Culebra, Puerto Rico: Multi-Hazard Risk Assessment and Vulnerability Risk Assessment GEOL 4093.

Slides:



Advertisements
Similar presentations
Guidance Notes on Safe Health Facilities Sanjaya Bhatia Focal Point Disaster Resilient Schools & Hospitals.
Advertisements

1 IS:01UDM -2 CONCEPTS IN HAZARDS TALK 1 NATURAL PHENOMENA OF LAND, SEA AND ATMOSPHERE. n HAZARD DUE TO RELEASE OF STRESS n TRIGGER EVENTS: NATURAL i.e,
EXERCISE IN MITIGATION DECISIONS MODULE 2 THE MULTI-HAZARD ENVIRONMENT.
New Mexico Infrastructure Finance Conference, October 28, 200.
Bush Fire Risk Management Planning Community Participation Department of Lands, National Parks and Wildlife Service, Integral Energy, Rural Fire Service,
Options for Mitigation and Adaptation Technologies for the Pacific Island Countries by Mahendra Kumar South Pacific Regional Environment Programme, Apia,
FEMA NFIP Community Rating System and Crediting Tsunami Mitigation Mike Mahoney, FEMA Mitigation.
What is HAZUS-MH? HAZUS-MH is a planning tool that estimates
Geology 100 Topics The Earth-its layers and general composition, types of crust Plate Tectonics and Boundary types Basic Rock Types: Igneous, Metamorphic,
Some Notions for your Research Project 1.FEMA Project - Recording High Water Marks from the December Flood Event in North Creek and Bear Creek Need at.
Tasks in Step Two: Assess Hazard Vulnerability Session Name: Hazard Mitigation Planning II Coastal Hazards Management Course 2.1 Describe the community.
Critical Infrastructure Protection and Higher Education: University of California Hazard Vulnerability Assessment Kristine Hafner University of California.
Federal Emergency Management Agency Donna M. Dannels Director, Policy and Assessment Division Mitigation Directorate.
Foster and sustain the environmental and economic well being of the coast by linking people, information, and technology. Center Mission Coastal Hazards.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
Natural Hazards Science: Reducing America’s Risk Hazards are inevitable; disasters are not. Mount St. HelensMount St. Helens 03/08/05 Mount Pinatubo.
Ecosystem Vulnerability Profile. Ecosystem Resources Vulnerability Profile What values and benefits do natural resources provide? What natural resources.
23 rd September 2008 HFA Progress Report Disaster Risk Reduction in South Asia P.G.Dhar Chakrabarti Director SAARC Disaster Management Centre New Delhi.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Pacific Island Countries GIS/RS User Conference Suva, Fiji November 2010 Tools for Disaster Risk Management and Climate Change Adaptation Abigail Baca.
Mitigation can include structural and nonstructural efforts.
Quinault Indian Nation Long Range Hazard Mitigation and Adaptation Planning.
Department of Homeland Security Federal Emergency Management Agency Region II - Caribbean Area Division.
Romania Hazard Risk Mitigation & Emergency Preparedness Project Aurel Bilanici Ministry of Interior and Administrative Reform.
Risk Assessment Public Safety Geoscience Program – Earth Sciences Sector Centre for Natural Hazards Research Nicky Hastings, Bert Struik, Murray Journeay,
Infrastructure Profile Consider strengths and vulnerabilities of the built environment.
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
Hazards Profile Understand your relevant hazards.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
Climate Change Risk Assessment Tool. Weather & Climate.
Using HAZUS-MH to Assess Tsunami Risk Bill Bohn, Tetra Tech June 19, 2007.
Emergency Preparedness Demonstration (EPD) Project Community Leadership & Emergency Management Agencies.
Welcome to the Roadmap for Adapting to Coastal Risk Virtual Training! The call-in number is (877) Password: Please be sure to mute your.
High Risk Zones. Hazards: –Earthquakes –Volcanoes –Landslides –Floods –Drought –Cyclones.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
The World Bank’s Role in Disaster Mitigation Financing the Risks of Natural Disasters June 3, 2003 Alcira Kreimer Manager, Disaster Management Facility.
Natural Disaster Reduction and Risk Assessment – Role of USGS Tim Cohn Science Advisor for Hazards U.S. Department of the Interior U.S. Geological Survey.
Buildings in Harm’s Way May 19, 2014 Local Solutions Conference Manchester, NH.
February 27,  Welcome/Introductions  Overview of the Plan  Updates on Information Request  Project Prioritization  Public Involvement Meeting.
Hazard Mitigation Plan An Overview. What is Hazard Mitigation? Action taken to reduce or eliminate long-term risk Long term impact Different from –Preparedness.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
Sustainable/Resilient Communities in Monmouth County September 10, 2008 Sea Level Rise & Coastal Resiliency Jon K. Miller 1 & Thomas O. Herrington 2 1.
Catharine Cyr Ransom Principal The Accord Group. Stafford Act Structured approach to disasters Partnership between local, state, Federal governments Authority.
Assessing the Risk and Vulnerability of NH Coastal Communities to Sea Level Rise and Storm Surge FROM TIDES TO STORMS: PREPARING FOR NEW HAMPSHIRE’S FUTURE.
Infrastructure Vulnerability Profile. Objectives: To identify key infrastructure concerns related to the pre-defined hazards and issues Identify needed.
1 Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
Capital Improvements & Infrastructure: Hazards Profile #1 - Current Hazards Risks & Impacts Looking at the hazards maps and data, what locations, impacts.
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner.
©2010 Elsevier, Inc. Chapter 3 The Disciplines of Emergency Management: Mitigation.
Specific Hazard Impacts and The Asian Tsunami 2004 By the end of this lesson you will: Be able to explain some of the key specific human impacts of tectonic.
Metro Boston South/West Regional Multi-Hazard Mitigation Plan Medfield Annex Board of Selectmen Public Meeting April 7, 2008 Joseph Domelowicz Jr. Martin.
Janice Rahman Program Manager Metropolitan King County Council Law, Justice, Health and Human Services Committee May 14 th, 2013 HAZARD MITIGATION A Regional.
 Welcome/Introductions  Overview of the Plan  Updates on Information Requests  Plan Discussion  Hazards/Gaps/Actions/Priorities  Next Steps.
Using HAZUS-MH for Comprehensive Planning Bill Bohn, Tetra Tech June 20, 2007.
ArcGIS for Environment and Natural Resources– An Overview Matt Bullock Nikki Golding.
THE NATURAL DISASTERS IN EACH CONTINENT: DROUGHTS, FLOODS, EARTHQUAKES AND VOLCANOES.
Climate Adaption and Resiliency
Multi-Hazard Environment
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Disaster and it’s management
Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
Risk Assessment Maps for Seaside OR
Atkins overview Highlights:
Caribbean Disaster Mitigation Project Implemented by the Organization of American States Unit for Sustainable Development and Environment for the USAID.
Presentation to Coachella’s City Council October 8, 2014
Disaster Mitigation Mitigation reduces the impact of disasters by supporting protection and prevention activities, easing response, and speeding recovery.
The Geodesign Process designing in geographic space Assessment Models
Risk Modelling & Impact Forecasting Tools
Tahsis Emergency Programming
Presentation transcript:

Culebra, Puerto Rico: Multi-Hazard Risk Assessment and Vulnerability Risk Assessment GEOL 4093

Sponsored by FEMA URS Greiner Woodward Clyde Council for Information and Planning Alternatives Culebra’s Project Impact, Inc.

Multi-Hazards Hazards –Floods, hurricane-strength winds, earthquakes (includes tsunamis), landslides Vulnerability –Homes, businesses, public facilities, infrastructure

Products Composite risk map –to assess future land use development Vulnerability analysis –with structure inventory –to evaluate mitigation priorities

Vulnerabilities Economics –Tourism most important Natural resources –National wildlife refuge Planning and development –Culebra Authority for the Conservation and Development Critical Facilities –Energy, water and sanitation, telecommunications, ports Infrastructure, transportation

Major concerns Riverine and coastal flooding Landslides Inappropriate retrofitting and rebuilding Education and a lack of hazard mitigation knowledge Inappropriate new construction and review process Technical and economic assistance