Keck AO Operations D. Le Mignant for the Keck AO team.

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

GSMT Control Workshop Tucson, September 11-12, 2001 Pointing Control for a giant segmented mirror telescope Patrick Wallace Rutherford Appleton Laboratory.
1 Keck LGS AO Planning Workshop: Overview, Requirements & Schedule December 5, 2004.
The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
LGS AO Operations Transition: Introduction to Meeting April 15, 2005.
NIR LOWFS for Keck and TMT Roger Smith & David Hale.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
LGS WFS Design Status & Issues Dekany, Delacroix, & Velur Caltech Optical Observatories.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
A Short Introduction to Adaptive Optics Presentation for NGAO Controls Team Erik Johansson August 28, 2008.
Keck Next Generation Adaptive Optics Team Meeting 6 1 Optical Relay and Field Rotation (WBS , ) Brian Bauman April 26, 2007.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
LO WFS Summit 6/19/2015Richard Dekany A Joint Meeting of the NGAO, IRIS, and K1 LO WFS Teams 12/15/2009.
WFS Preliminary design phase report I V. Velur, J. Bell, A. Moore, C. Neyman Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Demonstration of Science Observing Modes AOWG meeting Dec. 5, 2003 D. Le Mignant, A. Bouchez for the Keck AO team.
MMT AO run Jan Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
LGS-AO Performance Characterization Plan AOWG meeting Dec. 5, 2003 A. Bouchez, D. Le Mignant, M. van Dam for the Keck AO team.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/3/07.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
Agenda (Fri., June 7) 8:00AO UI Demonstration 9:00Introductions to AO team 9:05AOWG Chair Selection 9:15Review Agenda (make changes?) 9:20Review Planned.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
Week:#14 Windows Recovery
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 8: Implementing and Managing Printers.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
Keck Laser Guide Star Adaptive Optics System: 1 st & 2 nd Milestones AOWG Telecon Oct. 17, 2003 A. Bouchez, J. Chin, A. Contos, S. Hartman, E. Johansson,
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
P. Wizinowich & D. Le Mignant for Keck AO Team AOWG – June 6, 2002 Keck AO Overview to support summit tour.
WMKO Next Generation Adaptive Optics: AO System Design Impact of Cost Savings Ideas Don Gavel December 19, 2008.
NGAO NGS WFS design review Caltech Optical Observatories 1 st April NGAO WFS design, Caltech Optical Observatories.
The Gemini MCAO System (EPICS Meeting, SLAC, April 2005) 1 The Gemini MCAO System Andy Foster Observatory Sciences Ltd.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
TC2-Computer Literacy Mr. Sencer February 8, 2010.
Keck AO the inside story D. Le Mignant for the Keck AO team.
LGS AO Readiness for 05B AOWG meeting February 4, 2004 Keck LGS AO team.
MCAO Adaptive Optics Module Mechanical Design Eric James.
University of Management & Technology 1 Operating Systems & Utility Programs.
MAORI Lisa Rightmire Mentor: Marcos van Dam. What is MAORI?  The indigenous tribal people of New Zealand  Marcos’ Adaptive Optics Rectangular Interface.
Tucson, SW workshop Oct 2006 FLAO WFS software Alfio Puglisi, Fabio Tosetti Osservatorio Astrofisico di Arcetri, Florence, Italy.
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
Microscope Control Configuration This section of the QED manual will describe how to configure you Configure and Control your automated microscope. Mac.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Science with AO A. Bouchez for the Keck AO team. Topics Sample scientific programs. Observing strategies. Technical issues. Keck AO, K'
The Active Optics System S. Thomas and the AO team.
LINC-NIRVANAW. Gaessler 03/10/2006 LINC-NIRVANA Wolfgang Gaessler J. Berwein, F. Briegel, F. Kittmann, A. Pavlov, C. Storz MPIA (Germany),
D. Measurement Approach Phil Hinz Principal Investigator.
Guiding Control Subsystem (GCS) Overview
T Iteration Demo Team 13 I1 Iteration
TEMPLATE DESIGN © E-Eye : A Multi Media Based Unauthorized Object Identification and Tracking System Tolgahan Cakaloglu.
Page 1 Adaptive Optics in the VLT and ELT era Wavefront sensors, correctors François Wildi Observatoire de Genève.
COMMON INTERFACE FOR EMBEDDED SOFTWARE CONFIGURATION by Yatiraj Bhumkar Advisor Dr. Chung-E Wang Department of Computer Science CALIFORNIA STATE UNIVERSITY,
Charts for TPF-C workshop SNR for Nulling Coronagraph and Post Coron WFS M. Shao 9/28/06.
What Makes Device Driver Development Hard Synthesizing Device Drivers Roumen Kaiabachev and Walid Taha Department of Computer Science, Rice University.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
1# 3-D Morphology of V723 Cas Nova Ejecta KeckII+LGSAO+OSIRIS Randy Campbell and Jim Lyke Hα images from Classical Novae, ed. Bode and Evans, Ch 12, O’Brien.
KECK INTERFEROMETER KISWG 10/29/20031 ORR Readiness Mark Colavita & Peter Wizinowich KISWG Pasadena 10/29/2003.
January 2010 – GEO-ISC KickOff meeting Christian Gräf, AEI 10 m Prototype Team State-of-the-art digital control: Introducing LIGO CDS.
ALPAO ACEfast RTC Armin Schimpf, Mickael Micallef, Julien Charton RTC Workshop Observatoire de Paris, 26/01/2016.
LOGO “ Add your company slogan ” Final Project Group: T2H2 Mai Thi Thu Nguyen Van Thanh Do Van Huu Pham Ngoc Huy Supervisor: DungHA TrungNT T2H2 Group:
LCLS Commissioning & Operations High Level Software
Keck Observatory Status
Software Design Team KANG Group 1.
LCLS Commissioning & Operations High Level Software
NGS AO Control Light from Telescope Telescope pointing offload
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Presentation transcript:

Keck AO Operations D. Le Mignant for the Keck AO team

Topics AO refresh AO operation at a glance About the operation tools Troubleshooting session

AO = Adaptive Optics Control loop for canceling out the optical aberrations introduced mostly by the atmosphere (WFS, WFC, TT, DM,etc). Tracking devices (ROT) and slewing devices (FSMs, FCS, FSS) Telescope guiding and focusing. Is this a transparent process?

ROT Pupil re-imaging Dichroic TT DM FSMs WFS

Optics Bench Devices obs eng. screen wfc eng. screen AOA camera Wavefront Controller AO supervisory control Telescope DCS IDL Java User Interface pro files slk autom. units cshow epics channels Software Architecture Epics kwd server

AO at a glance: what it could be…  Run nighttime script  Slew to reference star  Acquire star on WFS  Run auto AO setting script  Go to next object  Acquire star on WFS  Etc..  Run Halt AO script

What is it : 1. Nighttime script 2. Slew, acquire reference star 3. Check FSM POs and run auto AO setting 4. Coordinate rotator slew 5. Watch for problems 6. etc 1. Need to be simplified 2. Ok, watch PO and/or use pixel location 3. Reliable, yet not optimized for IF and survey mode 4. Automation needed 5. Auto-recovery and automation needed

What has been our strategy so far.. K2AO/K1AO need to be modified for dvlpt. Yet, we routinely operate them for science. After many years, OPS software still evolving.. New feedback from OAs Changes being implemented AO handover will provide a strict baseline for NGS AO operation Science version vs dvlpt version Reliable, high performance and easy-to-use

JAVA IDL

Optics Bench Devices obs eng. screen wfc eng. screen AOA camera Wavefront Controller AO supervisory control Telescope DCS IDL Java User Interface pro files slk autom. units cshow epics channels Epics kwd server

IDL widgets and scripts AO Acquisition widget:  Watchdog tasks  Rotator, FSMs fault  WFC crash  Set AO!  Scripts:  Auto AO setting  Set FSMs  Set AO parms  Record WFS backgrd  Iterate once and exit  Auto-recovery scripts  AO/DCS coms  FSMs, Rot fault  Update Cog

Java and other tools 1. Java screens 2. Some value displayed are - EPICS keyword server - automation units kwds 3. WFS config. / rot position call automation units

JAVA IDL

The most common problems (random order) WFC crash FSMs Fault Rotator Fault DCS/AO communication AO loops not closed GUIs not responsive Poor AO correction

Telescope nod with AO NIRC2: sends nod request to telescope waits for AO (wait4tt, wait4dm, wait4fcs) DCS/AO handshake : DCS request to AO : pause DCS : moves telescope request to AO : resume AO: Open AO loops (aoloop=open/restore) acknowledges AO: converts nod in FSM X, Y moves Send FSM moves Close AO loops (aoloop=restore) acknowledges AO In parallel to FSMs moves, WFS focus repositioned NIRC2: Resumes

Nodding using FSMs FSMs : 2 mirrors / 4 actuators + encoders Moves image on the WFS Maintains DM to lenslet pupil registration --> Any coordinated moves requires driving all 4 actuators Moves take <10sec Tight space See hardware

AO/DCS communication SC TT offloading Focus offloading FSM nod AO loops (aoloop kwd) DCS Telescope guiding Secondary focus adjustment

Restart AO/DCS communications Open all loops (TT, DM, TT and focus offloading) Set aoloop kwd to open Reset automation units to record WFS background Zero-out the DT control offset (used for DAR and KAT offload) Reload the last-used centroid origin file for the WFC Run DCS script to set AO TT offload as inputs for telescope guiding Close TT and focus offloading Does not close TT and DM loops

AO Loops Wavefront Controller Supervisory Controller DCS DM TTM WFS DM Loop TT Loop Telescope Pointing TTO Secondary Mirror Piston WFO

WFC crash (see web page) WFC running at 672Hz TT controller and DM controller, Fault likely comes from DM controller Fault detection not obvious Bad image quality! WFS intensity not updating, wyko frozen AO loops not responsive Once Fault detected, one needs to reboot WFC No Calibrations needed BUT need to run the nighttime script again and auto AO setting script We are working on Better fault detection Full auto-recovery script

Rotator operation Rotator is a tracking device with two modes (Position Angle, Vertical Angle) Position is fixed by the astronomer Rotator slew are cumbersome: AO loops open Star on-axis (within few arcsec) After rotator slew Close loops Wait for new reconstructor

Rotator fault OBS/DCS communication used to drive the rotator Fault modes: Invisible: rotator does not report any fault But acquisition does not work Visible: FACSUM reports FAULT Mechanical? OBS/DCS coms? See web page for troubleshooting