Copyright © 2014 Holland & Knight LLP. All Rights Reserved Injection Well Regulation in Texas June 2014 Fred Stovall.

Slides:



Advertisements
Similar presentations
EPA’s Underground Injection Control Program
Advertisements

FOR FURTHER INFORMATION Figure 1: High-level workflow for the assessment of potential interaction of CO 2 geological storage with other basin resources,
Railroad Commission of Texas Victor G. Carrillo - Chairman Elizabeth A. Jones – Commissioner Michael L. Williams – Commissioner.
Alert: Waste Spill Environmental Science. Artesian well.
Changes to Statewide Rule 13 June, 2013 Texas Alliance of Energy Producers John Tintera, P.G. Sebree & Tintera, LLC.
UIC Permit Applications: Technical Review & Public Notification
Field Operations and State-Managed Plugging Overview
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
Drilling Gas Wells: Beginning to End. Seismic Exploration.
CWAG 2010 WATER LAW CONFERENCE The Broadmoor Colorado Springs, Colorado April 29 – 30, 2010.
Notices of Violation, Orders to Cease Operation and Consent Orders.
The Public Records Act The Public Records Act W.S et. seq.
Railroad Commission March 24, 2008 Charles Ross, PE Deputy Director, Field Operations Oil and Gas Division Railroad Commission of Texas
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
It’s not my Fracking Problem! Regulations, Liability, and the Process of Hydraulic Fracturing Katie Heath November 30, 2010.
WEBINAR SERIES: March 12: General overview of WHP Planning Process March 19: In depth discussion and review of the Data Elements March 26: Requirements.
Railroad Commission of Texas Pipeline Safety Division.
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
August 14, 2001AOGCC / Jt. Committee on Natural Gas Pipelines 1 Alaska Oil and Gas Conservation Commission (AOGCC) Presentation August 14, 2001 to Joint.
COLORADO OIL AND GAS CONSERVATION COMMISSION CLASS II UNDERGROUND INJECTION CONTROL RULES AND REGULATIONS Garfield County Energy Advisory Board Thursday,
UIC Completion Reporting Guidance
FORM 1075 – MECHANICAL INTEGRITY TEST. This presentation will assist you in the completion of the Form The mechanical integrity test. Date of Last.
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
SDWA1 The Safe Drinking Water Act (SDWA) The Safe Drinking Water Act (SDWA)
RAILROAD COMMISSION OF TEXAS BACK TO THE BASICS : WELL COMPLIANCE FORMS AND PROCEDURES 1.
Kathy Metropulos Division of Drinking and Ground Waters Protecting your aquifer: What to consider when drilling oil and gas wells.
ETF – O IL AND G AS T RACT, M AY 5, 2015 GROUNDWATER AUTHORITY AND REQUIREMENTS.
Staying on Top of Permits & Public Comments Public Comments Policy Track: Sunday, February 28, :30 pm.
OSM CCB Placement in Coal Mines - Proposed Rulemaking John R. Craynon, P.E. Chief, Division of Regulatory Support Office of Surface Mining Reclamation.
UTAH GEOTHERMAL Dr. R. Gordon Bloomquist, Ph.D Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
RAILROAD COMMISSION OF TEXAS Rick Behal Railroad Commission of Texas Injection and Disposal Well Permitting.
The Underground Injection Control (UIC) Program
CLICK TO EDIT MASTER TITLE STYLE Railroad Commission of Texas RICK BEHAL MECHANICAL INTEGRITY TESTS ON INJECTION AND DISPOSAL WELLS (FORM H-5)
Regulatory Aspects of the Underground Hydrocarbon Storage (UHS) Program and the Role Contractors Have in This Lyons Celebration Center, Lyons, Kansas February.
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Railroad Commission of Texas Injection Well Permitting Oil and Gas Regulatory Conference September 24-25, Austin, Texas Rick Behal 1.
Where to find Information About Facilities. Overview of Title V Permits.
Limited Proceedings Water & Wastewater Reference Manual1.
RAILROAD COMMISSION OF TEXAS WELL COMPLIANCE FORMS AND PROCEDURES Austin Regulatory Conference September
How 1041 Regulations are Impacting Geothermal Development A discussion of how counties are applying 1041 regulations to geothermal development and the.
Developing Green Stormwater Design Solutions For UIC Compliance Presented by: Adam Zucker PE, CWRE 819 SE Morrison Street ● Suite 310 ● Portland, Oregon.
Class Description In the class today we will be discussing how to properly file the P-17 report. The P-17 form is used by an operator when they are surface.
EPA's Regulatory Approach : Climate Mitigation via Sequestration of CO2: by Rob Ferri (EPA - Underground Injection Control) This presentation has not been.
DEVELOPMENT OF THE HYDRAULIC FRACTURING REGULATIONS FOR NEVADA PRESENTATION TO MINING OVERSIGHT AND ACCOUNTABILITY COMMISSION ( MOAC) September 24, 2014.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Title V Operating Permit Program 1 Section 1: Intro to Title V Laura McKelvey U.S. EPA.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Location Exception Increased Density Eric R. King Week Five September 30, 2010.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 18 Environmental Law.
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
AOGCC Proposed Regulations regarding Hydraulic Fracturing April 4, 2013 Kara Moriarty, Executive Director.
1 Conveying Water Rights Division of Water Rights By Randy Tarantino Title Program Specialist Telephone: (801) April 2013.
NC Rules and Requirements: Certified Inspectors of Subsurface Systems NC Certified Inspector Training School.
Chapter 19 Environmental Law Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Water Quality Rulemaking in Response to S.L
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PREVENTION & PREPAREDNESS May 11, 2016 REGIONAL RESPONSE TEAM.
Radioactive Materials Licensing Authorizing licenses for: Low-level radioactive waste disposal By-product material disposal Public water system NORM waste.
Lithuanian Water Suppliers Association LEGAL REGULATION OF WASTEWATER DISPOSAL AND TREATMENT IN LITHUANIA.
Hydraulic Fracturing (Fracking)
Global Warming – The Broad Legal Reach of Initiatives to Reduce Carbon Emissions Worldwide Legal Issues Associated with Carbon Capture and Geologic Storage.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Oil & Gas Waste Stream Management and Permitting Options
Chairman Christi Craddick
Cross Connection Survey Training
Class I Injection Well Application Issues
Dr. Jim Thomas Desert Research Institute
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Presentation transcript:

Copyright © 2014 Holland & Knight LLP. All Rights Reserved Injection Well Regulation in Texas June 2014 Fred Stovall

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Presentation Outline Background & History –Production Brine Basics –Subsurface Disposal –Statutes and Regulation –Injection Well Data Permitting Process and Operations –Overview of Process and Key Permit Requirements –Geologic Requirements –Groundwater Depth –Review of Area Wells 2

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Presentation Outline (cont.) Permitting Process and Operations (cont.) –Notice and Publication –Wellbore Protection: Casing, Tubing and Packers –Surface Facility –Protests Takeaways 3

Background and History 4

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Water Resulting From Hydrocarbon Production Salinated water (brine) is a natural byproduct of oil and natural gas production Brine naturally occurs in virtually all hydrocarbon producing formations 8-10 barrels (1,100-1,600 liters) of brine produced for each barrel of oil Up to 30 barrels of brine per day produced from a natural gas well It is estimated that over 18 billion barrels of brine are produced annually from oil and gas production in the United States 5

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Characteristics of Production Brine Extreme salinity Drinking water = up to 1,000ppm Agricultural irrigation = up to 2,000ppm Sea water = 30,000 – 50,000ppm Production brine = 30,000 – 180,000ppm Other components Drilling and completion fluids Heavy metals Radioactive elements (NORM) 6

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Types of Fluids Completion Fluids – Fluids injected into well to improve hydrocarbon flow, whether as part of a completion of a conventional or an unconventional formation Flowback Brine – Immediately following completion of a new well, the release of injection pressure causes water and completion fluids to flow back up through the wellbore to the surface (completion fluids = 5-20% of volume) Ordinary Production Brine – Within a few days after the well is completed, there is a decrease in total fluid and the concentration of completion fluids (completion fluids = <5% of volume) 7

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Spindletop Field, Beaumont, Texas c

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Surface Disposal Methods Prior to Regulation Local dumping Severe impact on plant growth and agriculture Rivers and lakes Severe impact on wildlife and drinking water sources Evaporation pits Slow disposal Inappropriate in certain areas Subject to uncontrolled variables Residual salt concentrations Risk of spill 9

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide North Dakota Brine Spill

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Subsurface Injection Injection of production brine into deep rock formations Faster method of disposal Less exposure to uncontrolled variables Lower risk of spill Often used to enhance production by maintaining formation pressure and flushing hydrocarbons from depleted formations – can increase production 2-3 times 11

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Injection Well Diagram 12

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Subsurface Injection Timeline 1910s 1919 – Texas begins regulating production operations and appoints Texas Railroad Commission (TRRC) as primary regulator for hydrocarbon production and pipeline transportation 1930s The first documented project for the disposal of brine into the originating formation began in Texas Enhancing the recovery of oil by injecting water or other fluids into a formation to extract additional oil and gas begins 1940s Oil refineries begin to inject liquid wastes 13

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Subsurface Injection Timeline (cont.) 1950s 1955 – Texas regulates disposal of production brine Many other states establish regulations for the disposal of brine Chemical companies begin to inject industrial waste 1960s 1961 – Texas enacts Injection Well Act to regulate injection wells Deep well injection in Colorado causes earthquakes First documented cases of contamination of underground drinking water sources by injection wells 14

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Subsurface Injection Timeline (cont.) 1970s Waste spill from an abandoned oil well is traced to a nearby injection well 1974 – U.S. enacts Safe Drinking Water Act in 1974 to regulate potential pollution sources of underground drinking water, including injection wells. 15

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Texas Railroad Commission Established 1891 – oldest regulatory agency in Texas government 3 commissioners elected in statewide elections for 3 year staggered terms Primarily Texas regulator for energy industry –Hydrocarbon production –Pipelines –Mining –Alternative energy sources Does not regulate railroads 16

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Texas Injection Well Act Currently codified as Chap. 27 of Texas Water Code Regulates all forms of underground injection, including oil & gas production waste liquids Establishes permit requirement Requires notice to affected parties Provides for public hearing to address objections regarding permit applications Grants TRRC very broad authority to adopt rules to implement statute 17

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Texas Injection Well Act (cont.) In order to issue permit, TRRC must find: –The proposed well is in the public interest –The proposed well will not compromise any hydrocarbon or other mineral formation –The proposed well makes adequate provisions to protect groundwater and surface water –The applicant has sufficient financial resources to meet its obligations as operator of the proposed well 18

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide U.S. Safe Drinking Water Act Codified at 42 U.S.C. §300f et seq. Primary regulations for drinking water quality and water suppliers for all U.S. states Administered by U.S. Environmental Protection Agency (EPA) Regulates injection wells as an incidental threat to underground freshwater supplies Beginning in 1979, the EPA develops the Underground Injection Control (UIC) program to regulate injection wells 19

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Underground Injection Control Program As a result of state regulations and regulators that pre-existed the Safe Drinking Water Act, UIC program provides an option for a state regulator to be the primary regulator of injection wells in that state States that desire to be the primary regulator of the UIC program apply to the EPA State regulations must be at least as stringent as EPA regulations The TRRC is the primary regulator of the UIC program in Texas 32 other U.S. states are primary regulators and 7 other states share authority with the EPA 20

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide UIC Program Primacy Map 21

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide UIC Program Well Classes 22

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Interaction of U.S. and State Regulations Both U.S. federal and state regulatory programs are applicable in Texas –UIC Program regulations under the U.S. Safe Drinking Water Act –TRRC regulations under Texas Injection Well Act In Texas, the TRRC is the primary regulator for both the UIC Program and the TRRC regulations Permits issued by the TRRC are effective as Class II well permits under the UIC Program In other U.S. states, the EPA or a state regulator may be the primary regulator (or the EPA and state regulator may share authority) 23

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Types of Class II Wells Enhanced Recovery Wells inject brine, water, steam, polymers, or carbon dioxide into hydrocarbon formations to enhance production. Disposal Wells inject brines and other fluids associated with hydrocarbon production for long-term disposal. Hydrocarbon Storage Wells inject hydrocarbons in underground formations for temporary storage Distribution of well types –~151,000 Enhanced Recovery Wells (~80%) –~21,000 Disposal Wells (~20%) –~100 Hydrocarbon Storage Wells 24

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide U.S. State Injection Well Data U.S. states with highest number of Class II wells in 2011 Texas – 52,501 (530.2 MMbbl crude oil produced - #1 U.S. state) California – 47,624 (194.2 MMbbl - #3) Kansas – 15,919 (41.5 MMbbl - #9) Oklahoma – 10,854 (77.9 MMbbl - #5) Illinois – 7,858 (9.2 MMbbl - #14) Wyoming – 5,005 (54.7 MMbbl - #8) New Mexico – 4,616 (71.3 MMbbl - #6) Louisiana – 3,676 (69.0 MMbbl - #7) 25

Permitting Process and Operations 26

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Objectives of Permitting Process Provide information with permit application that allows TRRC staff to assess the proposed well –Protection of groundwater –Protection of surface landowners –Protection of hydrocarbon producing formations Notification of interested parties to allow investigation and protest –Broader notification requirements if the proposed well will be used to dispose of brine produced by other operators for a fee (Commercial Disposal Well) 27

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Overview of Permitting Process Provide notice to interested parties & publish in local newspaper File application and required supplemental information Pay application fees TRRC staff reviews the application Permits are generally issued within 45 days of filing a complete application (unless protested) Permit must be issued before drilling or injection can commence 28

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Application Forms Form W-14 Application for well to dispose brine into a geologic formation that does not have past or current production of hydrocarbons within a 2 mile radius of the proposed injection well (a Non-Productive Formation) Form H-1/H-1A Application for well to dispose brine into a geologic formation with past or current production of hydrocarbons within a 2 mile radius of the proposed injection well (a Productive Formation) Also used to apply for well that is capable of disposal into both Productive and Non-Productive Formations 29

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Application Fees Wells in Productive Formations - $500 per well Wells in Non-Productive Formations - $100 per well Additional fee for each exception requested - $375 Fees are not refundable 30

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide General Permitting Requirements Operators of proposed wells are required to address the following areas of concern through the permit process: Determine the maximum depth of groundwater sources that require protection (Base of Useable Quality Water) Determine that the geology in the area of the proposed well has appropriate segregation Determine the appropriate Area of Review for existing wells or other issues that may compromise the proposed well Provide interested parties notice regarding the proposed well 31

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide General Permitting Requirements (cont.) Publish required notice regarding the proposed well Determine the depth of Surface Casing required to protect groundwater sources Determine the depth of Production Casing required to isolate the well from formations that will not be used for injection Determine the appropriate placement of Tubing and Packers to isolate the formation that will be used for injection Determine appropriate surface facility safety and security measures 32

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Permit Processing Preliminary Review - In order for the permit application to undergo technical review, the operator of the proposed well must meet requirements: –The operator applicant must have a current organization report on file with the Commission and be in good standing –The operator applicant must be the current operator of the lease containing the proposed well Technical Review – The TRRC technical staff must review applications within 30 days to insure complete information is provided and all permit requirements have been met –If the application is complete and satisfies all permit requirements, the staff will notify the applicant that the application is complete –If the application is incomplete or does not satisfy all requirements, the staff will request additional information 33

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Permit Processing (cont.) Request for Additional Information –The TRRC staff will send a letter to the applicant requesting the additional information –The staff has up to 30 days to evaluate any additional information filed by the operator –If the application is not completed after 2 requests for additional information, permit application will be denied Final Review – After the complete application is filed and the preliminary and technical reviews are complete, the TRRC has 15 days to complete any final review and issue an approval or denial of the application If an application is denied, the applicant may appeal the denial to the full TRRC 34

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Essential Geological Requirements The injection formation of the proposed well must be isolated from usable quality groundwater and hydrocarbon production formations by a relatively impermeable rock formation generally at least 250 ft. thick 35

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Well Log The applicant must submit an electric well log to identify the injection formation and segregating formations of impermeable rock Electric well logging tests the electrical resistivity of the formations contacted by the well to identify the depth and thickness of each formation If a well log is not available for the proposed well, the applicant may submit a log of a nearby well and identify the logged well on the area review map submitted with the application 36

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Well Log Example 37

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Groundwater Depth Determination Application must include a letter issued by the Groundwater Protection Unit of the TRRC (GPU) that determines the Base of Usable Quality Water in the area of the proposed well The Base of Usable Quality Water defines the lowest depth of useful groundwater for human/animal consumption and agricultural irrigation Base of Usable Quality Water is determined by the GPU based on case-by-case reference to government database of information 38

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Types of Aquifers 39 Unconfined aquifers are generally closest to the surface and most often used for human/animal consumption and agricultural irrigation Confined aquifers are separated by impermeable rock layers. found in deeper depths They may be salinated to lesser degrees than brine or have other natural contaminants

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Base of Usable Quality Water Variance ft. 3,900 ft. 100 ft. 300 ft. 250 ft. 1,650 ft. 800 ft. 1,275 ft. 1,500 ft.

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Review of Area Wells The permit application must include an analysis of all existing wells that penetrate the proposed injection formation within a ¼ mile (~400m) radius of the proposed well Confirm existing wells are active and correctly functioning wells or have been plugged in a manner that will prevent the movement of fluids into formations other than the authorized injection formation Application must include a map all wells within a ¼ mile radius of the proposed well showing the total depth of each well 41

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Review of Area Wells (cont.) Application must include a table including information for each well within the ¼ mile radius: –Lease name and number –Well number –API number –Total depth –Date drilled –Current status and plug date (if applicable) 42

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide TRRC Well Mapping Application 43

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide TRRC Well Map 44

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide TRRC Well Map 45

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Example of Application Well Map 46

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Example of Application Well Information Table 47

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Notice to Interested Parties A complete copy of the completed permit application form must be mailed or delivered to the following interested parties: The surface owner of record (as recorded in county deed or tax rolls) Adjoining surface owners of record (if application is for a commercial disposal well) All operators of other wells within ½ mile (~800m) radius of the proposed well 48

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Notice to Interested Parties (cont.) The county clerk The city clerk if the proposed well is located within city boundaries The TRRC “recommends” including with the notice a cover letter that explains the nature of the application Applicant must submit a signed statement listing name, address, and basis for interest (e.g. surface owner, nearby operator, etc.) and the date that a copy of the application was mailed or delivered to each interested party 49

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Publication Notice of the application must be published once on the day before permit application is filed in a newspaper of general circulation in the county where the prospective well is located Formation, field, lease and whether the target formation is productive or non-productive of oil and gas Description and depth of the injection formation Well number Direction and distance to the nearest town Instructions regarding how to obtain further information or protest the application 50

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Publication (cont.) Applicant must submit the following information with the application: Notarized affidavit of publication and a certification that the newspaper has general circulation in the county where the proposed well is located Newspaper clipping. 51

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Example of Published Notice 52 NOTICE OF APPLICATION FOR FLUID INJECTION WELL PERMIT Kinder Morgan Production Co LLC has applied to the Texas Railroad Commission for permit to inject fluid into a formation which is productive of oil or gas. The applicant proposes to inject fluid into the Strawn Sandstone formation, Katz (Strawn) Unit, well 442. The proposed injection well is located 16.8 miles Northeast of Old Glory, Texas in the Katz (Strawn) Field, Stonewall County. Fluid will be injected into strata in the subsurface depth interval from 4750’ to 5600’. LEGAL AUTHORITY: Chapter 27 of the Texas Water Code as amended, Title 3 of the Natural Resources Code, as amended, and the Statewide Rules of the Oil and Gas Division of the Railroad Commission of Texas. Requests for a public hearing from persons who can show they are adversely affected or requests for further information concerning any aspect of the application should be submitted in writing within 15 days of publication to the Underground Injection Control Section, Oil & Gas Division, Railroad Commission of Texas, P.O. Drawer 12967, Capitol Station, Austin, Texas Phone: 512/

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Wellbore Protection Components The applicant must submit information regarding the placement of casing, tubing and packers for review by TRRC staff Surface Casing – shallowest and thickest level of casing principally used to protect groundwater Intermediate casing – casing sometimes used (particularly in deeper wells) to strengthen the wellbore Production casing – casing used to protect the injection formation Tubing – injection tubing that delivers the injected fluid to the injection formation Packer – blocking collar that prevents backflow of fluid between the tubing and production casing 53

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Casing Diagram 54

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Surface Casing The TRRC has determined that injection wells carry inherently higher risk to groundwater than production wells and should have the maximum level of groundwater protection Generally, surface casing must be set to the Base of Useable Quality Water determined by the Groundwater Advisory Unit of the TRRC and cemented to the surface With respect to an existing production well that is proposed to be converted to an injection well, if the existing surface casing does not extend through the Base of Useable Quality Water, the TRRC may approve an injection permit with additional protection and increased testing and monitoring 55

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Examples of Surface Casing Depth Variance 56

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Production Casing Production casing must be set through the injection formation and cemented from the casing shoe to ft. above the top of the injection formation. Since January 1, 2014, casing must also be cemented across and above all productive formations, potential flow zones, and zones producing corrosive fluids 57

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Tubing and Packer Generally, all proposed wells must be equipped with tubing set with a packer Proposed wells permitted to inject into a Non-Productive Formation must have a packer set within 100 ft. above the injection formation Proposed wells permitted to inject into a Productive Formation must have a packer set within 200 ft. below the top of cemented production casing AND at least 150 ft. below the Base of Useable Quality Water If there are potentially permeable formations between the proposed packer setting depth and the proposed injection interval, the packer must be set below those formations if the application does not propose injection into those formations 58

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Tubing and Packer Diagram 59 Water from surface Surface Casing Cement Production Casing Perforation Tubing Packer Injected Water through perforation

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Surface Requirements In addition to requirements regarding downhole completion, the TRRC requires surface safety and security measures: Construction of surface facility components (pits, catch basins, brine storage and treatment components, etc.) must meet minimum specifications Dikes to prevent spill migration must be constructed around all storage, treatment and injection components The surface facilities must have security measures to prevent unauthorized access, including fencing (or other barriers to entry) and a lockable gate All storage tanks must be equipped with a device (visual gauge or alarm) to alert personnel when the tank is within 130 barrels of its capacity 60

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Protest & Hearing An interested party that objects to the creation of the proposed well may protest and request a hearing Protest must be filed within 15 days of receipt of notice Protesting party must show that it has or will suffer actual injury or economic damages as a result of the well Members of the general public do not have standing to protest the well Initial hearing is held before an examiner employed by the TRRC 61

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Protest & Hearing (cont.) The examiner issues a written report that recommends a course of action to the TRRC The TRRC makes a determination regarding the protest at a public meeting Full protest generally requires 6-12 months to complete 62

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Post-Permitting Operation Reports Completion Report – filed within 30 days after completion –Casing and cementing record –Packer depth –Injection zone – must report actual depth of perforation –Indicate if a cement squeeze was performed Mechanical Integrity Test Report – a successful integrity test must be performed before any fluid injection –Additional integrity tests must be performed at least every 5 years Annual Monitoring Report provides monthly injection volume for subject year 63

Takeaways 64

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Takeaways Groundwater protection continues to be a critical issue of concern for both regulators and the public –Subsurface migration of fluids –Disclosure of chemicals contained in injected fluids Continuing discussion regarding expansion of notification requirements –Groundwater Conservation Districts –Larger area of surface and subsurface owners 65

Sub-Title Top Guide 6.22 Chart-Title Top Guide 5.35 Body Top Guide 4.16 Body Bottom Guide 7.80 Left guide Right guide Takeaways (cont.) Geologic variations make accurate data sources critical –Groundwater depth –Geologic formations –Other wells that penetrate to injection formation Cemented casing is regarded as the best protection for well integrity –Surface casing through full depth of groundwater –Production casing through all injection and production zones 66

Questions?

Thank You!