Lithuanian TSO view on the Baltic electricity market development Robertas Staniulis 14th Baltic Electricity Market Mini-Forum, Riga September 21, 2012.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Baltic Energy Market Interconnection Plan (BEMIP)
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
1 MARKET OPPORTUNITIES AND BARRIERS Speaker: Vidas Čebatariūnas Commercial director UAB Energijos realizacijos centras.
© Copyright 2010, The NASDAQ OMX Group, Inc. All rights reserved. Regional cooperation in implementation of innovative CSD solutions, ESTONIAN CSD / October.
Electricity Regional Initiative Northern Europe Region By: Finn Dehlbæk, Regulator Danish Energy Regulatory Authority (DERA) Creating a Single European.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Copyright Nord Pool Spot AS © June 27, 2006Anders Plejdrup Houmøller1 The KONTEK bidding area Anders Plejdrup Houmøller General Manager Nord Pool Spot.
Gent Summer School: Electricity Markets & Trading Gregory Michiels 27 August 2013.
Regulatory challenges in the Baltic electricity market(s) in connection to development of new nuclear power plant project(s) in the Baltic countries Andres.
Stocktaking of Nordic-Baltic cooperation: interests, values and learning Prof. Dr. Ramūnas Vilpišauskas Director of the Institute of International Relations.
NORD POOL Market Integration: Nordic Countries APEx 2003 Conference, Catagena de Indias – Colombia, October 14 & Torger Lien, President & CEO.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Copyright BlueLime Consulting © July 30, 2010Anders Plejdrup Houmøller 1 How to integrate and utilize wind energy in a liberalized electricity market Anders.
The Market Coupling Experience in Europe Jean-François CONIL-LACOSTE CEO Powernext SA CEO EPEX Spot SE APEX 2008 Conference Session 1 - Part 3: European.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Open market coupling 1 Open Market Coupling 2nd Miniforum/ Stakeholder Meeting in ERI Northern Europe Copenhagen, June 27, 2006 Dr. Frank-Peter Hansen.
The European Electricity Market Integration and some Thoughts on Gas Markets Market Coupling and Ways Forward Lene Sonne Vice President, Market.
Generation and transmission interconnections 4 July, 2013 Virgilijus Poderys CEO of LITGRID AB.
SUMMARY OF THE IG DISCUSSION PAPER ON THE BALANCING IN THE BALTICS Aistija Zubaviciute, NCC Baltic Electricity Market Mini-Forum 23rd November 2006, Vilnius.
Croatian Power System 1 The Electric Power System - Croatia -
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
José Sierra, RIG Chair Rafael Gómez-Elvira (RIG Chair Team) XIX Florence Forum 14 December 2010 ERGEG Electricity Regional Initiatives Status Review.
0 Congestion management Congestion management Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius.
Nord Pool Spot and Europe
BEMIP implementation WG meeting summary 9 th Baltic Electricity Market Mini-Forum September 16, 2009, Vilnius.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute National Control Commission for Prices and Energy 3 April 2007, Riga.
Update on electricity market Baltic Mini Forum 1 October, 2010.
Market design and fair transmission tariffication - things to improve for better competition Gatis Junghans Project manager Electricity Trade Department.
Is there a need for a change?
BALANCING IN THE BALTIC REGION WG CONCLUSIONS Ingrid Arus Riga/ Baltic Mini-Fora meeting, 24 th of April 2009.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Märt Ots Estonian Competition Authority Baltic Electricity Market Forum Riga Latest developments in Estonia.
European Commission views on intra-day and balancing markets
IFIEC EUROPE 1 ERGEG Consultation 30 June Brussels Industrial customer perspective Peter Claes President - IFIEC Europe.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Trade nuances of electricity market in Lithuania 1 Jurmala 1 st of October 2010 Erikas Miliukas Head of Electricity Import-Export Division.
General support to Northern Europe ERI priorities. Urges the Northern Europe RCC to proceed – not only with - Optimizing the use of interconnectors - Transparency.
1 ELECTRICITY REGIONAL INITIATIVE BALTIC REGIONAL ELECTRICITY MARKET Dace Bite Public Utilities Commission Latvia Creating a Single European Energy Market.
Market mechanisms in Norway / Nordel Reserves Adequacy and Demand Response. Security of supply. Grid Operation Division, Bjørn Walther.
BALTIC BALANCING MARKET Ingrid Arus Baltic Balancing Market Harmonisation WG meeting
1 IG Meeting Milan, 18 th July 2008 Cost of Firmness of Capacity.
Congestion Management Mr Carlo Crea AEEG, Italy The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007.
All Island Single Electricity Market IWFA Update Laura Brien
1 Regulatory trends in Poland Energy Regulatory Office Department for Promotion of Competition 16th September 2009.
Development of electricity market in Lithuania 2010 Lina Skrabutėnaitė Baltpool UAB Kuressaare
ERGEG – Stakeholder Meeting Tuesday 14 th November 2006.
Nord Pool Spot update 11th Baltic Electricity Market Mini-Forum October 01, 2010 Hando Sutter, Nord Pool Spot AS.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
SESSION 1 - PART 1: EUROPEAN MARKETS SITUATION “MARKET TRANSPARENCY SITUATION IN EUROPE” Maria luisa Huidobro President & CEO of OMEL 2006 APEX Conference.
Electricity Regional Initiative Central- South Region Progress with developing regional electricity markets By: Carlo Crea, Secretary General The Regulatory.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
Ojārs Kehris Economist Association 2010 President Energy market and security of supply in the Baltics – Latvia, Lithuania, Estonia Reforming Infrastructure.
Power market structure and market price development in the SEE region
Market opportunities and barriers
Market Coupling and Ways Forward Lene Sonne Vice President, Market
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Latest developments in Estonia
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
BEMIP implementation WG meeting summary
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
International Conference
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Baltic Energy Market Interconnection Plan (BEMIP)
Presentation transcript:

Lithuanian TSO view on the Baltic electricity market development Robertas Staniulis 14th Baltic Electricity Market Mini-Forum, Riga September 21, 2012

From 18 th June, 2012 Lithuania – in the Nord Pool Spot map

Changes in Baltics from 18 th June, 2012 (1) Lithuanian bidding area opening ► LT–LV: Separate trading portfolio for each market participant trading from (to) Latvia or (and) Estonia. Trade results are netted. ► LT–KAL (RU): One trading portfolio for one participant trading ► LT–BY: Separate bidding areas for import export with portfolios per each market participant. Trading portfolio per each market participant Trading portfolio Trading portfolios per each market participant to import to Lithuania Trading portfolios per each market participant to export from Lithuania

Changes in Baltics from 18 th June, 2012 (2) ELE bidding area ► ERI (Estonia Russia import area stays the same) ► ELE represents Estonian Latvian import-export area ► ELE price is calculated and flow between Estonia and Latvia is published Estonia (EE) Estonia Russia Import area (ERI ) Estonia Latvia Import area (ELI) Estonia Latvia Export area (ELE) Estonia (EE) Estonia Russia Import area (ERI) Estonia Latvian Exchange area (ELE) 18 June

Litgrid and Elering became the shareholders of NPS ► 1 st August, 2012 Litgrid and Elering became the shareholders of Nord Pool Spot AS ► Baltic TSOs have bought 2 % of shares each ► There will be one rotating Board member from the Baltics ► It means participation in the decision-making process, contribution to Nord Pool Spot corporate activities in development of the regional and European power market.

Comparing prices in 2011 and 2012 ► Price after NPS area opening slightly differs from the same period last year ► However, price from January 1st is lower in year 2012 ► The prices are fluctuating due to the seasonal impact in Nordic countries ► Price in LT differs only slightly through the whole year

Estonian-Latvian cross-border as a limiting factor ► EE-LV cross-border capacity is the limiting factor in Baltic region ► EE-LV cross-border capacity is severely limited during the summer time ► Typical Baltic market situation: ► Lowest price in EE ► Higher price in ELE because of limiting EE-ELE capacity ► The highest price in LT as it receives only a part of electricity from EE

LT biding area from 18 th June ► Prices in ELE and LT should be the same because of “unlimited” transmission capacities ► However, prices differ almost all the time, some days – dramatically ► As there is no direct linkage between ELE and LT areas market players’ trading strategy decides the price, but not the markets itself

The specific situation of the isolated Lithuanian market ► Some days despite the higher price in LT, the commercial flow goes in LT-LV direction ► It could be explained as pre-agreed amounts ► However, such situation shows the need of further Baltic electricity market integration steps

20 th August – average price in LT 123 EUR/MWh Hourly price fluctuated from 149,91 to 200,59 EUR/MWh ► Limited electricity supply from Estonian bidding area: Severely limited EE-LV capacities (270 MW) because of line outage in Russia ► Less delivery from RU (deficit in Lithuanian market ~100 MW/h) Due to limited interconnection capacities The demand grows – market participants are trying to buy electricity in the power exchange ► Limited local generation Limited availability of Kruonis HPSP Lithuanian PP blocks not working ► Increased demand in Latvia Riga TE2 planned outage – 175 MW

20 th August – lessons to learn ► August 20 not a disaster, but in a short run it indicate the need for: ► Better coordination among Baltic TSOs ► Better information for market participants via UMMs ► Enhanced responsibility of biggest market players ► In the long-term shows a need for: ► Further market integration ► Competitive local generation

Further integration steps Short-term steps: ► Coupling of Lithuanian and Estonian bidding areas ► NPS Latvia establishment Long-term steps: ► Creation of intraday-market ► Creation of financial market ► Infrastructure development Baltic States – part of integrated European electricity market

1 Current capacity allocation principles, except changed EE/LV boarder setup Capacity allocation in Lithuania performed by NPS 23 Internal Baltic capacities allocated by implicit auction Agreement between Baltic TSO`s is required Internal Baltic capacities allocated by implicit auction Common capacity allocation rules for trade from 3 rd countries Agreement between Baltic TSO is required Baltic markets integration – 3 steps development Initial scheme

The importance of Latvia joining NPS ► The direction of the commercial flows would be logical and determined by the forming price in bidding areas ► The price would reflect the real situation and as would be formed by power exchanges but not by the traders and their trading policy ► The power market would become more liquid because of supply from Latvian bidding area ► Latvia joining NPS is extremely important step for creating the efficient, liquid and integrated Baltic electricity market

Further market development steps – intra-day market ► Intra-day opening is a further step after creating the common Baltic market ► Intra-day allows more efficient market and more real time trading ► Allows minimizing imbalance risk ► Lithuanian market participants see the need of intra-day market opening as soon as possible ► Intra-day opening is very important and requested – date has to be agreed

Thank you!