PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.

Slides:



Advertisements
Similar presentations
4/11/20131 PHENIX WEEKLY PLANNING 4/11/2013 Don Lynch.
Advertisements

2/6/ PHENIX WEEKLY PLANNING Feb. 6, 2014 Don Lynch.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Time Meeting 1/20/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
12/12/ PHENIX WEEKLY PLANNING Dec. 12, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
1/12/20121 PHENIX WEEKLY PLANNING 1/12/2012 Don Lynch.
PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
9/26/ PHENIX WEEKLY PLANNING Sep. 26, 2013 Don Lynch.
1/30/ PHENIX WEEKLY PLANNING Jan. 30, 2014 Don Lynch.
PHENIX Status, 2/22/11 VTX commissioning on beam Local polarimeter in service 9.6% in blue, -16.6% Residual transverse component for longitudinal beam.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1. LANL-led silicon detector project (FVTX) installed into RHIC this FY, 4.5 cm from beam pipe Increased leakage current in detectors implies somewhat.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
10/10/ PHENIX WEEKLY PLANNING Oct. 10, 2013 Don Lynch.
6/6/ PHENIX WEEKLY PLANNING 6/6/2013 Don Lynch Note: No PHENIX planning meeting this week due to end of run party. Feel free to discuss safety and.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
5/9/ PHENIX WEEKLY PLANNING 5/9/2013 Don Lynch.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
PHENIX Run-13 status Hubert van Hecke 1Hubert van Hecke - 05 Feb 13 Time meeting.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
PHENIX STATUS Stefan Bathe, Time Meeting, June 1, 2010.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
RHIC status Chuyu Liu Time meeting Apr. 28, 2015.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
5/16/ PHENIX WEEKLY PLANNING 5/16/2013 Don Lynch.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
5/30/20131 PHENIX WEEKLY PLANNING 5/30/2013 Don Lynch.
3/7/20131 PHENIX WEEKLY PLANNING 3/7/2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
12/08/20111 PHENIX WEEKLY PLANNING 12/08/2011 Don Lynch.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run16 Y. Akiba.
VTX readiness for RUN15 Y. Akiba.
Y. Akiba (RIKEN/RBRC) Radiation Lab meeting 2016/06/30
Presentation transcript:

PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting

Starting up PHENIX Detector installation is complete Pink/Blue/White Sheets complete Final magnet tests performed Final gas leak checks performed Final walk-through and final signatures obtained Two-person watch-shifts since Jan. 09 Will be switching over to full shifts next week 2Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting

Detector Installation Refurbished VTX together with FVTX installed in IR, surveyed and being commissioned 3Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting Beginning of December 2013 Today

Detector Installation Muon Piston Calorimeter Extension partially installed 4Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting

Preparations Shield wall closed 5Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting

Commissioning Preparation and commissioning of – DAQ – Sub-detectors ongoing Flowing gas through gas-detectors started; pretty stable conditions, detectors being operated VTX/FVTX cooled, closed and insulated, being commissioned 6Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting

Upcoming Plans Operation of sub-detectors Commissioning to run conditions Operation of DAQ Cosmic ray runs with operating magnets 7Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting

Calendar Cool down to 4 K: starting from Feb. 03 Cool down to 4 K established by Feb. 08 Setup for Au-Au collisions at sqrt(s) = 14.6 GeV finished by Feb. 15 Expect to loose access of IR on Feb. 06 First collisions in PHENIX expected by Feb. 16 8Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting