Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.

Slides:



Advertisements
Similar presentations
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
Advertisements

S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Superconducting Large Bore Sextupole for ILC
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
ASC 2012, 10/10/2012Test results and analysis of LQS03 – G. Ambrosio 1 BNL - FNAL - LBNL - SLAC Test Results and Analysis of LQS03 Third Long Nb 3 Sn Quadrupole.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Helene Felice HQ02 Assembly status 02/28/2012. HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
1 Collar Pack #2 Disassembly Incident Summary and Plan Helene Felice Heng Pan, Dan Cheng, Xiaorong Wang, Soren Prestemon, Maxim Martchevsky, Ahmet Pekedis,
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
Triplet status and plans P. Ferracin, G. Ambrosio, M. Anerella, A. Ballarino, B. Bordini, F. Borgnolutti, R. Bossert, D. Cheng, D.R. Dietderich, B. Favrat,
Lab Coordination Meeting 3/21/13LHC IR Quadrupole Plan – G. Sabbi 1 LARP Magnet Systems Plan GianLuca Sabbi Lab Coordination Meeting March 21, 2013.
HL-LHC Annual Meeting, November 2013HQ Planning – G. Sabbi 1 HQ Status and Plans G. Sabbi High Luminosity LHC Annual Meeting Daresbury, UK, November 11-14,
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
H. Felice, D. Cheng, H, Pan, M. Reynolds, A. Pekedis, T. Lipton MQXFS1 update 07/27/2015.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
New options for the new D1 magnet Qingjin Xu
LARP CM17, 11/16/2011Magnet Systems Overview – G. Sabbi 1 Magnet Systems Overview GianLuca Sabbi LARP Collaboration Meeting 17 November 16, 2011 BNL -
Helene Felice HQ Test Results Review Thursday December 16 th Overview of HQ coils and Magnet.
MQXF Workshop on Structure, Alignment, and Electrical QA Feb 2-4, 2016 Dan Cheng J. De Ponte, H. Felice, S. Kincaid, T. Lipton, S. Myers, A. Pekadis, M.
Dan Cheng, Helene Felice 4/8/2015 MQXFS-D Build-up LBNL “Lessons Learned”
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
QXF protection meeting, 4/29/14HQ High Miits Study – H. Bajas, G. Sabbi 1 HQ02 High MIITs Studies Preliminary findings and next steps Hugo Bajas, GianLuca.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
LARP DOE Review, 7/9/2012Long Quadrupole – G. Ambrosio 1 Long Quadrupole Program Giorgio Ambrosio DOE Review of the LARP Program SLAC July 9-10, 2011 LQ.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
LHQ Coil Design and Features Miao Yu Fermilab May 09, 2012.
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
MQXFPM1 and MQXFS1b Test Results
TQS Overview and recent progress
HQ02b Preload Increase - Summary
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Mechanical tolerance analysis for the MQXF prototype structures
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
P. Ferracin and G. Ambrosio
MQXF coil cross-section status
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Cross-section of the 150 mm aperture case
MQXFS6 assembly and loading
Presentation transcript:

Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps

The HQ02 Team Franck Borgnolutti, Rodger Bossert, Dan Cheng, Guram Chlachidze, D. Dietderich, Helene Felice, Arup Ghosh, Arno Godeke, Hugh Higley, Daryl Horler, Chip Kozy, Tom Lipton, Nate Liggins, Maxim Marchevsky, Matt Reynolds, Jesse Schmalzle, James Swanson, Prabir Roy, Gianluca Sabbi, Abdi Salehi, Tiina Salmi, Xiaorong Wang… 04/08/2013H. Felice - LARP CM20 - Napa, CA2

Outline Magnet Overview HQ02 Assembly Summary Next steps 04/08/2013H. Felice - LARP CM20 - Napa, CA3

HQ02 layout COIL 16COIL 15 COIL 17COIL 20 VIEW LOOKING AT LEAD END A C BD Sector A Sector B Sector C Sector D “New” generation of HQ coils:  Coil 15, 16, 17 and 20  108/127 conductor  SS core  mm x mm smaller cable  1 spare coil in fabrication: coil 21 See Franck Borgnolutti’s talk about HQ coil fabrication experience Electrical sequence: (-) 16 – 17 – 15 – 20 – (+) 04/08/2013H. Felice - LARP CM20 - Napa, CA4

HQ02 magnet parameters HQ01e HQ K1.9 K 4.5 K1.9 K Typical I ss 17.3 kA19 kA 16.5 kA18.26 kA Gradient at I ss 195 T/m213 T/m 186 T/m205 T/m Peak Field at I ss 13.6 T14.8 T 13 T14.2 T Stored energy at I ss 0.9 MJ1.1 MJ 0.8 MJ1 MJ Fx per octant per unit length at I ss 2.7 MN/m3.15 MN/m 2.4 MN/m2.9 MN/m Fy per octant per unit length at I ss -3.9 MN/m-4.7 MN/m -3.5 MN/m-4.3 MN/m Fz per magnet end at I ss 1.06 MN1.28 MN 0.96 MN1.18 MN 04/08/2013H. Felice - LARP CM20 - Napa, CA5 Based on extracted strands measurements from BNL and LBNL Coil 15, 16, 17 and 20 => 17 is the limiting coil Jc values at 12 T and 4.2 K with SF correction range from 2914 to 3098 A/mm 2

Structure and assembly steps overview Collar-pack assembly 4 collars bolted against the full length G10 keys Shimming of the alignment key to ensure contact between collar and keys Coil-pack assembly 4 pads bolted around the collars Final assembly and loading Master/bladders and Keys stack is prepared based on coil- pack assembly Insertion of the coil-pack in the yoke shell sub-assembly by sliding on the bottom masters Insertion of the side and top masters Masters include load keys and bladders + pull shims Key parameters we watched Preload distribution Alignment: collar and key must be in contact Preload uniformity among coils Collar pack assembly Coil-pack assembly Bladder slot Master 04/08/2013H. Felice - LARP CM20 - Napa, CA6

Preload uniformity Coil Dimensions (LBNL CMM) 04/08/2013H. Felice - LARP CM20 - Napa, CA7 C17 LE C mm from LE +250  m ~ 0.010” C mm from LE Example of HQ 17 “new generation” Example of HQ 11 “old generation” C11 LE End-shoe shows same dimension New coils much closer to nominal size

Preload uniformity Fuji paper test 04/08/2013H. Felice - LARP CM20 - Napa, CA8 Collar-pack #1 used to assess radial shimming C20 C15 C16 C17 A B C D A BD C Radial shims chosen based on coil CMM measurements Fuji paper positioned radially SG monitoring Led to ground plane insulation scheme  G10: 500  m  Kapton: 250  m  Effective stack: 700  m

Alignment 04/08/2013H. Felice - LARP CM20 - Napa, CA9 Collar-pack #2 and 3# used to assess pole key shimming Measurements with pins and feeler gauges to insure contact between keys and collars C20 C15 C16 C17 A B C D

Preload Motivation for conservative targets 04/08/2013H. Felice - LARP CM20 - Napa, CA10 Azimuthal preload Preload for ~ 200 T/m Target Preload at 300 K:  shell / pole = 863  -450   shell / pole = 66 /-63 MPa Target Preload at 4.2 K:  shell / pole = 1905  -720   shell / pole = 169 / -147 MPa Axial preload Axial preload target: ~ 560 kN of axial preload ~ 58% of Fz at 4.5 K ~ 47 % of Fz at 1.9 K ~ 70 % of Fz at 15 kA From Modeling point of view Layer 1 (35 % of the total end force): Contact pressure maintained >0 up to 219 T/m Layer 2 (65 % of the total end force): Contact pressure maintained >0 up to 180 T/m 4.5 K1.9 K Fz0.96 MN1.18 MN

Preload Strain gauge data – Coil Pole and Shell 04/08/2013H. Felice - LARP CM20 - Napa, CA11 Coil pole Target: -450  Avg: -403  sigma: 181  Target: -63 MPa Avg: -54 MPa Sigma: 25 MPa Shell Target: 860  Avg: 822  sigma: 66  Target: 66 MPa Avg: 68 MPa Sigma: 6.6 MPa Coil 15 already tested

Preload Strain gauge data - Rods Rods Target: 880  Avg: 833  sigma: 23  Target: 60 MPa Avg: 58.5 Mpa Sigma: 1.5 MPa 04/08/2013H. Felice - LARP CM20 - Napa, CA12

Comparison with Model 04/08/2013H. Felice - LARP CM20 - Napa, CA13

Electrical QA 04/08/2013H. Felice - LARP CM20 - Napa, CA14 Electrical QA performed a various step of the assembly Final Electrical QA before shipping to FNAL Sequential R measurements Hipot  1000V coil to components  500 V components to components  All coils good to target except  HQ17 LE IL endshoe to IL PH  HQ16 LE IL / OL endshoe Impulse test to 1000 V

Next steps HQ02 test 04/08/2013H. Felice - LARP CM20 - Napa, CA15 Timeline HQ02 delivered at FNAL April 2 nd 2013 Strain gauges reading checkApril 4 th 2013 Magnet delivery to MTFApril 9 th 2013 Tentative cool-down startMid April 2013 Test set-up 1.9 K – 15 kA header will be used to give priority to 1.9 K testing 90 % of I ss at 4.5 K 82 % of I ss at 1.9 K 169 T/m Consistent with conservative preload approach Test plan Under discussion Will include: magnetic measurements, training, conservative protection study

Post HQ02a test HQ03: Decision to be taken in 1 to 2 months regarding new series of coil Would implement last coil fabrication improvement (toward QXF) See Franck Borgnolutti’s talk Would test reproducibility in performance and field quality 04/08/2013H. Felice - LARP CM20 - Napa, CA16 Thermal cycle or HQ02b If preload looks appropriate => thermal cycle If preload too low or asymmetric Preload adjustment at LBNL => HQ02b New test at FNAL More aggressive protection study Spare coil 21 is also an option