Surveying I. Lecture 3..

Slides:



Advertisements
Similar presentations
Corrections and Adjustments TCA 1800
Advertisements

Theodolite: Introduction
Manufacturer’s Recommendation for Setting up a Theodolite 1)Ensure that :- the tripod head is approximately level the tripod feet are firmly fixed in the.
Purpose of this Minilab
Surveying I. Lecture 4..
POWERPOINT PRESENTATION ON POLARISED MICROSCOPE
Surveying I. Lecture 2..
Sz. Rózsa: Surveying I. – Lecture 2
CHAPTER 7 ANGLE MEASUREMENT
Reading Angles with Instruments ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures.
Types of angles A Z MLN – Horizontal angle ALM – Vertical angle
Basic Leveling Tools -V2 M. S. Martin Sept. 2005, Revised June 2009 M. S. Martin Sept. 2005, Revised June 2009.
Horizontal Angle Measurement Theodolites or Transits can Measure: horizontal angles vertical angles distances (stadia) elevations.
CE 260 SURVEYING CHAPTER 5.
S.H.H.S Building Construction
Topographic instruments
Example: A particular nearsighted person is unable to see objects clearly when they are beyond 2.5 m away (the far point of this particular eye). What.
Re - run of fine levelling procedure Position a Bubble follows LEFT THUMB.
CIVL 102 Leveling Lab Briefing on Field Work. Instrument error  suppose Instrument error  suppose line of sight not truly horizontal as telescope is.
Manufacturer’s Recommendation for Setting up a Theodolite
Position b 90 0 to position a Bubble still follows LEFT THUMB.
Angular measurement 1. Line of sight – the join of the points S and P Horizontal direction – the intersection between the vertical plane  i where is.
Surveying instruments
Sz. Rózsa: Surveying I. – Lecture 1
SURVEYING Preamble Surveying is involved in a project from conceptual stage to construction and afterwards in maintenance also. Depending on the stage.
Technology and Engineering
Visual Angle How large an object appears, and how much detail we can see on it, depends on the size of the image it makes on the retina. This, in turns,
LINEAR MEASUREMENT.
TOTAL STATION SET UP PROCEDURE
Patel Tejasvini D.(T-13CL225)
Chapter (5) Leveling Introduction:
Levelling Applications:
THEODOLITE SURVEYING THEODOLITE SURVEYING
Alternate River/Valley Crossing Procedure for Theodolites Kendall Fancher Chief, NGS Instrumentation & Methodologies Branch
Doing Backsights and Foresights ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures.
This presentation, together with the next few presentations, outline the procedures for measuring and calculating vertical distances. Accurately It is.
Topic : Theodolite Traversing
SURVEYING PLANE TABLE SURVEYING 1. 2  Plane Tabling is a graphical method of surveying in which the field work and plotting are done simultaneously.
THEODOLITE SURVEYING THEODOLITE SURVEYING. THEODOLITE SURVEYING THEODOLITE SURVEYING.
PLANE TABLE SURVEYING SURVEYING – I
INSTRUMENTS USED IN PLANE TABLE SURVEYING.
Civil Department. GROUP MEMBERS GROUP MEMBERS:- ENROLLMENT NO. NAME OF THE STUDENT BURHAN ADENWALA PRIYANK AGRAWAL TAMANNA.
How to: Some Basic Principles for Leveling
Made by- Civil 3rd semester
Surveying Instrument Basics ©2004 Dr. B. C. Paul.
GOVERNMENT ENGG. COLLEGE B.E Semester III :- Civil Engineering
Marine Sextant and Bearing instruments
ENGINEERING COLLEGE, TUWA SUBMITED BY: ISMAIL A. JANAB TAHER Y. POONAWALA AMMAR S. DUDHIYA TAHER F. CHHARCHHODA.
BIRLA VISHWAKARMA MAHAVIDYALAYA
Traversing: Theodolite Traverse
Theodolite Traversing Mr. Vedprakash Maralapalle, Asst. Professor
ENGINEERING COLLEGE TUWA
FACULTY OF ENGINEERING TECHNOLOGY AND RESERCH, TAJPORE, BARDOLI CIVIL ENGINEERING DEPARTMENT SURVEYING ( )
Surveying I. Lecture 3..
Chapter (5) Leveling Introduction:
TYPES OF LEVELS BY SUMIT M. MESHRAM.
Visit for more Learning Resources
Theodolite: Introduction
Theodolite: Introduction
S. N. PATEL INSTITUTE OF TECHNOLOGY & RESEARCH CENTRE , UMRAKH
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
THEODOLITE TRAVERSING BY S N Nanaware
Marine Sextant and Bearing instruments
SURVEYING – II THEODOLITE
Unit 5. Levelling.
Leveling By : Parveen Kumar.
THEODOLITE.
Theodolite - Instrument Checks
Purpose of this Minilab
LEVELING.
Presentation transcript:

Surveying I. Lecture 3.

Announcement Presentation can be downloaded from: http://www.geod.bme.hu/index_e.html

Announcement

Outline The theodolite and its structure Telescope Reading device Bubble tubes Vertical circle

Measuring angles What is Surveying? The art of making measurements of the relative positions of natural and man-made features on the Earth’s surface, and the presentation of this information either graphically or numerically. Relative positions (2D case): One needs to find two points and measure the distance between them. Hence we can create a coordinate system. Control points Base line

Measuring angles Let’s determine the position of a third, unknown point (C). We have two unknowns: We need two measurements: two distances one distance and an angle two angles

Measuring angles

Measuring angles What kind of instrument do we need? It should contain two fixed graduated circles an upper part, which can be revolved around a vertical axis and eqiped with an index a telescope, which can be rotated around a horizontal axis bubble tubes to set up the instrument

The vernier theodolite

The theodolite The vernier 60 subdivision between the index and the 20-minute graduation of the vernier equals the distance of 59 unit of the main scale.

Modern theodolites no verniers - glass circles, units are graduated by photographic methods, readings are taken using optical systems optical plummet (in tribrach or in alidade) advanced models - digital reading

Telescope Imaging of the objective Geodetic telescopes can be used between 2f and infinity. Internal focusing (see Lecture 2)

Methods of circle reading Graduated microscope and the coincidence method Graduated microscope

Methods of circle reading Coincidence method Two indices in diametral position Both of them and both portion of the horizontal circle are imaged in the reading eyepiece.

Methods of circle reading

Levelling the instrument The horizontal circle must be truly horizontal during the measurements. How to achieve this? Remember the structure of the levelling instrument: Bubble tube Diaphragm Tilting screw Circular bubble Tilting axis Levelling head In this case the bubble tube must be adjusted.

The bubble tube Finding the normal point of the bubble tube Let’s suppose that the bubble tube is not adjusted, but we do want to use it to level the alidade. If the bubble is centered, the alidade is tilted. Normal point: the setting of the bubble, when the alidade is horizontal.

The bubble tube Step 1. Step 2. Center the bubble, then rotate the alidade around the standing axis with 180 degree. Step 2. Check the reading of the left end of the bubble. Standing axis L R R L Plate bubble Alidade L R R L

The bubble tube The normal point is exactly the average of the two values. In our case: 3 units. If we set the bubble to this unit, the alhidade is horizontal. R L R L

Leveling the instrument Finding the normal point of the bubble tube Leveling the alidade

The vertical circle Is necessary for measuring the angle between the vertical and the line of collimation (z) The index of the vertical circle must always be horizontal!

The vertical circle The vernier theodolite The index must be levelled before each reading on the vertical circle.

The vertical circle Modern theodolites: In modern theodolites an optical system compensates the tilting of the standing axis. The optical system consists of prisms and a pendulum. Askania compensator Standing axis is vertical Standing axis is tilted

The vertical circle Liquid compensator Supposing that the standing axis is tilted, and the line of collimation is horizontal.

Setting up a theodolite The theodolite must be centered and levelled.

Setting up a theodolite Setting up the tripod (the head of the tripod should be approximately horizontal) above the control point Fix the instrument on the tripod. Sight the control point in the optical plummet using the footscrews of the instrument. Level the instrument by adjusting the length of the legs of the tripod using the circular bubble. Find the normal point of the bubble tube.

Setting up a theodolite Level the instrument accurately using the bubble tube and the three levelling screws. Finally loosen the instrument on the tripod, and slide it above the control point on the head of the tripod. Fix the instrument on the tripod.

Thank You for Your Attention!