NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 30 TO MAY 1, FRANKFORT, KY 1 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013.

Slides:



Advertisements
Similar presentations
INDOT Height Modernization Project Ryan C. Swingley, PLS Andrew D. Baxter, PLS.
Advertisements

1 Michigan HMOD Update Shawn Roy 2014 HMOD National Meeting NOAA Gulf of Mexico Disaster Response Center April 30, 2014 Mobile, AL.
“The Case for Continuing and Strengthening NDGPS in Louisiana” Roy K. Dokka, Ph.D. Center for GeoInformatics and Louisiana Spatial Reference Center Louisiana.
Geodetic, ISPLS, HARN Framework Workgroup/Committee Tie Card Project Lorraine Wright INGISI representative.
NGS Updates MARTI IKEHARA, Geodetic Advisor CLSA Monterey Chapter June 2011.
Arizona Height Modernization Program - AZHMP
Geodetic Control Framework Theme 6 th of the CA Core Framework Themes Marti Ikehara Geodetic Advisor for California NOAA’s National Geodetic Survey Sacramento,
Alabama Height Modernization Project, NAD 83(2011), and GEOID 12 in Alabama Overview of Height Modernization Project Overview of Height Modernization.
Mission Statement SC Height Modernization Status In the NGS Database (Height Mod Project) In progress Proposed.
LINDA MORGAN PRINCIPAL CONSULTANT – SPATIAL POSITIONING WESTERN AUSTRALIA SURVEYING CONFERENCE 2013 Geodetic Stuff You Need to Know: Datums, Standards.
Ohio Height Modernization Related Activities Great Lakes Regional Forum Sept 24-25, 2008 Madison, Wisconsin David Conner Geodetic Advisor to the State.
2015 Height Modernization Partner Meeting April 14, 2015.
Better Positions and Improved Access to the National Spatial Reference System  Multi-Year CORS Solution  National Adjustment of 2011  New NGS Datasheet.
Refinements to the North American Datum of 1983 Multi-Year CORS Solution and the National Adjustment of 2011 Dr. Neil D. Weston Chief, Spatial Reference.
The Wisconsin Maps PowerPoint Created by Rozalynn M. Klaas, UW-Madison Applied Population LabRozalynn M. Klaas In cooperation with Bethany Laursen, UW-Extension’s.
How GIS and Land Surveying at Created by: Riley Lindsay Created by: Riley Lindsay can help local government?
Criteria for Cross-Jurisdictional Sharing in Public Health Perspectives from a literature review, health officers interviews and policymakers discussion.
Education for Height Modernization Dr. Stacey D. Lyle, RPLS.
Illinois Height Modernization Sheena K. Beaverson.
NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 29 to 30 MOBILE, AL 1 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2014.
1 Using CORS and OPUS for Positioning Richard Snay NOAA’s National Geodetic Survey GIS-T Charleston, West Virginia April 14, 2010.
1  Wisconsin Height Modernization Program (HMP) Update  WisDOT Survey Equipment Information  Central Office Survey Equipment Inventory Jacob J. Rockweiler,
Streamgage Datum Conversion Great Lakes Region Height Modernization Consortium meeting New Cumberland, PA April 13, 2011.
The Great Lakes Region Height Modernization Consortium Diane Arendt, Chair.
Illinois Height Modernization Program Sheena K. Beaverson Illinois State Geological Survey.
Streamgage Datum Conversion Eastern Region Height Modernization Consortium Webinar March 4, 2014 Jim Kolva, USGS, Office of Surface Water.
Mission Statement SC Height Modernization Status In the NGS Database (Height Mod Project) In progress Proposed.
1 Applications of the CORS System Richard Snay & Giovanni Sella National Geodetic Survey National Ocean Service, NOAA NOAA GNSS Workshop Boulder, Colorado.
A New & Improved National Spatial Reference System Refinements of the North American Datum of 1983 through the Multi-Year CORS Solution and the National.
WLIA March Evolution in National Data Sharing Richard Vraga Wisconsin & Illinois State Liaison U.S. Geological Survey Madison, WI.
Presented to the Land Records Council Intent: In accordance with Section (3m) create a Land Information Council of not less than eight members.
Great Lakes Regional Height Modernization Meeting March 23, 2010 Height Modernization in Indiana Who we are How we got here Thomas A. Mahon, LS.
A program within NOAA's National Geodetic Survey (NGS) that provides accurate height information by integrating Global Positioning System (GPS) technology.
National Height Modernization Program Overview January 24, 2006 Juliana Blackwell Height Modernization Program Manager.
Wisconsin Between 1998 and 2005, the State of Wisconsin invested over $6.5M to the Wisconsin Height Modernization Plan (WI-HMP), using a combination of.
1 “MIDOT CORS UPDATE” Shawn Roy – MIDOT MSRN Administrator Great Lakes Region Height Modernization Consortium Meeting MDOT Horatio S. Earle Training Center.
2010 Hydrographic Services Review Panel David Steele, PLS DNR Geodetic Survey Director & Spatial Reference Center of Washington.
Height Modernization Making the Most of the Indiana HARN and the INDOT CORS March 14, 2007 By William A. Schmidt, PE, LS Manager of Aerial Engineering,
Coastal Zone 2011 Conference “Cool Geodetic Resources For Your Project” A National Ocean Service, NOAA, Presentation 1)TOOLS TO OBTAIN GEODETIC CONTROL.
Requirements of a Network  Good working relationship with IT  Secure location for antenna and receiver  Uninterrupted power  Capability to log on.
 Current Network  Web Sites State Geodetic Control Archive Server  Funding  Current Height Mod Activities KYAPED Workshops  Future Height Mod Plans.
Aerial Surveying & Mapping Section Florida Department of TRANSPORTATION Surveying & Mapping Office Brett C. Wood, PSM Aerial Mapping Manager Florida Department.
National Geodetic Survey – Continuously Operating Reference Stations & Online Positioning User Service (CORS & OPUS) William Stone Southwest Region (UT,
WLIA Emergency Management Task Force. Introduction ► Video Presentation ► Purpose ► History  How EMTF was started  11 meetings in 13 months ► Tasks.
The Importance of Accurate Elevations & Case Studies Edward Carlson Pacific Region Geodetic Advisor National Geodetic Survey (808)
MISSISSIPPI HEIGHT MODERNIZATION PROJECT JUNE 11, 2009 By Ronnie L. Taylor Chief, Geodetic Advisor Branch NOAA, National Geodetic Survey.
The INDOT CORS Indiana GIS Conference February 19, 2008 By William A. Schmidt, PE, LS Manager of Aerial Engineering, INDOT Thomas A. Mahon, PE, LS Survey.
2015 International Great Lakes Datum Height Modernization Project Dave Rigney NGS Geodetic Advisor Michigan Great Lakes Region Height.
NOAA’s CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES Updating the International Great Lakes Datum Laura Rear McLaughlin Center for Operational.
Height Modernization in the U.S.: Implementing a Vertical Datum Referenced to a Gravimetric Geoid Model Renee Shields National Geodetic Survey, U.S.A.
Presented By: Jason Grueneberg President of the Wisconsin Land Information Association Planner/Land Information Officer, Wood County Planning & Zoning.
WIGICC’s Role In Wisconsin - The Wisconsin Geographic Information Coordination Council’s Work Throughout Wisconsin’s Diverse Geographic Community Prepared.
Community-Academic Aging Research Network CAARN Jill Ballard, MPH, CHES September 2011.
Height Modernization Activities at NGS Christine Gallagher National Partner Meeting April 30, 2014.
GREAT LAKES REGION HEIGHT MODERNIZATION CONSORTIUM NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 14, 2015.
National Height Modernization Program Strategic Plan Renee Shields, Height Modernization Program Manager.
Geodetic Applications of GNSS within the United States Dr. Gerald L. Mader National Geodetic Survey NOS/NOAA Silver Spring, Maryland USA Munich Satellite.
Arizona Height Modernization Program - AZHMP Dave Minkel NGS Geodetic Advisor to Arizona Geospatial Professional Member, APLS Dave Minkel NGS Geodetic.
Wisconsin Height Modernization Program Scope, Status, and Future Diane Arendt Wisconsin Department of Transportation Height Modernization Partner Meeting.
National Height Modernization Eastern Regional Meeting March 4, 2014 Continuously Operating Reference Stations (CORS) Neil D. Weston National Geodetic.
Height Mod in Kentucky Height Modernization Forum Flint, Michigan January 26, 2006 Ross Mackay Kentucky Geodetic Advisor.
WESTERN REGION HEIGHT MOD WEBINAR NOVEMBER 19,
Nic Donnelly – Geodetic Data Analyst 5 March 2008 Vertical Datum Issues in New Zealand.
Welcome to the Great Lakes Regional Height Modernization Consortium: Real Time Network Workshop Illinois State Geological Survey Institute for Natural.
October 24, 2005 Silver Spring, Maryland MinnesotaDixon Hoyle MichiganDave Rigney Illinois Chris Pearson Ohio Dave Conner KentuckyRoss Mackay Convocation.
Geodetic Control and Datums Where is it? How Accurately can we map it?
Colorado Height Modernization Forum Zelda LeCoat Zelda LeCoat.
National Height Modernization Partner Meeting Neil D. Weston National Geodetic Survey, NOS, NOAA Frankfort, Kentucky April 30 – May 1, 2013.
Criteria for Cross-Jurisdictional Sharing in Public Health
Long-Term Power Outage Regional Planning Workshop
Presentation transcript:

NATIONAL HEIGHT MODERNIZATION PARTNER MEETING APRIL 30 TO MAY 1, FRANKFORT, KY 1 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013

2 TO PROVIDE REAL-TIME, SUB 2 CM-HORIZONTAL AND VERTICAL POSITIONING STATEWIDE TWO RELIABLE, INDEPENDENT NETWORKS ARE NECESSARY TO MAKE THIS ACCURACY POSSIBLE. THE PASSIVE NETWORK IS THE GEODETIC CONTROL MONUMENTS AND THE ACTIVE NETWORK IS WISCORS

3 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 COMPLETED THE ORIGNAL HARN IN 1991 USING 80 STATIONS AT 50 Km SPACING STARTED REMONUMENTING THE STATE IN 1999 FIRST ZONE OF 24 WISCORS STATIONS CAME ONLINE IN 2008 WITH 200 REGISTERED USERS

4 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 Fiscal Year NOAA GrantState Match 2002$425,000$330, $400,000$465, $2,661,666$750, $2,661,273$700, $2,649,747$382, $1,200,000$300, $300,000$200, $2,147,900$200, $999,000$493, $0$495, $0$1,550, $0$700,000 Total$13,444,586$6,565,804 FROM 1998 TO 2001 THE STATE PROVIDED APPROXIMATELY $2 MILLION IN FUNDING 2009 AND 2010 GRANTS WILL BE CLOSING DECEMBER 31, 2013

5 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 THE DEPARTMENT IS AGAIN CONSIDERING IMPLEMENTING A NOMINAL RECOVERY FEE TO OFFSET OPERATIONAL COSTS

6 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 WINTER BRUCE CHETEK CLAYTON HUDSON KNAPP CHIPPEWA FALLS LIMA OSSEO ARCADIA LA CROSSE

7 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 PHASE 7C & 8B DOUGLAS, BAYFIELD, ASHLAND, IRON, VILAS, ONEIDA AND LINCOLN COUNTIES

8 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING MONUMENTS LEFT TO CONSTRUCT IN THE NORTHEAST WORKING THROUGH TRIBAL LEGISLATION IN MENOMINEE COUNTY

9 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 SUPERIOR IRON RIVER DANBURY MINONG SAND LAKE HAUGEN SIREN (MNCORS)

10 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 GPS AND LEVELING CAMPAIGNS SCHEDULED FOR PHASE 8C IRON, VILAS, ONEIDA, LINCOLN, LANGLADE AND MARATHON COUNTIES

11 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING cm SHIFT PRIMARILY TO THE EAST PURPOSE WAS TO MAINTAIN CONSISTENCY WITH THE NATIONAL NETWORK TO BE USED WITH THE MOST CURRENT GLOBAL REFERENCE FRAME – IGS08

12 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 PUBLISHED BENCHMARKS AND WATER GAUGE STATIONS HAD MISCLOSURE 221 COASTLINE, WATER GAUGE STATIONS AND NEIGHBORING STATE BENCHMARKS WERE CONSTRAINED RESULTED IN GEOID MODEL 12A

13 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 CATASTROPHIC DESTRUCTION OF MONROE AIRPORT TERMINAL THE STATION WILL BE OPERATING DURING THE AIRPORT CONSTRUCTION PROJECT

14 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 WISDOT REPLACEMENT DOCUMENT OUTLINING ROLES AND RESPONSIBILITIES FOR REESTABLISHMENT OF GEODETIC CONTROL STATIONS DESTROYED BY WISDOT CONSTRUCTION PROJECTS

15 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 TO REPORT AN ISSUE WITH A MONUMENT PLEASE CALL OR PLEASE INCLUDE THE COUNTY, THE HIGHWAY OR ROAD THE MONUMENT IS LOCATED ON, THE DESIGNATION STAMPED ON THE DISC, A BRIEF DESCRIPTION OF THE ISSUE HAPPENING AT THE MONUMENT SITE AND A CALL BACK NUMBER

16 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 PURSUING LICENSING TO BE ABLE TO INCLUDE 10 STATIONS FROM IOWA, MICHIGAN AND MINNESOTA IN THE WISCORS NETWORK

NATIONAL GEODETIC SURVEY STATE CARTOGRAPHERS OFFICE SHAPE AND TEXT FILES AVAILABLE COUNTY MAPS IN.pdf FORMAT REFERENCE DATA FOR POST PROCESSING 17 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013

18 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 GIOVANNI SELLA, PhD. NATIONAL CORS PROGRAM MANAGER CHUCK DEMETS, PhD. PROFESSOR OF GEOLOGY UW - MADISON

19 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013 WSLS ANNUAL INSTITUTE WISDOT SURVEY WORKSHOP CORN/SOY EXPO WLIA ANNUAL CONFERENCE WISDOT REGIONAL UTILITY CONFERENCES WISDOT AERONAUTICS CONFERENCE DIGGER’S HOTLINE SAFETY MEETINGS MINNESOTA SURVEY TECHNICAL WORKSHOP FARM TECHNOLOGY DAYS WISCONSIN COUNTY SURVEYORS ASSOCIATION GREAT LAKES REGION HEIGHT MODERNIZATION CONSORTIUM WIGICC – ELEVATION WORKGROUP UW GIS DAY

20 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING

21 NATIONAL HEIGHT MODERNIZATION PARTNER MEETING 2013