North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.

Slides:



Advertisements
Similar presentations
The Midwest ISO from a Transmission Owner Perspective.
Advertisements

MISO Day 2: A Transmission Users (Marketers) Perspective Leon White August 8, 2007.
1 July 15, 2007Alcoa Energy Regulatory Affairs NARUC / FERC Demand Response Collaborative Perspectives of a Large End Use Participant of NYISO Programs.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Demand Response in New York State Northwest Power and Conservation Council DR workshop February 24, 2006.
Resource Adequacy in PJM
NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Topics The Midwest ISO The Midwest Market Market Design Process
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
PJM© PJM as Part of the Eastern Interconnection KEY STATISTICS PJM member companies 750+ millions of people served 60 peak load in megawatts.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
Electric Utility Basics An overview of the electric industry in New England and the operation of consumer-owned utilities 1.
The Continuing Evolution of U.S. Electricity Markets
NATIONAL GRID Market Evolution in Ireland APEX 2004 Annual Conference Ann Scully Manager, Market Operations ESB National Grid.
New Zealand & Australian Wholesale Electricity Markets A Comparative Review Dr Ralph Craven Transpower NZ Ltd.
Overview of LMP Markets Features of ISOs / RTOs David Withrow Senior Market Economist Fall 2007 Meeting of the NARUC Staff Subcommittee on Accounting and.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Vanus J. Priestley Philip R. O’Connor. Ph.D.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
Demand Response in Midwest ISO Markets February 17, 2008.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Overview of the Capacity Markets in the United States 2008 APEX Conference in Sydney, Australia October 13-14, 2008 Hung-po Chao Director, Market Strategy.
EPSA REGULATORY AFFAIR CONFERENCE 2006 Washington, DC October 25, 2006 Garry Brown Vice President, External Affairs New York ISO.
1 Capacity Markets Investment in Generation Capacity Payments October 31, 2005 J. W. Charlton.
Texas Wind Energy American Meteorological Society Summer Community Meeting – Norman Oklahoma Henry Durrwachter, P.E. August 12, 2009.
PJM©2013www.pjm.com Deployment of smart-grid technologies – Technology and market challenges Stu Bresler VP, Market Operations PJM Interconnection University.
Bulk Power Transmission System
California Independent System Operator A Comparison Between The CA ISO’s Market Design 2002 Proposal (MD02) and the FERC’s Standard Market Design (SMD)
1 Electricity System and Energy Market Basics David J. Lawrence Manager, Auxiliary Market Products Prepared for: RGGI I&L Workshop June 15, 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
PJM©2012www.pjm.com PJM’s Experience with Capacity Markets Terry Boston President & CEO PJM Interconnection Power Across Texas September 21, 2012.
Review of CAISO Wholesale Electricity Market Trends APEX Sydney Conference California Electricity Wholesale Market Trends October 13, 2008 Anjali Sheffrin,
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Congestion Hedging Process Transmission Planning Summit September 21-22, 2011.
Texas Nodal Team Cost Benefit Group Background to Standard Market Design in New England March 2, 2004 Michael Taniwha Manager, Market Administration ISO.
©2003 PJM North American Markets Status APEx Seoul, Korea October 29-31, 2006 Kenneth W. Laughlin.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
1 Progress of Market Integration in North America W. Scott Miller, III Executive Director, Market Applications PJM Interconnection, L.L.C.
Powering a Reliable and Sustainable Energy Future for Ontario Bruce Campbell, President and CEO, IESO March 3, 2016.
1 A Conversation about MISO Paul Spicer November 8, 2007.
The Midwest ISO – Platform to Meet Tomorrow’s Challenges Wisconsin Industrial Energy Group August 7, 2008.
Wind Management at MISO
The New Texas Wholesale/Retail Market
North American Markets Status
Electricity Wholesale Markets: Designs for a low-carbon future
The Future of Demand Response in New England
بازار برق: مباني، انواع و نهادها مقدمه بازار برق: تاريخچه، زمينه‌ها و كاستي‌ها تاريخچه زمينه‌‌هاي مقررات‌زدايي كاستي‌ها انواع بازارهاي برق رقابت‌پذيري.
31st USAEE/IAEE North American Conference
California ISO’s CIM Based Model Management
Presentation transcript:

North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM

North American Wholesale Electricity Markets

AESO Peak Load 9661 MW, November 2006 Postage Stamp Transmission Pricing Some transmission congestion beginning to be experienced C$5 billion in new transmission upgrades by 2016 Full Retail Access Regulated Rate Option available to small consumers Energy Only Market No plans to implement capacity market Separate market for ancillary services

California ISO Peak Load 50,270 MWs Zonal energy market with redispatch to manage congestion within zones Comprehensive market redesign in progress – expect to move to nodal pricing in March 2008 Resource adequacy requirement on load serving entities to demonstrate 115% of load can be met; capacity markets under discussion, decision expected in 2008.

ERCOT Peak Load 62,339 MWs 85% of Texas; Not subject to FERC other than reliability provisions of 2005 Energy Policy Act; 5 DC Ties 38,000 miles of Transmission Firm Transmission (PTP only) 71,800+ MW of Generation Centralized registry for 6 million retail choice customers Nodal pricing in 2009 Energy only

ISO New England Peak Load 28,000 MW Implemented nodal pricing in 2003 Implemented wholesale markets in 1999 Locational Forward and real-time reserve markets New forward capacity market auction in February 2008 for capacity in June 2010 Major new transmission projects completed or under construction

MISO RTO Peak load 129,647 MWs set July 21, 2007 Market opened 1 April 2005 Full nodal real time and day-ahead energy markets Territory encompasses fifteen states and one Canadian province Simultaneously co-optimised energy & ancillary services markets under development No capacity market envisioned

NBSO Peak Load 3,187 MW Postage Stamp Transmission Pricing - no significant transmission constraints Physical Bi-Lateral Market - Wholesale & Industrial Retail Participation - Resource Adequacy Requirement on Load Serving - Entities - Single Node Energy Imbalance Market Demand Response Under Development

New York ISO ♦Energy: Real-Time and Day-Ahead full nodal ♦Ancillary Services: RT and DA ♦Co-optimized with energy in both RT and DA ♦Spinning and non-spinning reserves with scarcity pricing ♦Regulation ♦Installed Capacity (ICAP) – locational markets ♦Transmission Congestion Contracts (TCCs) ♦Virtual trading for both supply and demand ♦Demand Side Resources may participate in the energy and capacity markets (ancillary services under development)

Ontario Market Operator Peak Load 27,000 MWs 5 minute wholesale spot market, single market clearing price Design of future Day-Ahead Market currently being discussed with stakeholders Development of new generation underway via centralized contracting to allow the shutdown of all coal plants by 2014

PJM Peak load 145,000 MWs Full nodal markets (real time and day-ahead) Integrated five additional companies into market area between 2002 and Implemented a locational capacity market in 2007 August 2007 monthly billing > $ 4,000,000,000

SPP Peak Load 43,346 MW, August 2007 Full nodal energy imbalance energy market operational in February 2007 Transmission Services market No retail open access in footprint

Peak LoadNodal pricing Retail Markets Capacity market AESO 9661 NoYesNo California ISO 50, No under discussion ERCOT62, YesNo ISO-NE28, YesYes. (locational in 2008) MISO129, PartialNo NYISO34, YesYes. And additional forward markets under discussion. NBSO3,187NoPartial No Ontario Market Operator IESO 27,000NoYesFuture PJM145, YesYes (locational). SPP43, No Future