Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity.

Slides:



Advertisements
Similar presentations
Vacuum Filtration.
Advertisements

Sampling and Measurement for Volatile Organic Compounds
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Thread Cutting Part 2: Cutting an external thread.
1 Problem Resolution Model 1130 & Model 1135 Frank Schaedlich 330 Nantucket Blvd. Toronto, Canada M1P 2P4 Rev 1.12 Aug 2004.
Sand Sampler User’s Manual Introduction Things to Know Before Starting your Sampler Starting and Operating Troubleshooting Maintenance.
Click on this image to open the full PDF document.
How to carry out experiments using MPMS March 2012 Takeshi NAKAGAWA.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
( 1 ) PROCEDURE FOR FLAT HEAT PRESS OPERATION PROCEDURE FOR MULTI FUNCTION HEAT PRESS MACHINE.
8/30/ Ford Police Interceptor Utility Ford Police Interceptor Utility does not come with fog lights Front facia is made from solid plastic.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
L2000 Technical Training 6. Assemble/Disassemble.
When you finish your quiz:
Model DISASSEMBLY AND ASSEMBLY 1- Disassembly To replace the spring (11), or clean any of the internal components of the valve, proceed in the.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Model 995 EP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Model 895 AP DISSASSEMBLY AND ASSEMBLY 1.Disassembly To replace the spring or clean any internal components of the valve, proceed in the following manner:
Sampling in the Marine Environment. Ready to depart for an exciting day on the high seas. Coastal waters research vessel. Note boom and winch used to.
Phase Difference = Phase Difference = 0.05.
LAUNCHER BASE PARTS B A D E F C G. LAUNCHER BASE PARTS B A D E F C G.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Separations. Laboratory Separations & Extractions Types of Filtration Gravity Filtration Suction Filtration Sinter Funnels Methods of Separation Centrifuges.
DETERMINATION OF TOTAL PARTICULATES USING A HIGH VOLUME AIR SAMPLER.
Wedges A wedge is a item that you cut with. A wedge are two inclined planes.
WBEA Passive Sampler Validation Study for NH3 and HNO3 Operation of the dual-channel Annular Denuder System (ADS)
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Vacuum system.
Do Now 1)What is the formula for density? 2)What is the volume of the block? 3)An object has a mass of 30g and a volume of 10 cm 3. What is the density?
Perry Lapper Progress. Frame With Actuators Outside Frame.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Warm Up. Volume of Solids - 8.3A Big Idea Just like we estimate area by drawing rectangles, we can estimate volume by cutting the shape into slices,
The Tesla Turbine A DIY Guide. Description Modern turbines rely on principles of aerodynamics, where the air flow pushes the blades attached to an axle.
Dual Growing Rods for the Treatment of Early-Onset Scoliosis by Gregory M. Mundis, Nima Kabirian, and Behrooz A. Akbarnia JBJS Essent Surg Tech Volume.
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Plan for Today (AP Physics 2) B testers Go over AP Problems Thermo Review C Testers Go over yesterday’s problems Parallel Axis Theorem.
(An attempt to build a) Top Bar Bee Hive Patrick Sturgill And Mary Haynes.
2025 Partisol Sequential Sampler Deborah Bowe Thermo Electron Corporation.
Water in the Atmosphere Chapter 18, Section 1. Water in the Atmosphere  Precipitation – any form of water that falls from a cloud  When it comes to.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Tutorial: Design Tables Chapter 4. Why Use Design Tables Many components, especially small components such as screws, nuts, O-rings, etc. are identical.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Calibration of a Thermistor Voltage Divider Portland State University Department of Mechanical Engineering ME 121: Engineering Problem Solving.
1 Hydrological Regime of the Mekong River Hydrological Regime of the Mekong basin depends on climatic conditions of the wet and dry seasons. High water.
Date of download: 9/17/2016 Copyright © ASME. All rights reserved. From: A Stepped-Bar Apparatus for Thermal Resistance Measurements J. Electron. Packag.
August 24, 2016 Warm-Up: Phase Change worksheet Take out work from yesterday Homework: Finish unfinished classwork! USA Test Prep due Friday. Check out.
X-Spot Lamp Socket Replacement Procedure
826YD 21/2”-10”.
Easycliner (Motorized Version) Assembly Instruction
Replacement of outside mirror
Active and Passive Transport
Required tools for installation of a V-1020C Speaker with V-9914M-5 Metal Bridge.
LESSON 03. LESSON 03 LESSON 03 STARTER Paired review of your modelling achievements so far With your partner/neighbour, begin by presenting to them.
The Big 6 Research Model Step 3: Location and Access
The Victorian Gazebo II Assembly Instruction
Required tools for installation of a V-1020C speaker with V-9914 bridge.
880V 21/2”-10”.
QUADCOPTER PRODUCTION PLAN
C.2.10 Sample Questions.
C.2.8 Sample Questions.
Step 1:Disassemble battery case
C.2.8 Sample Questions.
Changes of State.
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
QUADCOPTER PRODUCTION PLAN
Presentation transcript:

Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity

Small bowl Big bowl Small bowl Big bowl Lower side Upper side Lower side Upper side long short long short

Long side screw to Small bowl Long side screw to Small bowl Small bowl Lower side Small bowl Lower side nut as stopper

Long side screw Small bowl Long side screw Small bowl Long side screw Small bowl Long side screw Small bowl Start to fix outside by a nut

Fixed outside by a nutRing mounting Finish lower side (small bowl)

Upside down PUF setting PUF center cutting to pass through rod

Lower side Small bowl Upper side Big bowl Upper side Big bowl Upper side Big bowl

Passive sampler Dry deposition sampler Passive sampler

Active sampler Low volume mini pump Passive sampler

Active sampler Low volume mini pump Flow meter Thermometer / Humidity Thermo / Humidity recorder Solid phase adsorbent (PS-Air cartridge) Active sampler Low volume mini pump

Solid phase adsorbent (PS-Air cartridge) Thermo / Humidity recorder Active sampler Low volume mini pump

PUF shipping 1 month later after passive sampler setting

PUF shipping