Standard Costing and Variance Analysis

Slides:



Advertisements
Similar presentations
Standard costs and Variance analysis Unit 10 University of Sunderland Dr Vidya Kumar 1.
Advertisements

1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 17 Budgetary Control.
Management: Analysis and Decision Making
Principles of Managerial Accounting Chapter 10. Standard Costs Set to encourage efficient operations – management by exception. Quantity Standards A benchmark.
Standard Costing and Variances
1 Budgeting Dr. Varadraj Bapat Module 14.. Management Accounting Dr. Varadraj Bapat, IIT Mumbai 2 Index  Introduction  Objectives  Advantages  Components.
Standard Costing and Variance Analysis
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Overall Framework Decision Making (Unit 2) -CVP -Special Orders -Make or Buy -Capital Investments Cost Accumulation Systems (Unit 1) Corporate Strategy.
The Islamic University –Gaza
Standard costing.
© Pearson Education Limited 2008 MANAGEMENT ACCOUNTING Cheryl S. McWatters, Jerold L. Zimmerman, Dale C. Morse Cheryl S. McWatters, Jerold L. Zimmerman,
(C) Ghanendra Fago (M. Phil, MBA) 1 Standard Costing, Variance Analysis and Management Cycle Use standard costs to prepare budgets and establish goals.
Using Budgets AS Business Studies. Aims & Objectives Aim: Understand variance analysis Objectives: Define variance analysis Explain the causes of variance.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
Chapter 10 Standard Costing: A Managerial Control Tool
VARIANCE ANALYSIS 1 LECTURE 8.
Financial performance measures and transfer pricing
© Pearson Education Limited 2003 Atrill, McLaney: Accounting and Finance for Non-Specialists, 4th edition OHT 9.1 Budgeting OBJECTIVES You should be able.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Use with Management and Cost Accounting 8e by Colin Drury ISBN © 2012 Colin Drury Part Four: Information for planning, control and performance.
Chapter 10 The Use of Budgets for Cost Control and Performance Evaluation.
1 Profit and Cost Center Performance Evaluation CHAPTER 10 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in.
Standard Costs Budget for a single unit
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
CHAPTER © jsnyderdesign / iStockphoto 6 PERFORMANCE EVALUATION VARIANCE ANALYSIS.
1 Module 22 Standard Costs and Variance Analysis.
Unit 3 Accounts & Finance Budgeting. Learning Objectives Understand the importance of budgeting for organisations Calculate and interpret variances Analyse.
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
Standard Costing and Variance Analysis
Variance Analysis. Variance analysis Variance analysis is the evaluation of performance by means of variances, whose timely reporting increase the opportunity.
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead 11-1 Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides.
IB Business and Management 3.4 Budgeting. Learning Outcomes To be able to explain the importance of budgeting for organisations Calculate and interpret.
THE BUDGET PLAN FOR 4 TH QUARTER Sell in 4 th quarter: 70,000 pants 25,000 jerseys 9,000 award jackets Control inventory Manage cash.
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e By Kim Langfield-Smith 11-1.
ACC3200 STANDARD COSTING.
Management and Cost Accounting, 6 th edition, ISBN © 2004 Colin Drury MANAGEMENT AND COST ACCOUNTING SIXTH EDITION COLIN DRURY.
1 Adapted by Cynthia Fortin, CPA, CMA Introduction to Managerial Accounting, Brewer, Garrison,Noreen.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
STANDARD COSTING Setting Standard and Analyzing Variances Pertemuan 3, 4 dan 5 Matakuliah: > Tahun: >
Comparison of Budget and Actual Achievement BUDGETS Key Definitions: Budgetary control: Involves comparing budgeted figures with actual figures and acting.
1 Copyright © 2008 Cengage Learning South-Western. Heitger/Mowen/Hansen Standard Costing: A Managerial Control Tool Chapter Eight Fundamental Cornerstones.
Cornerstones of Managerial Accounting 2e Chapter Nine
Standard costing.
Performance Evaluation
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 15
Good or bad? Actual income was £500 less than budgeted for the period.
Principles of Accounting 2002e
PowerPoint presentation
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Variance Analysis–A Tool for Cost Control and Performance Evaluation
Cost accounting Session 7.
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Budgeting and standard costing
Btec Business Studies Unit 2 Assignment 4
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Presentation transcript:

Standard Costing and Variance Analysis Chapter 11 Standard Costing and Variance Analysis

Standard costing Standard costing is a system where preset standards are used in the estimation of costs. This can provide more detailed variance analysis information for managers. It involves the setting of detailed predetermined standard product costs, so that a business can accurately estimate, based on the standards set, what the cost of a product or service should be. Comparing this standard to the actual cost of a product enhances cost control.

Standard cost ‘Benchmark measurement of resource usage or revenue or profit generation, set in defined conditions’. Standard cost as defined by CIMA Official Terminology A standard cost is a predetermined calculation of what a cost should be under specified working conditions. Setting a standard involves the establishment of two components for each cost type, the volume required and the unit cost attached to that volume.

Variance analysis ‘Evaluation of performance by a means of variances, whose timely reporting should maximise the opportunity for managerial action’ Variance analysis as defined by CIMA Official Terminology

Budgetary control worksheet

Budgetary control reconciliation

Direct materials variance The materials variance of €3,000 adverse could be further analysed into its two component parts: Materials price variance: This variance reflects the difference between the actual purchase price of materials (food) and the standard purchase price set. Materials usage variance: This variance reflects the difference between the actual quantity of materials used and the quantity allowed, for the various products produced.

Direct labour variance The direct labour variance of €3,000 favourable could be further analysed into its two component parts: Labour rate variance: This is caused by differences between the actual labour rate and the standard rate set in the budget. Labour efficiency variance: This is due to the differences between the actual time spent in producing the products and the standard time allowed or set in the budget.

Overhead variances The variable overhead variance of €2,000 adverse could be further analysed into its two component parts: Rate: Caused by the difference between the actual variable overhead rate and the budgeted rate. Efficiency: Caused by the difference between the actual variable overhead usage and the standard usage allowed in the budget. The fixed overhead variance of €3,000 adverse - Standards are not normally set for fixed overhead because they are a product of time and not of efficiency or production.

Summary of variances

Key variances in standard costing Direct material variances

Key variances in standard costing Direct labour variances

Key variances in standard costing Variable overhead variances

Example 11.1: Standard costing

a) Calculate the standard variable cost of a single souvenir unit

b) Prepare a worksheet showing the fixed budget, flexible budget, actual results and variance for the period

c) Further analyse the materials, labour and overhead variances into the following sub-variances

c) Further analyse the materials, labour and overhead variances into the following sub-variances

c) Further analyse the materials, labour and overhead variances into the following sub-variances

c) Further analyse the materials, labour and overhead variances into the following sub-variances

c) Further analyse the materials, labour and overhead variances into the following sub-variances

c) Further analyse the materials, labour and overhead variances into the following sub-variances

c) Further analyse the materials, labour and overhead variances into the following sub-variances

d) Prepare a statement reconciling the budgeted net profit with actual net profit

Interpretation of Variances Materials Price €1543 F Possible reasons Availing of quantity discounts General reduction in price of raw materials Materials usage €40 A Possible reasons Purchase of poor quality materials Quality/age of equipment used leading to greater waste Poor labour efficiency leading to greater waste Accuracy of standard Theft

Interpretation of Variances Labour rate €630 A Possible reasons Unexpected wage deal that applied retrospectively. Out of date standard. Increase in overtime. Increase in labour taxes. Labour efficiency €500 A Possible reasons Skill and training of staff. Motivational factors such as working conditions, pay, career prospects. Quality of materials. Quality and age of equipment. Accuracy of standard.

Interpretation of Variances Variable O/H rate €293F Possible reasons Standard not reviewed regularly Fall in the rate Variable O/H Efficiency €100 A Possible reasons This variance is related to the labour efficiency variance and is influenced by the same factors that influence the labour efficiency variance.

Summary of reasons for variances Materials Price Changes in market price between the agreeing of standards and actual performance. Poor performance by the purchasing department staff in not achieving better value purchasing. Unrealistic standards not regularly reviewed. Materials Usage Poor quality materials purchased, leading to high levels of waste. Faulty equipment leading to higher levels of waste. Poor levels of labour efficiency. Unrealistic standards not reviewed. Labour Rate Standard not reflecting changing rates of pay. Unanticipated increases in overtime levels. Unanticipated increases in labour taxes (employers PRSI). Labour Efficiency Poor staff motivation. High staff turnover and hence an increase in staff training. Poor quality materials. Faulty equipment. Delays in material supplies resulting in wasted labour time.

Interrelationship of variances The purchase of cheap and inferior materials will lead to a favourable materials price variance but can cause an adverse materials usage variance, due to increased waste associated with the inferior materials. It can also lead to an adverse labour efficiency variance as employees may require added time as a result of the inferior materials. Cheaper labour costs will lead to a favourable labour rate variance but can cause an adverse labour efficiency variance due to the requirement for training and the effects of the learning curve. This can also cause an adverse materials usage variance. Adverse labour efficiency variances can also create adverse variable overhead efficiency variances Not reinvesting in equipment can create favourable capital spending variances, however this can lead to adverse variances in materials usage, labour efficiency and variable overhead.

The standard setting process Crucial to a system of standard costing is the setting of standard costs that can be used as a benchmark against which actual performance can be measured. Before a system of standard costing can be implemented, a range of information must be collected from various departments to be analysed. Examples would include: Purchasing costs of direct materials from the purchasing department. Wage rates and productivity agreements from the personnel department. Details of overhead costs from the accounting / production department.

The standard setting process Direct materials standard costs Standard price – based on prices agreed and negotiated with supplier (average price the firm expects to pay during the life of the standard) Standard usage - based on product specifications allowing for unavoidable losses. Direct labour standard costs Standard rate – the wage rate as agreed in any trade union agreement. Standard efficiency – the average time a direct labour employee takes to perform tasks related to a unit of production. Variable production overhead standard costs Variable overhead rate standard – based on historic information about variable overhead costs. Variable overhead efficiency standard – is generally either direct labour hours or direct machine hours.

The standard setting process Standards should be attainable and should not assume perfect or ideal conditions. Built into any standard should be certain allowances for what is termed 'normal loss'. Standards, although realistic and with allowances built in, should also have a motivating affect on employees. Employees must be involved in the standard setting process where it affects them, especially in terms of the efficiency standards. In setting standards, management must accept and anticipate some degree of variability between actual performance and the standard set. Standards should to be revised to ensure they are still realistic.

Advantages of standard costing More accurate pricing of products based on detailed cost analysis. Carefully planned standards are an aid to more accurate budgeting. The business will have a more simplified stock control system, as all materials purchased are valued at standard cost rather than LIFO or FIFO value systems. More detailed variance analysis leading to a deeper level of investigation and better management decision-making. A target of efficiency is set for employees and cost consciousness is stimulated. The setting of standards involves determining the best materials and practices, which may lead to economies. An overall improvement in the financial control of the business.