Unforeseeable’ ( in that no experienced Contractor at the date of tender could be expected to have foreseen them) (cl 4.12).

Design Responsibility Yellow, Gold and Silver: Contractor to design, execute and complete the works in accordance with the Contract so that when completed the Works will be fit for the purposes for which they were intended as defined in the Contract (cl 4.1) Silver: If error in Employer’s Requirements no additional time or payment for Contractor unless exception within cl 5.1 (a)- (d) applies

Yellow and Gold: Additional time and payment (plus reasonable profit) if the error was such that an experienced contractor exercising due care would not have discovered the error when scrutinising the ER by the relevant time specified in the contract. Front end engineering design (FEED) Multiple turnkeys