Cisco – Semester 1 – Chapter 9 Preview Review. Behavioral Objectives Document all work –Do it as work proceeds –Same as chapter 8 guidelines –Don’t forget.

Slides:



Advertisements
Similar presentations
NETWORK COMPONENTS WEEK 9 SESSION 1 READING 1. A network consists of many components. We need to understand the purpose of these components.
Advertisements

Cabling system components
Agricultural Mechanics Fundamentals & Applications Chapter 33Installing Branch Circuits.
Network Design Issues Design and Documentation Prepared by: Aline L. Mendoza.
Cabling UTP AND FIBER CABLING. Structured Cabling Infrastructure Mounted and permanent Allows patching Comfort that infrastructure is OK Components: Information.
HOW TO MAKE UTP CAT-5/5e CABLE
Antonio González Torres
Institute of Technology Sligo - Dept of Computing Structured Cabling Project Chapter 9 Paul Flynn Paul Flynn.
+ Straight-Through Cable Construction Lab 4. + Data Transmission In data transmission system, the transmission medium is the physical path between transmitter.
Chapter 4 – Cisco Semester I
SEM 1V2 Chapter 9 Structured Cabling
Physical Transmission Media 8 5/9/ Modified by: Brierley.
Page 1 - © Richard L. Goldman Networking Topology ©Richard L. Goldman January 8, 2002.
Hands On: Cutting and Connectorizing UTP Chapter 3a Panko’s Business Data Networks and Telecommunications, 6 th edition Copyright 2007 Prentice-Hall May.
Cisco Academy – Chapter 5 Physical Layer. Physical Layer - 1 defines the electrical, mechanical, procedural, and functional specifications for activating,
(part 4).  Gateways  A gateway is responsible for translating information from one format to another and can run at any layer of the OSI model, depending.
CSC 450/550 Part 3: The Medium Access Control Sublayer More Contents on the Engineering Side of Ethernet.
Cisco – Semester III Documentation. What is it most important component of a good network?  Documentation.
111 © 2002, Cisco Systems, Inc. All rights reserved. Trim out phase steps Cutting cables to length Labeling cables Dressing cables Terminating cables Installing.
Institute of Technology Sligo - Dept of Computing Many Roads To Home Paul Flynn.
Institute of Technology, Sligo Dept of Computing LAN Design Semester 3, Chapter 4.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Connecting to the Internet Through an ISP Networking for Home and Small.
The making of Ethernet Standards For the Ethernet Cabling & PoE (power-over-Ethernet).
Many Roads To Home. LAN Roads UTP STP Coaxial Fiber Optics.
Installing the Network Chapter 11 Release 16/7/2009.
Structured Cabling Project
And how they are used. Hubs send data to all of the devices that are plugged into them. They have no ability to send packets to the correct ports. Cost~$35.
Chap 9 Structure Cabling Project Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
The Saigon CTT Semester 1 CHAPTER 9 Le Chi Trung.
Connecting LANs, (network devices) Backbone Networks, and Virtual LANs Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction.
1 Project # 2 Steve Klesper Tom Ondick Garry Meadows Aaron Hurt Tim Wade.
NETWORK CABLING Chapter 2
Local Area Networks Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
Structured Cabling Project Chapter 9
The Saigon CTT Semester 1 CHAPTER 5 Le Chi Trung.
Crossover Cable Construction
SYSTEM ADMINISTRATION Chapter 4 Network Media, Connectors, and Their Characteristics.
Copper Media Describe the specifications and performances of different types of cable. Describe coaxial cable and its advantages and disadvantages over.
Chapter 9 Review Structured Cabling Project. Chapter 9 Focus The focus of this chapter is standards for networking media. You read that when RJ-45 jacks.
Copyright CCNA 1 Chapter 4, Part 2 Cabling LANs and WANs By Your Name.
Module 3: Networking Media Safe Handling and User of a Multimeter Voltage Measurement Resistance Measurement Series Circuits 3.1.9a.
Cabling Project. Your first responsibility, as the network designer, will be to have your client specify, in writing, the desired outcome of the project.
Telecom Cabling Trouble shooting.
Robert E. Meyers CCNA, CCAI Youngstown State University Cisco Regional Academy Instructor Cisco Networking Academy Program Semester 3, v Chapter.
BIX In-Building Cross Connect system BIX Installation Guide ELCM 254 Updated December 2013 gmail.com 1 Most of the images and some text for.
Project On Ethernet Cable Building & Video Recording James Maclean & Stephen Craig.
1 Discovery 2, Ch 4 Notes. 222 Cabling Standards Standards ensure that networks perform to expectations US—IEEE & ANSI/TIA/EIA Canada—CSA (Canadian Standards.
Design and Documentation Chapter 8. Network Design Issues Your first step in the process is to gather information about the organization. This information.
Network Anatomy By: Roland J. Boutte. Ethernet Cable cable used to connect computing devices together directly. two hosts or two switches to each other.
LAN Design Semester 3, Chapter 3. Home End Table of Contents Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There! Go There!
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 34 Installing Branch Circuits.
COPPER AND FIBER REVIEW
Chapter 5a. 5a-2 Single Twisted Pair Jacket Four pairs (each pair is twisted) are enclosed in a jacket. Copyright 2011 Pearson Education, Inc. Publishing.
TOPIC 1.2 INTRODUCTION TO NETWORKING. OBJECTIVES By the end of the topic, students should be able to: a) List the elements of data communication systems.
NETWORKING MEDIA b Shielded twisted-pair - 2 pair, 150 ohm b unshielded-twisted pair - 4 pair, 100 ohm b fiber optic cable - 2 fibers b coaxial cable -
© ExplorNet’s Centers for Quality Teaching and Learning 1 Resolve common problems with wired and wireless networks. Objective – 2%
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
Fatima Alibrahim Intro. to Telecommunication MISY3312
How to wire Ethernet Cables
Media, Connections, and Collisions
Connecting to the Internet Through an ISP
Hands On: Cutting and Connectorizing UTP
BIX In-Building Cross Connect system
Connecting to the Internet Through an ISP
Ethernet LAN 1 1.
Hands On: Cutting and Connectorizing UTP
Hands On: Cutting and Connectorizing UTP
Connecting to the Internet Through an ISP
Presentation transcript:

Cisco – Semester 1 – Chapter 9 Preview Review

Behavioral Objectives Document all work –Do it as work proceeds –Same as chapter 8 guidelines –Don’t forget journals Develop Planning Mentality –Create flow chart to guide work –Get permissions and materials before work begins Respect Do’s and Don’ts for installing network media

Learning Objectives Use correct installation procedures for network media –Maximizes network performance Follow established safety procedures when installing network media –Protect yourself and others If you learn nothing else, learn this –Turn power off before you begin

Networking Media Foundation of OSI Model Most Important Component of OSI model RJ 45 Jack Recommended by TIA/EIA –Wiring Sequence is critical for optimum network performance

Documentation Use cut sheet –Rough diagram Location of Cable runs, rooms, etc. Record same data in journal Label hardware termination units –UL969 states labels must adhere, be legible, and should discourage defacement. Labels should be mnemonic

Flowchart Elements Install outlets, jacks, NICS, hubs, switches, routers (document as you proceed) Install Patch panels and test Run and test cables (document as cables are run and tested) Configure router(s) Install and configure PCs Document everything

Know About and Use as Reference OSHA Codes Building Codes (State and Local) Electrical Codes (TIA/EIA, UL) Network Media Standards (IEEE, ISO/IEC)

Wiring Closet Devices Patch Panel (Layer 1) Hubs - (can act as a switchboard interconnect); connects computers and other devices (Layer 1) Bridge – Layer 2 – filters traffic Switch – Layer 2 – filters and routes traffic Routers – Layer 3 – segments network – reduces broadcast domain

TIA/EIA Standards Must use RJ-45 jack to connect CAT 5 UTP May use flush or surface mount for jack –Surface mount may be screw mount or adhesive Concerns: –At least 5 cm (2 inches) from bottom of baseboard (otherwise wall plate may interfere) –Avoid door and window trim

Importance of Patch Panels Key component of structured cabling Allow cables to be terminated in organized yet strong and flexible manner Cabling standards call for installation in certain areas of cable run – MDF and IDF

Labeling Standards UL 969 –Must meet standards including: Legibility Defacement Adhesion

Cabling Procedures Label the Boxes and Cable before you start Dress the Cable Secure the Cable with Ties or Bars Install Wire Management Panels

Cabling Dos Use cable ties to hold cables together Strip back only sheathing that you need (maximum exposed is 1.3 centimeters or.5 inch Keep bend radii to less than 4 times diameter of cable Provide extra cable at ends (leave a service coil) Use cable support bars, management panels, velcro straps, and ladder racks) Label cable runs Use Punch Down tool correctly (cut blade away from you)

Cabling Don’ts Don’t untwist wires – twisting is important for cancellation effect Don’t stretch wire (causes untwisting) Don’t bend cable – never beyond right angle Don’t twist cable jacket (no kinks) Don’t use a staple gun

Rules for Cable Spools Leave in box Don’t unwind Don’t cut cable unless labeled – at least three times at intervals Do bind cable ends to pull as a unit

Testing Functional Test – plug in computer and see if you can make an outside connection to WWW Use a cable tester (preferred method)

Problems Connectors are weakest Link –Attach CAT5 at Patch Panel in ascending order; labels should correspond to rooms –Keep ends centered above pin locations –Keep jacket within 6.4 mm of pin locations –Don’t untwist wire pairs more than necessary –Use Krone or 110 punch – depends on patch panel Mount Patch Panel to wall, rack, or place in cabinet

Other Problems Split Pairs – wire from one circuit crossed with wire from another circuit(can’t be detected with wire map) find by visual inspection and cross talk measurement (is a result of wires not being part of same circuit – did not follow wire map) – result will be near end cross talk Cross Talk – crossed pairs(can be detected visually and wire map) and with cable meter EMF – unplug electrical devices (one at a time) and measure attenuation with cable tester

Outside Problem Sources Fluorescent lights Heaters Radios Air cleaners, TVs Computers Motors, Switches, Welders

Tools Signal Injector – put at end of cable to measure reduction in power of signal Cable Tester aka Time Domain Reflectometer– (high number is good; low number problem) measures: –Signal attenuation –Near End Cross Talk –Distance –Bad connections –Crossed pairs Can trace noise behind wall & measure noise