Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement:

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

IU e-Cloud Feedback Workshop March 13, 2007 LA-UR Review of the e-p feedback experiments Rod McCrady Los Alamos National Lab.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Observations with the Transverse Damper at High Intensities G. Kotzian for the Damper Team BE-RF-FB, 23. February 2015LIU-SPS intermediate internal scrubbing.
New PS one-turn delay feedbacks and further developments
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
“What you get” Transverse damper system (ADT) F. Dubouchet W. Höfle G. Kotzian D. Valuch Special thanks to: A. Boucherie, A. Butterworth, S. Calvo, G.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
Feedback for CESR TA Michael Billing May 17, 2007.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
Basic BPM Hardware Theory Jim Steimel. Wall Current Charge in a cylindrical perfectly conducting pipe produces an equal and opposite image charge at the.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Initial Performance Results of the APS P0 (Transverse Bunch-to-Bunch) Feedback System N. DiMonte#, C.-Y. Yao, Argonne National Laboratory, Argonne, IL.
Design and Performance of the Upgraded SPS Damper after LS1 G. Kotzian for the Damper Team BE-RF-FB, 13. February 2015MSWG
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
Summary of Booster Dampers Systems Dave McGinnis December 7, 2010.
ADT re-commissioning after LS1 A. Butterworth, W. Höfle, F. Killing, G. Kotzian, T. Levens, D. Valuch with many thanks to BE/OP LBOC, ADT re-commissioning.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
F Fermilab July 6, 2005Recycler Damper Stability1 Recycler Damper High Frequency Stability Jim Crisp
New PS one-turn delay feedbacks and further developments Thanks to Alfred Blas, Heiko Damerau, Guido Sterbini, Simone Gilardoni, Letizia Ventura, Valentin.
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Interplay of transverse damper and crab cavities W. Hofle BE/RF/FB W. Hofle, 4th Crab Cavity Workshop16-Dec-10 Acknowledgements: RF group, G. Arduini,
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
Feedback and Beam Control Section (FB) Activities and Highlights 2013 Outlook presented by Wolfgang Hofle FB Section at 2013 RF Group Meeting - December.
L. Ventura, H. Damerau, G. Sterbini MSWG MEETING, June 19 th 2015 Acknowledgements: S. Gilardoni, M. Haase, M. Migliorati, M. Paoluzzi, D. Perrelet. 1.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
R.SREEDHARAN  SOLEIL main parameters  Booster and storage ring low level RF system  New digital Booster LLRF system under development  Digital LLRF.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Coupled bunch instabilities in the CERN PS
Coupled-bunch oscillation feedback studies 1 H. Damerau LIU-PS Working Group Meeting 20 February 2013 Many thanks to R. Garoby, S. Gilardoni, S. Hancock,
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
SPS 200 MHz LLRF upgrade Part 2: Implementation Philippe Baudrenghien, Grégoire Hagmann,
LHC transverse Damper Observations versus expectations W. Hofle BE/RF/FB CERN BE-RF team for ADT L. Arnaudon, P. Baudrenghien, A. Butterworth, G. Cipolla,
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ADT Post-LS1 16 Dec 2015 Evian 2015 / ADT Post-LS1 – G. Kotzian G. Kotzian, W. Hofle, D. Valuch Special thanks to: L. Arnaudon, A. Boucherie, A. Butterworth,
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Transverse Feedbacks against ECE at SPS and LHC W.Hofle CERN BE-RF-FB on behalf of a multi-lab team CERN – SLAC – LBNL – LNF-INFN W. -
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
RF acceleration and transverse damper systems
The SPS Transverse Damper
Wideband, solid-state driven RF systems for PSB and PS longitudinal damper.
Digitizers in CCR for transverse wide-band pick-ups
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Transverse Feedback System (LHC Damper)
M. Mehler1), H. Klingbeil1), B. Zipfel2)
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
Intra-Pulse Beam-Beam Scans at the NLC IP
SPS Transverse Damper System
Limits on damping times
Presentation transcript:

Performance of upgraded SPS damper in view of crab cavity tests Complementarity to High Bandwidth Transverse Feedback W. Hofle CERN BE-RF-FB Acknowledgement: A. Butterworth, F. Killing, G. Kotzian, T. Levens, E. Montesinos, A. Rey, D. Valuch G. Ledey, S. Mutuel (FSU-BE03)

Reminder: Principle of Transverse Feedback One or multiple pick-ups Signal detection, signal processing, amplifiers, kickers All LHC injector synchrotrons use transverse feedback systems, PSB, PS, LEIR (ions), SPS, in case of SPS since 1970’s Challenging in Hadron Colliders due to need for low noise systems LHC: transverse feedback system since 2010 at all times with high intensity bunches, during injection, acceleration and in collision Feedback correction applied as correction in quadrature with position signal of oscillation Matching of time of flight for wideband system Tsignal = Tbeam + n Trev

Existing SPS Transverse Feedback System Last upgrade 1997-2000 in preparation of the SPS as LHC injector damping of injection errors and cure of resistive wall impedance driven coupled bunch instability (threshold ~5x1012 protons total intensity) operates since 2001 between lowest betatron frequency and 20 MHz (V & H plane) to damp all possible coupled bunch modes at 25 ns bunch spacing handles large injection errors of the order of several mm Tetrode amplifiers with two tubes driving kicker plates in push-pull configuration installed in tunnel under kicker tanks 200 W drive power per tetrode 3 kHz to 20 MHz Served as starting point for the design of the LHC damper (ADT) kickers and power system Technology of electronics of system used in SPS until 2012 dates from late 1990’s Tunnel with kicker tank and tetrode amplifier in SPS LSS2

Existing Transverse Feedback System 4.6 kV RA=180 kicker 45p 32p L L kicker effective capacitance: Cg+2Cp = 122 pF not all circuit elements shown, e.g. matching at input 200 W drive power in 50 W 3 dB @ 4.5 MHz RA = 180 W, Ceff = 200 pF Tube: RS 2048-CJC (V-plane) or TH561 (H-plane), max current 15A to 16A class AB operational RF voltage 2.6-2.9 kV phase corrected  20 MHz f < 25 MHz series resonance with L at 37 MHz

Existing Feedback: Kick Strength Accurate kick strength evaluation with HFFS: example V-plane +/- 2.6 kV @ 100 kHz, L=1536 mm, gap d=38 mm integrated kick strength over the entire structure  41.375 V (transverse) for +/-1 V on kicker plates +/- 1.83 kV @ 4.5 MHz +/- 0.572 kV @ 20 MHz G. Kotzian

Feedback kickers: Kick Strength 2.9 kV (with TH 561 tube) 2.6 kV (with RS 2048 CJC tube) G. Kotzian Horizontal kicker (BDH) Vertical kicker (BDV) plane Length/gap mm/mm Dp eVs/m kV transverse mrad at 26 GeV/c H 2x 2396/142 3.3x10-4 98 3.8 V 2x 1536/38 7.2x10-4 215 8.3 damps ~5 mm injection error (b=100 m) at 26 GeV/c in 20 turns (gain=0.1) in V-plane 26 GeV/c: kick per turn 8.3 mrad ( 0.54 mm at b=100 m) in V-plane regularly running at 0.5 ms damping time (20 turns) resistive wall growth rate for lowest mode: 0.5 ms to 1 ms

Scope and Motivation for SPS damper upgrade under LIU Why in LS1 ? sharing pick-ups with Orbit System (MOPOS) from Beam Instrumentation Group incompatible with MOPOS upgrade foreseen requirements for single bunch damping for protons used for LHC p-ion Physics (closer spaced proton bunches, 100 ns) ions injection damping with fixed frequency scheme, closer spaced batches individual bunch damping for crab cavity studies not possible with previous system (sampling was not synchronous with bunch in previous system) LHC doublet scrubbing beam incompatible with previous system controls with G64 chassis and MIL-1553 are obsolete (MMI)  new controls for power system and LLRF, new RF function generators  implement this LIU upgrade already in LS1

Pick-ups dedicated for transverse FB RF Faraday cage SPS Transverse FB BPCR.214 2 BPCR (H/V) for LHC type beams (couplers maximum ZT @ 200 MHz) 2 BPH electrostatic PU (pFixedTarget) 2 BPV electrostatic PU (pFixedTarget) BDH / BDV kickers unchanged BPCR.221

New Signal Transmission BA3  BA2 Ions (for implementation in 2015): 4 different delays for pick-up and kicker (ADC/DAC) clocks 1.48 km fiber links expect over year 20 degrees drift @200MHz 200 MHz LO 40 LO 200 MHz RF 120 MHz ADC/DAC frev 10 MHz ref + inj. Pulse (copy of SPSCPS) 10

Analogue Hardware developed in LS1 (1) LHC beam: 25 ns bunch spacing: 200 MHz bandpass filters (S and D) programmable gain/attenuation down mixing (I,Q) to base-band ADC protection sampling @120 MS/s (on digital board) Mixers for down conversion D. Valuch 200 MHz filters during production in CZ Clock generation board (all beams)

Signal processing LHC 25 ns beam H1 (V1) BPCR.214 (H/V) H2 (V2) BPCR.221 (H/V) variable delays for clocks ADC/DAC (120 MHz) analogue front-end (here for LHC beam) Digital Board

Digital Hardware developed in LS1 8 ADCs 4 DACs output gain control via DAC a la LHCADT Board will be used for ADT (independent gain control on DACs) T. Levens, D. Valuch G. Kotzian (firmware) New development ! eight installed for SPS start-up separate boards for H- and V-plane and beam type (pFT, pLHC, pSCRUB, Ions) tested up to beyond 120 MHz clock frequency, Xilinix ARTIX 7 FPGA features ADCs and DACs with four different clock domains for delay adjustment

Feedback electronics uses LHC RF VME standard signal combination/selector CPU Crate management clock distr. timing RF function generator pFT signal processing pLHC signal processing

Scrubbing Doublet Beam LP filter Strip-line coupler Combination (BP) Scrubbing beam position detection: Bandpass formed by LP and strip-line coupler response Synchronous sampling at 120 MHz Compute position from 3 samples  digital down conversion

Position detection: doublet beam Scrubbing beam position detection: Long bunches injected on unstable phase Bunch splits into doublet 200 MHz component low at injection and phase changing  cannot use pLHC 200 MHz demodulation, damper must work from turn 0 40 MHz component stable during After splitting could switch to pLHC 200 MHz demodulation effective Bandpass transfer function single bunch doublet PU signal 200 MHz BP filtered 40 MHz BP filtered (120 MHz sampled)

Performance Doublet beam: bunch train Analog signals before digitization: 25 ns spaced doublets

Doublet beam: phasing ADC clocks 120 MSPS 𝐻 R 3 40 MSPS ADC BPM input 120 MHz sampling clock bunch synchronous ℎ R [𝑛]=[1.0, −0.5, −0.5] tagging of bunch[0]

Setting-up: open loop BTF measurement Commissioning SPS Start-up In 2014 open loop BTF measurement: H damper, example fixed beam, NWA, remotely Sweep across two betatron lines (example ~ 3 MHz) adjustments using phase setting and loop delay synchrotron sidebands visible

Performance for Doublet beam - first results batch of 48 doublets bunch-by-bunch position data available in internal memory damping time of 20 turns reached as in previous system commissioned for three types of beams, pFT, pLHC, pDoublet  optimization ongoing

Plans for single bunch damping Relevance for crab cavity tests with single bunches issue: full kick strength only available for frequencies up to < 5 MHz need to play some “tricks” as for LHCADT Dense spacing 100 ns Truly isolated bunches 250 ns scheme for large spacing best for isolated bunches what we propose Full kick strength available with peak hold

Single bunch damping example: LHC ADT drive signal (200 W level): zoom: 500 ns/div large bunch spacing: peak hold (25 x 25 ns = 625 ns) pre-distortion of drive signal to compensate for phase response of power amplifiers 50 ns, 75 ns operation: peak hold for 2-3 samples 25 ns operation: without peak hold Easier in SPS as frequency up to which full kick strength available four times larger than in LHC ADT case 10 ms/div kick voltage (power amplifier return, kV level): 500 ns/div

Diagnostics potential for headtail motion Relevance for crab cavity and instability studies ! Longitudinal profile 𝜆(𝑡) symmetric asymmetric Transverse oscillation pattern Movement of centre-of-charge Normalized transverse position x[𝑛] even symmetric odd symmetric

Normalized beam position LHC ADT case (f scales 1/bunch length) normalized transverse position as computed center of gravity oscillation amplitude Phase rotation in digital part to align Sum and Delta in I, Q; required angle measured during set-up The normalization scheme sees the symmetric (even) oscillation patterns (needed for the closed loop feedback) Damper sensitivity to symmetric intra-bunch motion is a function of the longitudinal beam spectra For the anti-symmetric case no oscillation amplitude is detected, odd modes not visible to the damper, provided bunch is symmetric in shape LHC vs SPS feedback: 400 MHz  200 MHz, bunchlength G. Kotzian, EDMS 1404633

Headtail oscillation detection LHC ADT case (f scales 1/bunch length) different combination of Sum and Delta I,Q components indicates headtail motion This algorithm can detect odd-mode oscillations Algorithms cannot resolve the original oscillation frequency, and absolute oscillation amplitude accurately However, can detect activity and distinguish between symmetric (even) and asymmetric (odd) modes of every bunch  valuable diagnostics ! LHC vs SPS feedback: 400 MHz  200 MHz, bunchlength

Visualization of bunch motion TAIL HEAD LINE OF CHARGES pure movement of the CENTRE-OF-CHARGES MEAN TRANSVERSE OFFSET transverse Q-Component I-Component MEAN TRANSVERSE OFFSET longitudinal MEAN TRANSVERSE OFFSET only HEAD-TAIL activity, constant transverse offset transverse Q-Component I-Component longitudinal

Visualization of bunch motion mixed HEAD-TAIL activity with coherent CENTRE-OF-CHARGES movement TAIL HEAD-TAIL activity is in-phase with CENTRE-OF-CHARGES movement HEAD MEAN TRANSVERSE OFFSET transverse Q-Component I-Component MEAN TRANSVERSE OFFSET longitudinal HEAD-TAIL activity has some phase-advance w.r.t. the CENTRE-OF-CHARGES movement MEAN TRANSVERSE OFFSET transverse Q-Component I-Component longitudinal  extend to include influence of long. motion and non-symmetric bunches in analysis

Visualization of bunch motion Rapid identification of quiet bunches bunches with transverse center of mass motion bunches with head tail motion bunches with combination of center of mass and headtail motion with correlation example from LHC scrubbing run

Added value of upgraded SPS damper to crab cavity tests in SPS Efficient damping of single bunches will become possible Studies with stored beams and a state-of the art low noise damper should serve as test bad for the LHC case with respect to noise issues Similarity of SPS damper and LHCADT permits to investigate interplay between transverse feedback and crab cavities Diagnostics potential of damper hardware in area of headtail motion analysis Above is possible before LS2 as a result of realizing the SPS damper upgrade in LS1  significant effort which will pay off for crab cavity tests between LS1 and LS2

Complementarity of Feedbacks Upgraded BA2 Damper detects center of mass oscillations of bunches, feedback in “base-band” LIU upgrade successfully implemented: - dedicated new standard SPS pick-ups (BPCR coupler) - New eletcronics, bunchlet scrubbing beam kHz to 20 MHz, high kick strength (good for mm’s of oscillation) high kick strength Headtail “intergral” diagnostics possible LL electronics could drive wideband kicker (up-converted signal) BA3 Proposed High Bandwidth Feedback (V-plane) New approach: Intra-Bunch System similar to stochastic cooling in some way advanced Digital Technology 4-8 GS/s ~5 MHz to >~ 1 GHz, not so high kick strength addresses intra-bunch motion, diagnostics potential by direct sampling potential to damp intra bunch motion inside doublets  interesting with respect to requirement to provide a high quality doublet beam for LHC scrubbing kicker and Amplifier development crucial for success applicable to other accelerators including colliders such as FCC and LHC.

HBTFB - High Bandwidth Transverse Feedback Wideband feedback system (GHz bandwidth) for SPS Intra-bunch GHz transverse feedback system Help stabilize beam against Ecloud and TMCI effects Under development with LARP supported by: US-LARP (SLAC, LBNL) LNF-INFN (kicker study) CERN SPS LIU Project BPM Kicker Beam Active closed loop GHz Feedback Analog Front End Signal Processing Analog Back End ADC DAC Power Amp transverse position pre-processed sampled position “slices” calculated correction data correction signal pre-distortion drive signal

Summary SPS damper was consolidated with respect to power system and controls completely new electronics developed, installed and commissioned required Performance reached including for critical doublet beam upgrade opens possibilities to use the system for tests with crab cavities including diagnostics for headtail motion. diagnostics potential complementary to monitors and feedback that directly sample in time domain at high sampling rate Implementation of electronics for LHC ion beams before LS2