The National Environmental Policy Act (NEPA)

Slides:



Advertisements
Similar presentations
ISO EMS OVERVIEW FOR CONTRACTORS
Advertisements

Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Objectives Terminal Objective
THE DIVERSITY OF INTERESTS IN ENVIRONMENTAL GOVERNANCE A CHALLENGE FOR THE RULE OF LAW By Professor D E Fisher.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Planning Permission Process and Procedures
Area Commissions Purpose Area commissions are established to afford additional voluntary citizen participation in decision-making in an advisory.
Contractor Management and ISO 14001:2004
Environmental Management Systems An Overview With Practical Applications.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
Environmental Justice: Principles, Policies, Guidance, and Effective Practices FTA Region VI Civil Rights Colloquium March 29, 2006.
NHPA, Section 106, and NEPA Highlights and Misconceptions.
The National Environmental Policy Act (NEPA)
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Negotiating the NEPA Maze: It Really Is Rocket Science Start.
Protection Against Occupational Exposure
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Sacred Sites. Documentation Documentation: Forest Supervisor or Ranger District Offices may document Sacred site (s) information in a variety of ways.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Environmental Impact Assessment (EIA): Overview
The National Environmental Policy Act
EPA!!!!.  One of the first laws ever created to protect the environment  Came into effect due to public concern about the deteriorating human environment.
L O N G B E A C H, C A. Rob Adams Vice President, Landrum & Brown NEPA Essentials — Tools: E, B, Desk Reference,
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Basics of OHSAS Occupational Health & Safety Management System
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Health and Safety Policy
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
SAFETEA-LU Section 6002 “ Efficient Environmental Reviews for Project Decisionmaking”
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
By Rachel Coleman.  “ The head of any federal agency having direct or indirect jurisdiction over a proposed federal or federally assisted undertaking.
1 CDBG and Environmental Review For Local Officials.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Cooperating Agency Status Presented by Horst Greczmiel Associate Director, NEPA Oversight Council on Environmental Quality Washington, DC September 14,
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Environmental Officer Course Introduction Fort Wainwright, Alaska Environmental Officer Course 2011 Name//office/phone/ address UNCLASSIFIED 12/24/2015.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Managing the Environmental & Project Development Process Presented by the Ohio Department of Transportation NEPA&CEQ.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
By: Alyssa Kaiser and Celia Rozanski. Before the Act Prior to 1969, the USA had no clear environmental policy Prior to 1969, the USA had no clear environmental.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
National Environmental Policy Act An established US national policy Draft Year: 1969 Amendment Years: Section amended May 27, 1986 “Environmental.
Integration of National Environmental Policy Act (NEPA) and National Historic Preservation Act (NHPA) NEPA and NHPA A Handbook for Integrating NEPA and.
CEQA 101  CA Legislature passed CEQA in 1970; signed by Governor Reagan  CEQA statutes are found in Public Resources Code sections et seq.  The.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
National Environmental Policy Act of 1969 (NEPA)
National Environmental Policy Act (NEPA)
Environmental Planning in the Army Corps of Engineers
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978)
National Environmental Policy Act of 1969 (NEPA)
The National Environmental Policy Act (NEPA) (Modified from DOE)
NEPA Assignment Program Overview
Presentation transcript:

The National Environmental Policy Act (NEPA) 1

Objectives Terminal Objective Given the Environmental Laws and Regulations course manual as a reference, you will be able to: Explain the purpose of the National Environmental Policy Act (NEPA) and how to meet its requirements. NEPA

Objectives Enabling Objectives State NEPA’s purposes Identify the resources available that facilitate the Department’s compliance with NEPA. Outline the NEPA environmental review planning procedures. NEPA

Objectives Enabling Objectives (continued) Describe the documentation required in the NEPA environmental review process. Specify how Federal statutes and regulations are coordinated with NEPA review requirements. NEPA

Overview The National Environmental Policy Act (NEPA) of 1969 is the basic national charter for protection of the environment. NEPA 2

Overview NEPA was necessary to ensure that Federal agencies would consider environmental concerns when making decisions, because often the statutes that created the agencies did not include an environmental mandate. NEPA 3

Overview NEPA: Established policy [Section 101(a)] Set goals [Section 101(b)] Provided the means for carrying out policy (Section 102) Established the Council on Environmental Quality (CEQ) (Section 202) NEPA 4

Objectives The objectives of NEPA are to: Declare a national policy that will encourage productive and enjoyable harmony between man and the environment NEPA 5

Objectives Promote efforts that will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man Enrich the understanding of the ecological systems and natural resources important to the Nation Establish the CEQ NEPA 6

Objectives How does NEPA accomplish these objectives? By ensuring considerations of environmental issues before conducting major Federal actions NEPA

Title I Section 101 Section 101(a) declares NEPA’s general policy: It is the continuing policy . . . to use all practicable means and measures . . . to create and maintain conditions under which man and nature can exist in productive harmony, and fulfill the social, economic, and other requirements of . . . Americans. NEPA 7

Title I Section 101 Section 101(b) sets forth NEPA’s six goals: Fulfill the responsibilities of each generation as trustee of the environment for succeeding generations Assure for all Americans safe, healthful, productive, and esthetically and culturally pleasing surroundings NEPA 8

Title I Section 101 Attain a wide range of beneficial environmental uses without degradation, risk to health or safety, or other undesirable and unintended consequences NEPA 9

Title I Section 101 Preserve important historic, cultural, and natural aspects of our national heritage . . . and maintain . . . an environment that supports diversity, and variety of individual choices NEPA 10

Title I Section 101 Achieve a balance between population and resource use that will permit high standards of living and a wide sharing of life’s amenities Enhance the quality of renewable resources and approach the maximum attainable recycling of depletable resources NEPA 11

Title I Section 102 Section 102 contains NEPA’s “action-forcing” provisions, which direct all agencies of the Federal Government to consider environmental impact prior to any recommendation; proposal for legislation; or proposed action, planning, or decisionmaking. NEPA 12

Title II Section 202 created the CEQ, whose members are appointed by the President and approved by the Senate. NEPA 13

Title II The duties and functions of the CEQ are: Assist and advise the President on environmental matters Gather, analyze, and interpret information concerning the quality of the environment Review and appraise Federal Government programs and activities NEPA 14

Title II Develop and recommend to the President national policies to improve environmental quality Conduct investigations, studies, surveys, research, and analyses relating to ecological systems and environmental quality NEPA 15

Title II Document and define changes in the natural environment Report to the President on the state and condition of the environment Make and furnish to the President studies, reports, and recommendations regarding policy and legislation NEPA 16

DOE NEPA Tools Secretarial Policy Statement on NEPA DOE Order 451.1A, NEPA Compliance Program Effective Public Participation Under NEPA The NEPA Compliance Guide, Volumes I and II Guidance on an Environmental Impact Statement Summary NEPA

Secretarial Policy Statement on NEPA Issued June 1994 Noted DOE must comply with letter and spirit of NEPA Delegated to Field Offices authority for EA’s, FONSI’s Delegated to PSO’s authority to approve implementation plans for EIS’s NEPA

Secretarial Policy Statement on NEPA Establishes policy of: Concurrent, rather than sequential, reviews of NEPA documents CERCLA documentation will include NEPA values DOE opportunity to integrate the NEPA and CERCLA processes for specific proposed actions NEPA

DOE Order 451.1A Issued June 1997 Objective: To establish DOE internal requirements and responsibilities for implementing NEPA. Goal: To establish requirements and responsibilities to ensure efficient and effective implementation of DOE’s NEPA responsibilities through teamwork. NEPA 17

DOE Order 451.1A Goal (cont.): A key responsibility for all participants is to control the cost and time for the NEPA process while maintaining its quality. The Role of Contractors: Although contractors may assist in the Department’s NEPA implementation, the legal obligation to comply with NEPA belongs to DOE. NEPA 17

DOE Order 451.1A The Order articulates the requirements for DOE’s NEPA Compliance Program, including: A system of DOE NEPA Compliance Officers. NEPA quality assurance plans and public participation plans. NEPA 17

DOE Order 451.1A Identification of a DOE NEPA Document Manager for each environmental impact statement and environmental assessment. A system for reporting lessons learned and encouraging continuous improvement. NEPA 17

DOE Order 451.1A The Order also identifies the responsibilities for each Secretarial Officer and the Heads of Field Organizations, including: Establishment of a NEPA compliance program and use of the NEPA process early in project and program planning to consider environmental factors along with other relevant information. NEPA 17

DOE Order 451.1A Insurance that internal scoping procedures, a quality assurance plan and a public participation plan are prepared for the office. Inclusion in new contracts and grants a provision that the awardee may not undertake on DOE’s behalf an action that is subject to NEPA until DOE has notified the awardee that DOE has satisfied applicable NEPA requirements. NEPA 17

DOE Order 451.1A Incorporation of NEPA milestones in project planning documents. Submittal of an annual NEPA planning summary to the Assistant Secretary for Environment, Safety and Health by January 31 of each year and making it available to the public. NEPA 17

DOE Order 451.1A The Order also articulates the responsibilities of the NEPA Compliance Officer, NEPA Document Manager, and the Office of NEPA Policy and Assistance. NEPA 17

Effective Public Participation Under NEPA Issued August 1998 Known as “the Gold Book” Provides guidance to programs executing NEPA responsibilities Outlines DOE’s policy for involving the public effectively and meaningfully in DOE’s NEPA processes NEPA

Effective Public Participation Under NEPA Goals: Actively seek and consider public comments Incorporate the views of stakeholders in making decisions Inform the public in a timely manner Empower the public to participate in DOE’s decision making processes Incorporate credible, effective public participation processes into DOE NEPA

Effective Public Participation Under NEPA Defines public participation as “an open, ongoing, two-way communication, both formal and informal, between DOE and its stakeholders” NEPA

NEPA Tools NEPA tools can be found on the Internet at: http://tis-nt.eh.doe.gov/nepa/tools/tools.htm NEPA

NEPA Compliance Environmental review planning is: An integral part of an integrated environmental compliance planning strategy Should be considered early in the planning process NEPA 26

NEPA Compliance Integrated environmental compliance: Avoids or minimizes environmentally related delayed construction starts Avoids or minimizes premature commitment of project resources NEPA 27

NEPA Compliance Allows for stepwise, progressive decisionmaking Avoids prejudicing the NEPA review Will likely facilitate subsequent permitting processes through its early EIS preparation effort GOAL! NEPA 28

NEPA Documentation The NEPA processes and documents required by CEQ regulations and DOE NEPA guidelines are as follows: Categorical Exclusion (CX) EA EIS NEPA GUIDELINES NEPA

Categorical Exclusion A CX: Is a category of actions that individually or cumulatively have no significant effect on the quality of the human environment Does not require an EA or EIS and documentation does not need to be submitted when a CX is applied NEPA 34

Categorical Exclusion 10 CFR 1021 includes guidance on levels of NEPA documentation Examples of actions that can be categorically excluded are in Tables 1-1 and 1-2 NEPA

Categorical Exclusions Examples of EM Categorical Exclusions CERCLA removals Waste sorting, characterizing, overpacking facility (not HLW) Modifications for waste minimization/reuse of materials NEPA

Environmental Assessment An EA has three functions: To determine whether a proposed action requires an EIS To aid an agency’s compliance with NEPA when an EIS is not necessary To facilitate preparation of an EIS when necessary NEPA 36

Environmental Assessment CEQ regulations state that an EA should briefly discuss: The need for the proposal The environmental impacts of the proposed action and alternatives A listing of agencies and persons consulted Alternatives as required by NEPA Section 102(2)(E) NEPA 37

NEPA Documentation 10 CFR 1021 includes guidance on levels of NEPA documentation Examples of actions normally requiring an EA (but not an EIS) are in Table 1-3 NEPA

Actions Requiring an EA Examples of EM EA actions Siting/construction/operation of water treatment facilities Siting/construction/operations of R&D/ non-hazardous waste incinerators Siting/construction/operation of on-site waste storage facilities (not HLW) NEPA

Finding of No Significant Impact A FONSI explains why an action will not have significant effects on the human environment, and therefore will not require an EIS The public must be notified that a FONSI has been issued A FONSI or proposed FONSI with effects of national concern must be published in the Federal Register NEPA 38

Finding of No Significant Impact The FONSI does not have a strictly defined format, but generally should include: A summary of the proposed action Availability - how to obtain the EA Contact name for additional information Proposed action - brief description NEPA 39

Finding of No Significant Impact Background information Environmental impacts Alternatives considered Determination of the finding NEPA 40

NEPA Documentation 10 CFR 1021 includes guidance on levels of NEPA documentation Examples of actions normally requiring an EIS are in Table 1-4 NEPA

Actions Requiring an EIS Examples of EM EIS actions Decommissioning of uranium enrichment facilities Decommissioning of reactors Decommissioning of nuclear fuel reprocessing facilities NEPA

Actions Requiring an EIS Examples of EM EIS Actions (cont.) Siting/construction/operation of a major HLW treatment, storage, disposal facilities Siting/construction/operation of waste disposal facility for TRU waste Siting/construction/operation of incinerators (other than R&D or non-hazardous waste) NEPA

TSCA Incinerator at Oak Ridge NEPA

Scoping Scoping is a process that solicits public input to the EIS process to ensure that: Issues are identified early and properly studied Insignificant issues do not consume time and effort The draft EIS is thorough and balanced NEPA 41

Notice of Intent An NOI is published in the Federal Register to let the public know that an EIS will be prepared. This publication initiates: At a minimum, the 30-day public comment period The EIS process NEPA 42

Notice of Intent An NOI should include: A description of the proposed action and possible alternatives The DOE’s proposed scoping process The name and address of a DOE contact person NEPA 43

Environmental Impact Statement The EIS ensures that the policies and goals defined in NEPA are introduced into the programs and actions of the Federal Government The EIS is to be used by Federal officials (with other relevant material) to plan actions and make decisions NEPA 47

Environmental Impact Statement An EIS should include the following: Cover sheet Summary Table of Contents Purpose of and need for action Alternatives (including proposed action) Affected environment NEPA 48

Environmental Impact Statement Environmental impacts (effects) List of preparers List of agencies, organizations, and persons to whom copies of the statement are sent Appendices (if any) NEPA 49

Environmental Impact Statement The EIS ensures that the policies and goals defined in NEPA are introduced into the programs and actions of the Federal Government The EIS is to be used by Federal officials (with other relevant material) to plan actions and make decisions NEPA

NEPA Document Distribution Distribution procedures for any NEPA document must be decided on a case-by-case basis taking into consideration: The nature of the action The extent of public interest NEPA 50

Notice of Availability The Environmental Protection Agency (EPA) publishes in the Federal Register a weekly NOA of Draft EISs filed during the previous week This notice begins the review period for an EIS NEPA 51

Public Hearings The CEQ guidance for public hearings is found in 40 CFR 1506.6, which states that an agency shall hold or sponsor public meetings or hearings whenever appropriate or required by statute. NEPA 52

Record of Decision A ROD is published in the Federal Register. It: States the decision by the DOE Identifies all alternatives considered Specifies the alternative(s) considered to be environmentally preferable States whether all practical means to avoid or minimize environmental harm from the alternative(s) selected have been adopted NEPA 53

Supplements Supplements to draft or final EISs are prepared if there are: Substantial changes made in the proposed action relevant to environmental concerns Significant new circumstances or information affecting the proposed action or its impacts relevant to environmental concerns NEPA 54

NEPA Integration With Other Laws and Regulations The CEQ regulations state that agencies shall integrate NEPA requirements with other planning and environmental review procedures required by law so that the procedures run concurrently rather than consecutively. NEPA

NEPA Integration With Other Laws and Regulations Once the applicable environmental regulations have been identified, one must: Affirm the applicability of specific environmental regulations Assist in understanding the implementing regulations Determine the activities required for compliance NEPA

NEPA Integration With Other Laws and Regulations Determine the sequence and timing of activities Determine the relationship of the regulations to the NEPA process Identify other environmental documents that might be needed or should be coordinated with the NEPA document NEPA

NEPA Integration With Other Laws and Regulations Identify agency coordination requirements Identify restrictions that have the potential for delaying or halting the project Determine the approximate time required for compliance Identify the regulatory/consulting agency NEPA

Review Questions 1. Your site is contemplating building a pilot-scale waste treatment facility (which appears on the “categorically excluded” list). What level of NEPA documentation is required? a. Action Description Memorandum b. Environmental Assessment c. Finding of No Significant Impact d. Environmental Impact Statement e. None of the above NEPA

Review Questions 2. The National Environmental Policy Act (NEPA) accomplishes its objectives by ensuring an EIS is prepared before conducting major Federal actions. a. True b. False NEPA

Review Questions 3. A Record of Decision for an EM Environmental Impact Statement: a. Justifies DOE's previous decision to select the "Preferred Alternative". b. Documents responses to comments received from stakeholders on the draft EIS. c. Documents the decision on EM's proposed major proposed federal action. NEPA