Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.

Slides:



Advertisements
Similar presentations
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
Operating Margins UNC Sub Group Tuesday 4 th November 2008.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Changes to the Network Emergency Co-ordinator (NEC) Safety Case resulting from Exit Reform UNC Workgroup 0412 Meeting – 1 st March 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Gas Emergency Arrangements Proposal Transmission Workstream 5 th April 2007.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Operating Margins UNC Sub Group Tuesday 2nd December 2008.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
1 Modification Proposal 0199: Clarification around the application of the UNC Dispute Resolution Process Alison Chamberlain National Grid Distribution.
Enduring Exit Regime & NTS Risk Management Processes Offtake Arrangement Workstream – OAD Section I Review Group 316.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
UNC Modification 0050 – Storage Monitor Adjustment.
Review Group -140 Thoughts on additional information requirements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Connected System Exit Points Options for strategic regime change Chris Warner.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
System Operator information transparency. As Transmission System Transporter National Grid Gas undertakes responsibility for safe, effective and efficient.
Transitional Exit Capacity Proposals -Update
Introduction of Code Contingency Guidelines Document
Transmission Workstream 4th July 2007
SO Incentives from April 2010
7th July 2011 Transmission Workgroup - Elexon
Joint Office Presentation for Modification 0678
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Long Term Non Firm Capacity Update
Introduction of Code Contingency Guidelines Document
Transmission Workstream – Partial Assignment
Proposed Transitional Gas Exit Arrangements
Transmission Workstream 2nd December 2010
Entry Overrun Calculation
195AV “Future work” – system flexibility
Commercial Arrangements For Gas Quality Service – Introduction
Presentation transcript:

Operating Margins

2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition C25 Which requires use of reasonable endeavours to promote competition in the provision of Operating Margins (OM) services by 1 st April 2009 Progress to date:  Initial consultation exercise March and May 2008 Detailed the need for the OM Service Considered options for further competitive provision of OM  Second consultation concluding September 2008 Presented conclusions on how the OM Service could be delivered by Potential Service Providers Considered the barriers to provision for each Potential Service Provider Considered how to procure the OM Service Looked at how to incentivise Operating Margins going forward

3 What are Operating Margins (OM)? OM gas is only used in exceptional circumstances to:  Allow time for National Grid Gas to reschedule the NTS or for the market to deliver additional supply  Protect against the need to declare emergency conditions so that normal commercial market operation can be maintained where possible Primarily, OM will be used in the immediate period following operational stresses/shocks:  Supply Loss  Unexpected pipeline and/or plant failure  Demand Forecast Error  Facilitate orderly rundown (partial or full)

4 What makes a good OM Provider?  Must be able to deliver a physical change in gas offtake or delivery of gas onto the NTS  Rapid response  Measurable, demonstrable service  Must be available for NGG to call on at all times declared in advance (day or night)

5 Current OM Service Providers  Short Range Storage  Medium Range Storage  Long Range Storage  LNG Importation Terminals with Storage

6 Potential OM Service Providers OM Provision from NTS Connected Demand:  NTS connected demand, such as Combined Cycle Gas Turbine (CCGT) Power Stations and other Very Large Daily Metered Customer (VLDMCs) could provide an OM service by rapidly reducing gas offtake from the NTS at exit points OM Provision from Offshore Supply & Importation:  Offshore supplies could provide an OM service by increasing gas input into the NTS at entry points DNs  Distribution Networks could provide an OM service by reducing gas offtake from the NTS at exit points More information available on the National Grid website 

7 Impact on Section K Operating Margins Current Section K: Operating Margins  Current provisions in Section K envisages provision from storage sites & LNG Importation Terminals only via Capacity arrangements (National Grid NTS holds capacity and gas for use when required), and Delivery arrangements (3 rd party holds capacity and gas for use when required)  Section K currently complex Propose to rewrite Section K Operating Margins:  Aim to add clarity, and  Facilitate provision of the service from a wider pool of providers to open up more competitive and efficient procurement

8 Process going forward Request the establishment of a Sub Group to the Transmission Workstream  Sub Group activity to review and agree business rules to facilitate competition in the provision of Operating Margins  NGG NTS to subsequently raise Modification Proposal  Aim for 1 st April 2009 implementation in line with Licence

Proposed Consent to Modify section K4.2.6 WACOG Margins

10 Consent to Modify Consent to Modify – Revision to TPD Section K Margins WACOG - paragraph  Incorrect cross references Identified: Error introduced by MP 311 and compounded by 710.

11 Code Comparison cross referenced the following provisions: Prevailing Summary of Code Text – post MP0311  (c) the amounts which have accrued due from National Grid NTS (Margins) in respect of any Storage Gas Transfers.  (e) Amounts incurred by National Grid NTS (Margins) by way of balancing charges payable to National Grid NTS.  (a) the quantity of the relevant Carry-Over Margins Gas multiplied by the Operating Margins WACOG as at the last Day of such Storage Year;  (b) the amounts which have accrued due from Transco (Margins) pursuant to the Margins Gas Procurement Arrangements Summary of Code Text – pre MP0311  (e) the amounts payable by Transco (Margins) by way of Transportation Charges.  (g) the amounts paid or payable by Transco (Margins) by way of injection charges.  (a) the amounts (if any) paid by Transco (Margins) to the Top- up Manager.  (b) ) the quantity of the relevant Carry-Over Margins Gas multiplied by the relevant Operating Margins WACOG as at the last Day of such Storage Year;  (c) the amounts which have accrued due from Transco (Margins) pursuant to the Margins Gas Procurement Arrangements.  (d) the amounts which have accrued due from Transco (Margins) in respect of any Storage Gas Transfers

12 What is the financial impact? A retrospective re-calculation of WACOG based on difference between current UNC text and the pre UNC Modification 311 text demonstrates that;  If current UNC text was upheld then the over-recovered amount from 1999 to date would be just under £38k and NG NTS would be disincentivised from purchasing gas “in store” from other storage Users despite this being potentially the most efficient option.

13 Proposed Consent to Modify section K4.2.6 WACOG Margins  NG NTS believe it is appropriate to raise the proposed Consent to correct the WACOG cross references and relevancy prior to commencing the review of K so that the starting basis is correct.