UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.

Slides:



Advertisements
Similar presentations
NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 April 2010.
Advertisements

NTS Exit Capacity - Amending the DN Adjustment Window Transmission Workstream, 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Exit Reform Review Transmission Workstream 07 January 2010.
Enduring Offtake Arrangements including an Off-Peak Interruptible Service Peter Bolitho.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Review of Offtake Arrangements Document Section I - NTS Operational Flows 9 th July 2010 – Offtake Arrangements Workstream.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Enduring NTS Offtake Arrangements Transmission Workstream 5th September 2006.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod 166 Review Group Incremental Exit Capacity at New and Existing Exit Points.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Demand Side Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
UNC0376A - Increased Choice when applying for NTS Exit Capacity – User Pays initial thoughts Review Group August 2010 Transmission Workstream 01.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transitional Exit Capacity Proposals -Update Offtake Agreement Workstream, 30 Nov 05 Dave Adlam.
Transfers and Trades Special Transmission Workstream
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Alternative Approach to Enduring Exit Flat Capacity & Revenue Recovery Gas TCMF 14 th December 2006.
Mod 376: Increased Choice when Applying for Enduring NTS Exit Capacity Jeff Chandler - 5 th May 2011 Transmission Workgroup - Elexon 1.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transitional offtake arrangements – Ofgem Initial Proposals on transitional incentives 6 October 2005.
Transitional Exit Capacity Proposals -Update
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
Exit Capacity Release Methodology Statement
Entry Capacity Overrun price calculation
Exit Capacity User Commitment – Transmission Workstream update
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
Exit Overruns in the Enduring Regime - draft MOD principles
PARCA Security and Termination Amounts
7th July 2011 Transmission Workgroup - Elexon
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Jeff Chandler - 3rd October 2013 UNC Tx Workgroup
MOD Deemed applications – User pays initial thoughts.
Transmission Workstream – Partial Assignment
UNC Transmission Workstream 7th December 2006
Wales & West Utilities Mod 0671 User Commitment
Proposed Transitional Gas Exit Arrangements
Flat, flex, assured pressures Network Development Statement
Information Provision for Transitional Exit Capacity
Exit Overruns in the Enduring Regime
Transmission Workstream 05 November 2009
Presentation transcript:

UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006

Bi-Directional Sites – Current arrangements  End of day exit Daily Quantities (DQ) and User allocations (UDQOs) provided to National Grid NTS e.g.  Exit DQ = 10, UDQO User A = 2, UDQO User B= 8  Same process undertaken for end of day entry quantities  End of Day Net Physical measurement provided  National Grid NTS check difference between Exit and Entry measurements equals end of day net physical measurement

Bi-Directional Sites – Proposed Enduring Arrangements  Existing end of day processes continues for entry and exit  Step 1. Flex Overruns only calculated if cumulative net exit physical flow over first 16 hours  Step 2. Cumulate flow over 06:00 to 22:00 Exit Daily Quantity (DQ 22:00 ) and User allocations (UDDQ 22:00 ) provided to National Grid NTS e.g.  Exit DQ 22:00 = 6, UDDQ 22:00 User A = 1, UDDQ 22:00 User B = 5  DQ 22:00 must be no less than the cumulative net exit physical flow at 22:00  Step 3. User exit allocations (UDQO and UDDQ 22:00 ) utilised in Flex Overrun calculation

Negative Flex Flow Example End of Day Measurement = User has 0 Flexibility holding and -160 Flexibility Utilisation. Overrun = -160 – 0 = -160 = NO Flexibility Overrun User has 0 Flex Holding, if they wish to Flow an “anti-diurnal” profile no Requirement to purchase Flexibility 290

Negative Flex Flow Example End of Day Measurement = User must flow less than or equal to 4640 at to ensure that no Flexibility Overrun is incurred Users Flexibility Holding = -160 Users Flex utilised = 4640 – 4800 = —160 = 0 NO Flexibility Overrun User Trades or sells back to NTS 160 units 290

Pressure Commitments – Transitional Arrangements (Mod 046)  Assured Offtake Pressures rolled over from interim to transitional regime  based on 2005 Offtake Capacity Statement  remain at this level until Sept 2010 unless amended as a result of a request  DNOs able to request pressure increase by end of July in conjunction with their capacity requests  National Grid NTS accept/reject pressures and capacity requests by end of September as part of Offtake Capacity Statement

Pressure Commitments - Proposed Enduring Arrangements (Mod 0116)  Assured Offtake Pressures rolled over from transitional to enduring regime  based on Sept 2006 Offtake Capacity Statement  remain at this level unless amended as a result of a request  DNOs able to request (permanent) pressure increase by end of July in conjunction with their capacity requests, but capacity requests via annual flex auctions  National Grid NTS accept/reject pressure increase by end of September as part of Offtake Pressure Statement

Pressure Commitments - Proposed Enduring Arrangements (Mod 0116)  National Grid NTS ability to request (permanent) pressure decreases  requests by end of April  DNO accept/reject by end of July  Ability for National Grid NTS and DNOs to request temporary decreases for a day or days  Accept/reject within 10 days  Common test for acceptance/rejection of any pressure request, based on current arrangements  Safe and efficient operation of Transporter’s network  Obligation to co-operate

New Connections – Current Arrangements  Developer discusses with National Grid NTS its connection requirements through “connection process”  States anticipated capacity requirements  National Grid NTS considers whether requires investment  If so, may seek to agree terms of ARCA and delivery date  ARCA required to be agreed to allow sufficient investment lead rime  Where ARCA agreed, Shippers able to book prevailing rights from relevant month consistent with delivery date through SPA process  Shippers not able to request additional capacity beyond 6 months under UNC via SPA process, irrelevant of whether triggers investment

New Connections – Proposed Enduring Arrangements  Developer discusses with National Grid NTS its connection requirements through “connection process”  Obtain relevant NTS Exit Zone and NTS Exit Area (as defined in ExCR Methodology Statement)  States anticipated capacity requirements  National Grid NTS considers whether requires investment  If so, may seek to agree terms of ARCA and delivery date  ARCA required to be agreed to allow sufficient investment lead rime  Investment lead times will be consistent with obligations agreed as part of the TPCR  Where ARCA agreed, Shippers able to book  for agreed non-Gas Year start dates, daily rights through daily auctions  prevailing annual rights from relevant Gas Year – nominated Shippers deemed to have booked capacity under UNC at relevant Application Window  Also, any User able to request additional flat capacity at Annual Application Window for unconstrained period for use from start of a Gas Year

New Connections – Proposed Enduring Arrangements  Initialisation rules rollover capacity bookings from Transitional to Enduring Arrangements  DNOs based on Sept 2006 Offtake Capacity Statement  Shippers based on Gas Year 2005/06 bookings  Require to clarify in rules that same will apply to any agreed Reserved Capacity through ARCAs  only those under current negotiation and where agreed by implementation of the proposal

NTS/LDZ Operational Flows – Proposed Enduring Arrangements  Reciprocal arrangements provided to DNOs for flow swapping i.e.  DNO’s able to request flow swaps from National Grid NTS in accordance with same rules as under UNC OAD I2.4 for National Grid NTS to request flow swaps from DNOs

Exit Capacity Release Methodology Statement – User Commitment

User Commitment Option 1. Commitment Based on Prevailing Prices  National Grid will accept User applications, subject to appropriate credit checks, made at Annual Application Window in Gas Year Y to increase Prevailing NTS Exit (Flat) Capacity to amount “Q” on basis that  User will pay relevant NTS Exit Capacity charges for amount Q for each Gas Day over the period Gas Year Y+4 to Y+7 (inclusive)  NTS Exit Capacity charges as published in Transportation Statement for relevant Gas Days

User Commitment Option 2. Commitment Based on Prices at time of application  National Grid will accept User applications, subject to appropriate credit checks, made at Annual Application Window in Gas Year Y to increase its Prevailing NTS Exit (Flat) Capacity to an amount “Q” on the basis that the User will:  pay to National Grid at least the User Commitment Amount; and/or  hold the amount Q for each Gas Day over the period Gas Year Y+4 to Y+7 (inclusive)  User Commitment Amount will be determined as follows: User Commitment = P x Q x F x 365, where  P = relevant prevailing NTS Exit Capacity charge at the time of application (p/kWh)  Q = total amount of Prevailing NTS Exit (Flat) Capacity held by the User (kWh)  F = factor of 4