Cathy Beahm Technical Assistance Specialist NH DES, Air Resources

Slides:



Advertisements
Similar presentations
METAL FURNITURE SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART RRRR July 2006.
Advertisements

METAL COIL SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART SSSS May CFR PART 63, SUBPART SSSS May 2006.
METAL CAN SURFACE COATING MACT OVERVIEW 40 CFR PART 63, SUBPART KKKK June CFR PART 63, SUBPART KKKK June 2006.
METAL FURNITURE SURFACE COATING MACT QUESTION & ANSWERS 40 CFR PART 63, SUBPART RRRR July 2006.
Reporting 2011 Emissions Inventories WELCOME! Major Facilities.
Impacts of the New Boiler MACT Rules Les Oakes King & Spalding.
United States Experience: Hazardous Waste Combustion US Standards Controls Emissions.
Healthcare and Air Quality H2E Conference - Dec 6, 2007 K-State Pollution Prevention Institute Ryan Hamel.
Part 63 Boiler Rule for Area Sources AWMA Conference September 11-14, 2012 Biloxi, MS Lee Page Air Toxics Assessment and Implementation Section U.S. Environmental.
Delivering sustainable solutions in a more competitive world Proposed Area and Major Source Boiler NESHAP Overview David Dunn Environmental Resources Management.
U.S. Environmental Protection Agency April 13, 2011 Final Rules to Reduce Air Toxics from Boilers.
Adjustments to the Air Toxics Standards for Major and Area Source Boilers 40 CFR Part 63, Subparts DDDDD and JJJJJJ Summary of Final Changes, Key Highlights.
Boiler GACT Update Georgia AWMA Conference
Non-Hazardous Secondary Materials Definition: How it Relates to Boiler MACT and CISWI Rules Biloxi, MS ♦ September 13, 2012 Melissa Hillman Justin Fickas.
Rick Soucy GZA GeoEnvironmental, Inc.
Managing Air Quality Data 101 Presented by: Chris Bellusci (GeoEngineers) & Claire Lund, PE (Sanborn Head) International Conference for Environmental Data.
NSR Regulations Update November 14, 2012 Atlanta, GA Katy R. Forney Energy Sector Technical Authority EPA – Region 4 Atlanta, Georgia.
Steffes Engineered Flare System
Hydraulic Fracturing and Air Issues in the Oil and Natural Gas Sector
CLEAN AIR FOR LAGOS STATE Presentation by ENVIRONMENTAL LAW RESEARCH INSTITUTE (ELRI) AND GAMMA GAS DETECTION & MONITORING LIMITED (GAMMA GAS) TO SELECT.
Harmonization of Parts 60 and 75
EPA Proposed Mandatory Greenhouse Gas Reporting Rule.
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Identification of Non- Hazardous Secondary Materials That Are Solid Wastes EPA Proposed Rule April 30, 2010 Osman Environmental Solutions Harrisburg, PA.
RICE MACT and Oil Analysis
Cogeneration Facility The University of North Carolina at Chapel Hill Cogeneration Systems Energy Services Department Phil Barner- Cogeneration Systems.
Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013.
Air Quality Legislations in OR and WA Pius Ndegwa Animal Waste Nutrients and Air Quality Specialist, Biological Systems Engineering Washington State University.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Recent EPA Regulation Development Presented by Bill Luthans to the 56 th Meeting of the Joint Advisory Committee Meeting for the Improvement of Air Quality.
Overview of the Clean Air Act and the Proposed Petroleum Refinery Sector Risk and Technology Review and New Source Performance Standards Public Outreach.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
MCIC Workshop 2012 Complying with NC Air Quality Regulations Boiler MACT/GACT and 112j Steve Schliesser Division of Air Quality Environmental Engineer.
Wes Thornhill, Chief Industrial Chemicals Section Air Division
Boiler MACT and Other Air Developments 2011 Southern Section AWMA Conference Callaway Gardens, GA Boiler MACT and Other Air Developments 2011 Southern.
Division of Air Quality Update on EPA Boiler MACT Rules Steve Schliesser Environmental Engineer March 2012.
April 15, 2015 Betty Gatano, P.E. Permitting Section North Carolina Division of Air Quality, Raleigh, NC (919)
1 Year in Review: Clean Air Act Presented by: Tom Wood Stoel Rives LLP October 8, 2010 Things Are Getting Really Complicated.
Materials Lifecycle Solutions MACT DEVELOPMENT DEFINITIONS HAP - HAZARDOUS AIR POLLUTANTS: FEDERAL LIST OF 188 COMPOUNDS AND COMPOUND CATAGORIES. COMMON.
Air Permitting Overview.
Clean Air Act and Permits
Presentation to Board of Forestry November 29, 2011 Alice Edwards Division of Air Quality Alaska Department of Environmental Conservation
Robert L. Burns, Jr., Esq. Buchanan Ingersoll & Rooney PC August 1, 2013 Impact of Environmental Regulation on Coal Combustion for Electrical.
A&WMA Georgia Regulatory Update Conference Current State of the Air in GA Jac Capp, GA EPD, Branch Chief, Air Protection Branch April 16, 2013.
Air Toxics in Region 4 A&WMA Annual Conference August 6, 2008 Lee Page Air Toxics Assessment and Implementation Section EPA, Region 4 Atlanta, Georgia.
Presentation Overview Alaska air pollution Pollutants Sources What is an emissions inventory?
Air Quality 101 Kansas Air Quality Program overview.
WILL ALLISON AIR POLLUTION CONTROL DIVISION APRIL 16, 2012 Oil and Natural Gas Air Pollution Standards.
Blue Skies Delaware; Clean Air for Life DNREC Air Quality Management Air Permitting Seminar Natural Minor Permitting.
NSPS Residential Wood Heater Recommendations WESTAR Meeting Portland, OR November 18, 2009 Lisa Rector Senior Policy Analyst
Fuels For Schools General Air Quality Considerations Diane R. Lorenzen, P.E. Montana Department of Environmental Quality October 17, 2007.
1. Carbon dioxide (CO 2 ) – Naturally occurring and man- made. 5,505.2 mmts emitted in 2009, GWP = 1 Methane (CH 4 ) - Naturally occurring and man-made.
Presumptive MACT For Municipal Solid Waste Landfills July 1999 Emission Standards Division US Environmental Protection Agency.
Georgia’s 112(g) Experiences Eric Cornwell Acting Manager Permitting Program.
New Air Quality General Permit G-70A Oil and Natural Gas Industry Workshop October 24, 2012 Laura Jennings Engineer DEP – Division of Air Quality 10/24/2012.
1 Permit Exemptions Rule Revisions North Carolina Division of Air Quality Permit Exemptions Rule Revisions North Carolina Division of Air Quality Air Quality.
Blue Skies Delaware; Clean Air for Life 10/8/08 Minor New Source Review Alberto Roybal.
Current Status, New Directions
1 Region 5 Enforcement Approach George Czerniak June 13, 2007 NACAA Enforcement and Compliance Workshop.
Hot Topics in Air Quality NAAQS, Regulations, and Other Developments Jeff Slayback A&WMA Southwest Ohio Chapter August 19, 2010.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Portland Cement NESHAPs & NSPS, and Related Solid Waste Combustion Rules David L. Jones Eastern Kern APCD November 4, 2011 California Desert Air Working.
Proposed Rulemaking: Additional RACT Requirements for Major Sources of NO x and VOCs (25 Pa. Code Chapters 121 and 129) Environmental Quality Board November.
Steve Page Office Director, OAQPS NACAA Spring Meeting 2010
Day 2: Primary Pollutants
Air Quality Permitting Guidelines for Industrial Sources
Boiler Sheltered Initiative
Kansas Air Quality Seminar March 5, 2008
Day 2: Primary Pollutants
Presentation transcript:

Cathy Beahm Technical Assistance Specialist NH DES, Air Resources New England Healthcare Engineers’ Society Recently Promulgated National Air Quality Regulations and How They Will Impact Hospitals Cathy Beahm Technical Assistance Specialist NH DES, Air Resources

Presentation Overview Air Emission Basics Boiler Regulations Emergency Generator Regulations Questions

Air Emission Basics Criteria Pollutants Products of combustion: Nitrogen Oxides (NOx), Carbon Monoxide (CO), Sulfur Dioxide (SO2), Particulate Matter (PM) and Volatile Organic Compounds (VOC) or Non-methane hydrocarbons (NMHC) The Clean Air Act (CAA) requires EPA to identify sources of Hazardous Air Pollutants (HAPs) and develop regulations to limit these emissions. Boilers, Incinerators and Reciprocating Internal Combustion Engines Hazardous Air Pollutants List of 188 HAPs from the CAA can be found at http://www.epa.gov/oar/toxicair/newtoxics.html

Air Emission Basics (continued) EPA has developed both Major and Area Source National Emission Standards for Hazardous Air Pollutants (NESHAPs) promulgated under 40 CFR 63 Major vs. Area Sources Major sources have the Potential to Emit (PTE) greater than 10 tpy individual HAP and 25 tpy combined HAPs Area sources are facilities that are not major sources - who do not have PTE above these levels either due to permit limitations or design capacity. Majority of Sources in NH are Area Sources

Hospital Specifics Hospitals in NH are area sources of HAPs based on the boilers and emergency generators currently permitted. To determine your facility’s classification, you must calculate your PTE of HAPs from all devices at your facility (boilers, emergency generators, ethylene oxide sterilizers, etc.) Hospitals typically burn traditional fuels in their boilers (coal, biomass, oil or gas) as opposed to solid waste. Presentation today is not covering HIMWI (none in NH – few, if any, in New England). Almost 97% of the hospitals in NH burn fuel oil alone or in combination with natural gas. One facility in NH operates 2 small (<10 MMBtu/hr) biomass boilers. Over 70% have at least one boiler >10 MMBtu/hr.

Boiler Regulations

Overview of recent EPA actions affecting boilers EPA issued three rules that reduce emissions of HAPs: NESHAP for Industrial, Commercial, and Institutional Boilers and Process Heaters (40 CFR 63, Subpart DDDDD) (“Boiler MACT”) NESHAP for Area Sources: Industrial, Commercial, and Institutional Boilers (40 CFR 63, Subpart JJJJJJ) (“Boiler Area Source Rule”) Section 129 NSPS and Emission Guidelines for Commercial and Industrial Solid Waste Incinerators (CISWI) EPA also issued a final rule that defines “solid waste” Necessary to determine whether a source must meet boiler standards or an incinerator standard Explain delegation issue and the lead agency on each rule.

Overview of recent EPA actions affecting boilers (cont.) Schedule Proposals signed on April 29, 2010 Published in the Federal Register on June 4, 2010 Promulgations signed on February 21, 2011 (Court-ordered) Published in the Federal Register on March 21, 2011 Effective Date: May 20, 2011 EPA has initiated reconsideration of certain aspects of the boiler and CISWI rules Some of the comments raise difficult technical issues that would benefit from additional public involvement. Stakeholders have petitioned for reconsideration of other issues. Stay On May 18, 2011, EPA delayed the effective date of the Boiler MACT and CISWI Boiler Area Source Rule and Solid Waste Definition are in effect even during the reconsideration process. Facilities need to comply with rules as they were promulgated. Key points: June 4, 2010 is the date that distinguishes “existing” devices from “new” devices. March 21, 2011 is the date that establishes future due dates for notifications, work practice standards. May 20, 2011 was the effective date of the Area Source Boiler Rule. Boiler MACT and CISWI are stayed and Boiler MACT, Area Source Boiler Rules and CISWI are under reconsideration. EPA’s Tentative Schedule for Reconsideration: Proposal due out October, 2011; Final April, 2012

Focus of Today’s Presentation: Boiler Area Source Rule Area Sources burning Traditional Fuel (oil)

Boiler Area Source Rule Rule is broken down based on: Boiler size: Small (<10 MMBtu/hr) Large (≥10 MMBtu/hr) Fuel type: Coal-fired units Biomass-fired units Oil-fired units Boiler Construction: Existing prior to June 4, 2010 New or reconstructed after June 4, 2010 Note: NH has not taken delegation of the Boiler Area Source Rule. Therefore, the information presented here is based on the regulation and conversations that have taken place with EPA, Headquarters and Region 1, and are in some cases based on interpretations by EPA and DES as we have tried to work through various issues not clearly defined in the existing rule. In addition, any requirements in the existing rule may be changed in the future as a result of the reconsideration process. It is up to the source to review the regulation as it pertains to their specific situation, comply with the regulation as promulgated and keep informed of any changes.

Are any boilers not subject to this subpart? Any boiler covered by another part of 40 CFR 63 Any boiler covered by CISWI Hazardous waste boilers A boiler that is used specifically for research and development. This exemption does not include boilers that solely or primarily provide steam (or heat) to a process or for heating at a research and development facility. Any boiler that is used as a control device to comply with another Subpart of 40 CFR 63, provided that at least 50 percent of the heat input to the boiler is provided by the gas stream that is regulated under another subpart. Key points: Gas-fired boilers (as defined) are not subject to the Area Source Boiler Rule. Dual fired boilers (e.g. NG/#2 FO) that don’t meet or are unwilling to meet the gas-fired boiler definition would be subject to the rule when burning liquid fuel. (Existing: work practice standards; New: emission limitations and work practice standards) If a gas-fired boiler switches to dual fuel or liquid fuel only in the future, this constitutes fuel switching and the device would be considered “new”. At that point, the device would have to meet the oil-fired emission limit as well as tune-up.

Are any boilers not subject to this subpart? (continued) A hot water heater as defined in this subpart. Hot water heater means a closed vessel with a capacity of no more than 120 U.S. gallons in which water is heated by combustion of gaseous or liquid fuel and is withdrawn for use external to the vessel at pressures not exceeding 160 psig, … and … water temperatures exceeding 210°F. A gas-fired boiler as defined in this subpart. Gas-fired boiler includes any boiler that burns gaseous fuels not combined with any solid fuels, burns liquid fuel only during periods of gas curtailment, gas supply emergencies, or periodic testing on liquid fuel. Periodic testing of liquid fuel shall not exceed a combined total of 48 hours during any calendar year. Key points: Gas-fired boilers (as defined) are not subject to the Area Source Boiler Rule. Dual fired boilers (e.g. NG/#2 FO) that don’t meet or are unwilling to meet the gas-fired boiler definition would be subject to the rule when burning liquid fuel. (Existing: work practice standards; New: emission limitations and work practice standards) If a gas-fired boiler switches to dual fuel or liquid fuel only in the future, this constitutes fuel switching and the device would be considered “new”. At that point, the device would have to meet the oil-fired emission limit as well as tune-up.

Fuel Switching Rule Provisions A boiler is a new affected source if you commenced fuel switching from natural gas to solid fossil fuel, biomass, or liquid fuel after June 4, 2010. If you intend to switch fuels, and this fuel switch may result in the applicability of a different subcategory or a switch out of Subpart JJJJJJ due to a switch to 100 percent natural gas, you must provide 30 days prior notice of the date upon which you will switch fuels. If you own or operate an industrial, commercial, or institutional boiler and would be subject to this subpart except for the exemption for units covered by the CISWI rules, and you cease combusting solid waste, you must be in compliance with this subpart on the effective date of the waste to fuel switch. If you intend to commence or recommence combustion of solid waste, you must provide 30 days prior notice of the date upon which you will commence or recommence combustion of solid waste.

Emission Limits for Area Source Boilers Oil and Biomass Only Subcategory Emission Limits PM (lb/MMBtu) 10 – 30 MMBtu/hr >30 MMBtu/hr New Biomass 0.07 0.03 New Oil Existing Biomass - Existing Oil Note: The emission limit of 0.03 lb/MMBtu limit for PM from new devices is the same emission limit in the NSPS for new >30 MMBtu/hr boilers.

Energy Assessment [40 CFR 63, Subpart JJJJJJ - Table 2] One-time energy assessment performed by a qualified energy assessor. An energy assessment completed on or after January 1, 2008, that meets or is amended to meet the energy assessment requirements satisfies the energy assessment requirements. The energy assessment must include: A visual inspection of the boiler system, An evaluation of operating characteristics of the facility, specifications of energy using systems, operating and maintenance procedures, and unusual operating constraints, Inventory of major systems consuming energy from affected boiler(s), A review of available architectural and engineering plans, facility operation and maintenance procedures and logs, and fuel usage, A list of major energy conservation measures, A list of the energy savings potential of the energy conservation measures identified, A comprehensive report detailing the ways to improve efficiency, the cost of specific improvements, benefits, and the time frame for recouping those investments. EPA is hoping to come out with more detailed guidance on the energy assessment portion of the rule soon. NH DES is also going to be conducting Workshops on the rules and expanding the website with information and links to documents to aid facilities in complying with the rules, including but not limited to lists of qualified energy assessors, notification forms, Fact Sheets and Frequently Asked Questions.

Tune-up Requirement [63.11223(b)] As applicable, inspect the burner, and clean or replace any components of the burner as necessary (you may delay the burner inspection until the next scheduled unit shutdown, but you must inspect each burner at least once every 36 months). Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer’s specifications, if available. Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. Optimize total emissions of carbon monoxide. This optimization should be consistent with the manufacturer’s specifications, if available.

Tune-up Requirement [63.11223(b)] (continued) Measure the concentrations in the effluent stream of carbon monoxide in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made (measurements may be either on a dry or wet basis, as long as it is the same basis before and after the adjustments are made). Maintain onsite and submit, if requested, biennial report containing the following information: The concentration of CO in the effluent stream in ppm, by volume, and oxygen in volume percent, measured before and after the tune-up of the boiler. A description of any corrective actions taken as a part of the tune-up of the boiler. The type and amount of fuel used over the 12 months prior to the biennial tune-up of the boiler. If the unit is not operating on the required date for a tune-up, the tune-up must be conducted within one week of startup.

Existing Biomass and Oil-Fired Boilers Notifications and Reporting Timeline Existing Biomass and Oil-Fired Boilers <10 MMBtu/hr ≥10 MMBtu/hr Initial Notification of Applicability Report By September 17, 2011 Initial Compliance Date First biennial tune-up by March 21, 2012 One Time Energy Assessment NA By March 21, 2014 Notification of Intent to Conduct a Performance Test Initial Compliance Testing Initial Notification of Compliance Status Report By July 19, 2012 By July 19, 2012 for initial tune-up; By July 19, 2014 for one-time energy assessment Continuing Compliance –Biennial Tune-up Subsequent tune-ups should be completed no later than 25 months after the previous tune-up Continuing Compliance –Triennial Testing Biennial Compliance Certification Report – Biennial Tune-up Prepare first report by March 1, 2015 with subsequent reports prepared biennially by March 1st Annual Compliance Certification Report Sample Initial Notifications and Notification of Compliance Status forms are located on the EPA and DES websites. http://www.epa.gov/ttn/atw/boiler/boilerpg.html http://des.nh.gov/

New Biomass and Oil-Fired Boilers Installed between 6/4/10 and 5/20/11 Notifications and Reporting Timeline New Biomass and Oil-Fired Boilers Installed between 6/4/10 and 5/20/11 <10 MMBtu/hr ≥10 MMBtu/hr Initial Notification of Applicability Report By September 17, 2011 Initial Compliance Date First biennial tune-up by May 20, 2011 One Time Energy Assessment NA Notification of Intent to Conduct a Performance Test At least 60 days before performance stack test is scheduled to begin Initial Compliance Testing By May 20, 2011 Initial Notification of Compliance Status Report Within 60 days of completing the performance test Continuing Compliance –Biennial Tune-up Subsequent tune-ups should be completed no later than 25 months after the previous tune-up Continuing Compliance –Triennial Testing No more than 37 months after the previous test Biennial Compliance Certification Report – Biennial Tune-up Prepare first report by March 1, 2012 with subsequent reports prepared biennially by March 1st Annual Compliance Certification Report Prepare first report by March 1, 2012 with subsequent reports prepared annually by March 1st Sample Initial Notifications and Notification of Compliance Status forms are located on the EPA and DES websites. http://www.epa.gov/ttn/atw/boiler/boilerpg.html http://des.nh.gov/

New Biomass and Oil-Fired Boilers Installed after 5/20/11 Notifications and Reporting Timeline New Biomass and Oil-Fired Boilers Installed after 5/20/11 <10 MMBtu/hr ≥10 MMBtu/hr Initial Notification of Applicability Report Within 120 days of startup of the boiler Initial Compliance Date First biennial tune-up upon startup One Time Energy Assessment NA Notification of Intent to Conduct a Performance Test At least 60 days before performance stack test is scheduled to begin Initial Compliance Testing Within 180 calendar days of startup Initial Notification of Compliance Status Report Within 60 days of completing the performance test Continuing Compliance –Biennial Tune-up Subsequent tune-ups should be completed no later than 25 months after the previous tune-up Continuing Compliance –Triennial Testing No more than 37 months after the previous test Biennial Compliance Certification Report – Biennial Tune-up Prepare first report by March 1st of the year immediately following startup of the boiler with subsequent reports prepared biennially by March 1st Annual Compliance Certification Report Prepare first report by March 1st of the year immediately following startup of the boiler with subsequent reports prepared annually by March 1st Sample Initial Notifications and Notification of Compliance Status forms are located on the EPA and DES websites. http://www.epa.gov/ttn/atw/boiler/boilerpg.html http://des.nh.gov/

Notification and Reporting Guidance Sample Initial Notifications, Notifications of Compliance Status, and Tune-up Guidance and Example Recordkeeping Forms for Area Sources can be found under “Implementation Tools” at: http://www.epa.gov/ttn/atw/boiler/boilerpg.html Send copies of paperwork to EPA Region 1 US Environmental Protection Agency 5 Post Office Square, Suite 100, Mail code: OES04-2, Boston MA 02109-3912 Attention: Air Clerk and in the case of NH sources New Hampshire Department of Environmental Services Air Resources Division 29 Hazen Drive P.O. Box 95 Concord, NH 03302-0095 Attention: Section Supervisor, Compliance Bureau

Contacts Regulation Contact Office Telephone Number E-mail Boiler MACT Brian Shrager USEPA Headquarters - OAQPS (919) 541-7689 Shrager.brian@epa.gov Susan Lancey USEPA – Region 1 (617) 918-1656 Lancey.susan@epa.gov Boiler Area Source Rule Jim Eddinger (919) 541-5426 Eddinger.jim@epa.gov CISWI Toni Jones USEPA Headquarters - NRCG (919) 541-0316 Jones.toni@epa.gov Solid Waste Definition George Faison USEPA Headquarters – RCRA (703) 305-7652 Faison.george@epa.gov Jui-Yu Hsieh USEPA - Region 1 (617) 918-1646 Hsieh.juiyu@epa.gov

Design gross heat input (BTU/hr) Permitting Guidance NH Permit Applicability NH Permit Approaches Individual Permits (Temporary, State, Title V) Device Design gross heat input (BTU/hr) Fuel External Combustion Device (Boiler) ≥10,000,000 Gaseous fuel, LPG, distillate fuel (#2 fuel oil) or diesel fuel, any combination ≥4,000,000 #4 fuel oil ≥2,000,000 Solid fuel, residual fuel (#6 fuel oil), used oil, any combination

Emergency Generator Regulations

Overview of recent EPA actions affecting emergency generators EPA issued three rules that regulate emissions from reciprocating internal combustion engines (RICE): NSPS for Stationary Compression Ignition (CI) Internal Combustion Engines (40 CFR 60, Subpart IIII) (“Quad I”) NSPS for Stationary Spark Ignition (SI) Internal Combustion Engines (40 CFR 60, Subpart JJJJ) (“Quad J”) NESHAP for Stationary Reciprocating Internal Combustion Engines (RICE) (40 CFR 63, Subpart ZZZZ) (“Quad Z”)

How do these three rules compare How do these three rules compare? (Information is for comparison purposes only) Regulation Fuel Type Manufacture Date of Engine1 Pollutants Regulated Quad I Diesel Beginning in model year 2007 and later NOx, PM, CO, NMHC Quad J Gasoline Quad Z Both fuels All engines HAPs 1 Manufacture date varies with size of engine. See rule for more accurate information on the dates.

NSPS for Stationary CI Internal Combustion Engines (“Quad I”) Affects new, modified, and reconstructed stationary CI engines [diesel fired engines] Initially promulgated on July 11, 2006 Amendments signed June 8, 2011 Applies to diesel engines (compression ignition).

Who is Subject to Quad I? Manufacturers of 2007 model year or later stationary CI engines <30 liters/cylinder displacement Model years differ for fire pump engines (2008-2011 depending on size) Owners/operators of engines Constructed (ordered) after 7/11/2005 and manufactured after 4/1/2006 Constructed after 7/1/2006 for fire pump engines Modified/reconstructed after 7/11/2005

Quad I - Emission Standards Phased in over several years and have Tiers with increasing levels of stringency Output-based, units of g/kW-hr (g/HP-hr) Pollutants: NOx, PM, CO, NMHC SOx reduced through use of low sulfur fuel Modeled after EPA’s standards for non-road and marine engines

Quad I - Compliance Manufacturers must certify 2007 model year and later engines with a displacement <30 liters/cylinder Certification = EPA Certificate of Conformity Owner/operator of emergency generators complies by: Purchasing certified engine Install, configure, operate and maintain engine per manufacturer’s instructions or manufacturer-approved procedures Install a non-resettable hour meter prior to startup Owner/operator operates unit with ultra low sulfur fuel after October 1, 2010 (<15 ppm sulfur content)

Quad I - Notification and Recordkeeping Emergency Generators not required to submit an initial notification. Maintain documentation from the manufacturer certifying that the engine complies with the applicable emission standards of Quad I Record the time of operation of the engine and the reason the engine was in operation during that time. Keep records of the sulfur content of the fuel burned in the device.

NSPS for Stationary SI Internal Combustion Engines (“Quad J”) Affects new, modified, and reconstructed stationary SI engines [gas fired engines] Initially promulgated on January 18, 2008 Amendments signed June 8, 2011 Applies to gas fired engines (spark ignition).

Who is Subject to Quad J? Manufacturers of stationary SI engines: ≤25 HP and manufactured on/after 7/1/2008 >25 HP, gasoline or rich burn LPG, manufactured on/after 7/1/2008 (on/after 1/1/2009 for emergency engines) >25 HP, not gasoline or not rich burn LPG, voluntary certified engines manufacture on/after 7/1/2007 >500 HP (except lean burn 500≤HP<1,350) 1/1/2008 lean burn 500≤HP<1,350 7/1/2008 <500 HP 1/1/2009 emergency engines

Who is Subject to Quad J? (continued) Owners/operators of stationary SI engines: Constructed after 6/12/2006 and ≥500 HP manufactured on/after 7/1/2007 (except lean burn 500≤HP<1,350) Lean burn 500≤HP<1,350 manufactured on/after 1/1/2008 <500 HP manufactured on/after 7/1/2008 Emergency >25 HP manufactured on/after 1/1/2009 Modified/reconstructed after 6/12/2006

Quad J - Emission Standards Phased in over several years and have Tiers with increasing levels of stringency Output-based, units of g/kW-hr (g/HP-hr) ppmvd@15% O2, standards for some engines Pollutants: NOx, CO, VOC Sulfur limit on gasoline Some standards modeled after EPA’s standards for non-road SI engines

Quad J - Compliance Manufacturers must certify engines ≤25 HP, gasoline engines, and rich burn LPG engines Manufacturers can elect to certify other engines Owner/operator complies by either: For certified engines: Install, configure, operate and maintain engine per manufacturer’s instructions or manufacturer-approved procedures For uncertified engines: Conduct performance test (requirements vary depending on engine size)

Quad J - Notification and Recordkeeping Owners/operators of uncertified SI RICE ≥500 HP must submit an initial notification. Owners/operators of all SI RICE must keep records of: All notifications All maintenance conducted on the engine For certified engines: Documentation from the manufacturer certifying that the engine complies with the applicable emission standards of Quad J For uncertified engines or certified engines operating in a non-certified manner: Documentation that the engine meets the emission standards.

NESHAP for Stationary Reciprocating Internal Combustion Engines (RICE) (“Quad Z”) New or reconstructed stationary RICE located at an area source must meet the requirements of Quad I or Quad J. No further requirements apply under Quad Z. Existing (1/1/2009) institutional emergency stationary RICE located at an area source of HAP emissions do not have to meet the requirements of Quad Z or the General Provisions of 40 CFR 63.

Permitting Guidance NH Permit Applicability NH Permit Approaches General State Permit (up for renewal April 2013) On-line permitting (http://des.nh.gov) Easy, fast, less paperwork Initial permit is free Emission-based fees still apply Individual Permits (Temporary, State, Title V) Device Design gross heat input (BTU/hr) Fuel Individual Combined One or more Internal Combustion Devices (Engines) 150,000 1,500,000 Liquid fuel oil 10,000,000 NG or LPG

Questions? Contact: Cathy Beahm N.H. Department of Environmental Services Air Resources Division catherine.beahm@des.nh.gov (603) 271-2822