Xenon Detector Status Liquid Xenon Detector Group.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
Liquid Xenon Carlorimetry at the MEG Experiment Satoshi MIHARA Univ. of Tokyo.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
A. Baldini PSI July 04 General Introduction Work done in the past 4 months presented in the individual sub-detectors talks: highlights Construction is.
1 Xenon Detector Xenon Detector Group. 2/22 Contents  Construction Status Cryostat PMT mounts  PMT Pisa PMT test PSI PMT test Trouble report  Neutron.
1 PSI 27/6/2006 C.Bemporad “THE TAMING OF MEG” News on Calibration Methods Cockcroft-Walton Accelerator  -sources on wire  -lines from neutron capture.
Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004.
XEC Hardware Status MEG Review Meeting 2010 Liquid Xenon Group.
Upgrade of liquid xenon gamma-ray detector in MEG experiment Daisuke Kaneko, the University of Tokyo, on behalf of the MEG collaboration MEG EXPERIMENT.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Analysis of PSI beam test R.Sawada 09/Feb/2004 MEG collaboration R.Sawada 09/Feb/2004 MEG collaboration
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
HD target.
MEG DC (report June 04) DC report june_04,J.E. a)Foil stability and quench related problems b)How to get more stability c)Frame design d)Measurement of.
Sheffield : R. Hollingworth, D. Tovey R.A.L. : R.Luscher Development of Micromegas charge readout for two phase Xenon based Dark Matter detectors Contents:
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Possible calibration methods for the final LXe calorimeter A. Papa 01/20/2004.
1 Satoshi Mihara for the   e  collaboration, review meeting at PSI, Jul 2002 Photon Detector Satoshi Mihara ICEPP, Univ. of Tokyo 1.Large Prototype.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
MEG Run 2008 液体キセノンガンマ線検出器 東京大学 素粒子物理国際研究セン ター 西村 康宏、 他 MEG コラボレー ション 2008 年秋季物理学会@山形大学小白川キャンパス.
Techniques for Nuclear and Particle Physics Experiments By W.R. Leo Chapter Eight:
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Current status of MEG Experiment Yasuko HISAMATSU ICEPP, The Univ. of Tokyo ICEPP Symposium.
1 CKOV1 at the MICE Experiment CKOV1 to perform mu/pi id w TOF0/TOF1. Progress since CM16 CKOV1 Fabrication and Installation TOF0 CKOV1 TOF1 EMCAL TOF2.
Possible calibration methods for the final LXe calorimeter A. Papa 02/11/
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CLAS12 Drift Chamber Prototyping
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
PMT Calibration R.Sawada 7/Jan/2007. Time calibration Method was talked at the previous meeting. The problems which was shown before were because I used.
Current status of XMASS experiment 11 th International Workshop on Low Temperature Detectors (LTD-11) Takeda Hall, University of Tokyo, JAPAN 8/1, 2005.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
R&D works on Liquid Xenon Photon Detector for μ  e γ experiment at PSI Satoshi Mihara ICEPP, Univ. of Tokyo Outline Introduction Prototype R&D works Summary.
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
MEG 実験 2009 液体キセノン検出器の性能 II 西村康宏, 他 MEG コラボレーション 東京大学素粒子物理国際研究セン ター 第 65 回年次大会 岡山大学.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Development of UV-sensitive MPPC for upgrade of liquid xenon detector in MEG experiment Daisuke Kaneko, on behalf of the MEG Collaboration µ γ Liquid xenon.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Study of the Radiation Damage of Hamamatsu Silicon Photo Multipliers Wander Baldini Istituto Nazionale di Fisica Nucleare and Universita’ degli Studi di.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
g beam test of the Liquid Xe calorimeter for the MEG experiment
Plans for this week MWPC: wire stretching today
Upgrade activities at Clermont-Ferrand
Liquid Xenon Detector for the MEG Experiment
Upgrade of LXe gamma-ray detector in MEG experiment
Upgrade of LXe gamma-ray detector in MEG experiment
Upgrade of LXe gamma-ray detector in MEG experiment
Upgrade of LXe gamma-ray detector in MEG experiment
Instrumentation for Colliding Beam Physics 2017
Upgrade of LXe gamma-ray detector in MEG experiment
MEG実験の液体Xe検出器について 東大 ICEPP  森研究室 M1 金子大輔.
Development of hybrid photomultiplier for Hyper-Kamiokande
MEG II実験 液体キセノン検出器の建設状況
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
as a prototype for Super c-tau factory
Xenon Detector Hardware
西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 第73回年次大会(2018年) 東京理科大学(野田キャンパス)
Trigger operation during 2007 run
Presentation transcript:

Xenon Detector Status Liquid Xenon Detector Group

Contents PMT R&D  New PMT with double Al strip  New base design with zener diodes  PMT response under the COBRA field Neutron BG measurement  Previous talk Cryostat/PMT holder design Calibration/Monitoring Another CEX beam test at  E5 Schedule

PMT R&D Photocathode New breeder circuit with zener diodes Test under the COBRA magnetic field

Motivation  Under high rate background, PMT output (old Type PMT, R6041Q) reduced by 10-20%.  This output deterioration has a time constant (order of 10min.): Related to the characteristics of photocathode whose surface resistance increases at low temperature.  Rb-Sc-Sb + Mn layer used in R6041Q  Not easy to obtain “high” gain. Need more alkali for higher gain.  Larger fraction of alkali changes the characteristic of PC at low temp. So, New Type PMTs, R9288 (TB series) were tested under high rate background environment.  K-Sc-Sb + Al strip used in R9288  Al strip, instead of Mn layer, to fit with the dynode pattern Confirmed stable output. ( Reported in last BVR) But slight reduction of output in very high rate BG Add more Al Strip Al Strip Pattern  Low surface resistance R9288 ZA series Yasuko HISAMATSUMEG VRVS June 2004

R6041Q (Rb-Sc-Sb w/o Al strip used in LP) Serial # Beam on 83MeV  55MeV  Lab test Test LED with crowing LED (0.8 microA) -105 o C25 o C Only base current shortage effect

Works on Design of PMT Two Issues to be solved: 1.Output deterioration caused by high rate background. (Effects of ambient temperature on Photocathode ) Ans. Reduce Surface Resistance by adding Aluminum Strip Pattern 2. Shortage of Bleeder Circuit Current Ans. Improve Design of the Circuit by adding Zener Diode Delivered from HPK in April Rate Dependence Liq.Xe HPK has started to work on new bleeder circuit design Yasuko HISAMATSUMEG VRVS June 2004

PMT test facility in Pisa Is operating stabily and allows to test PMTs in Lxe with  Alpha sources (QE)  LEDs (high rate test)  Laser light through fiber (stability) Compare each PMT to a reference PMT  Reference PMT fixed. Change test PMT.

PMT fast change mode successfully tested  Linear motion to “dip” PMTs  Gate valve to isolate N 2 /Xe  Allows to test several PMTs/day (5) Alpha-source signal  Anticorrelation in liquid not seen in gas  Purity of Xe? checking Upper Lower SUM

High rate tests In parallel with  -source/purity tests Check on Double-Al-Grid PMTs (unfortunately only 2 samples) NO effect seen at 4  A anodic current at -109°C (1 Atm)  Note: usually Xe kept at -105, 1.3 Atm ZA1985 ZA1980 Crowding ON OFF

I=4  A TB604 ZA1985 ZA1980 Plateau/Peak New 9288 (ZA1980 and ZA1985) compared to TB604 (in Ar gas and LXe)

PMT Rate Dependence Test in Tokyo Xe tank Liq.Xe chamber Purification system PMT Test of Tokyo Yasuko HISAMATSUMEG VRVS June 2004

Set up alpha source LED Chamber Inside PMT Alpha source( 241 Am ) LED Liq. Xe Yasuko HISAMATSUMEG VRVS June 2004

Condition & Procedure alpha source : ~200Hz, LEDpulse height:4000p.e. ~ 7200 p.e./event pulse shape: ~10nsec rate: 500Hz ~ 10KHz Trigger: alpha self trigger (veto by LED driver pulse) Procedure Pedestal Run & Gain calibration using LED Alpha LED OFF Alpha LED ON (LED : high rate background) -Change LED Pulse height, rate and PMT gain Yasuko HISAMATSUMEG VRVS June 2004

ZA1984 Rate Gain 1*10 6 Background:2.16µA 1.26*10 7 p.e./sec 6.91µA 4.05*10 7 p.e./sec ZA1984 Time dependence?  = 4.45 *10 4 sec Stable output up to 2.16µA is confirmed. Slight deterioration(?) of output was observed under very severe background. Yasuko HISAMATSUMEG VRVS June 2004

ZA1984 Rate Current of Crowding LED [ µA] alpha peak ON) / alpha peak OFF) This instability is caused not by photocathode but by the bleeder circuit; Shortage of bleeder current Improved design of the bleeder Circuit; adding Zener Diode Yasuko HISAMATSUMEG VRVS June 2004

Final Design of Bleeder Circuit NEC RD68S NEC RD82S Provide Voltage regulation with Zener Diode Yasuko HISAMATSUMEG VRVS June 2004

Zener Diode NEC RD Series Low noise zener recommended by HPK Plastic package Electrical Characteristic (T=25 o C) Data sheet: TypeZener Volt.[V] MinZener Volt.[V]MaxTemp. Coeff.[mV/ o C] RD68S ~70 RD82S ~83 So tiny.. Yasuko HISAMATSUMEG VRVS June 2004

Electrical temp.  Electrical Characteristics of NEC Zener Diode were measured at room temperature and in liq. N2  Set up: NEC RD68S, 82S. 2 samples for each were tested in liq. N2. Yasuko HISAMATSUMEG VRVS June 2004

Electrical temp. Current [µA] Zener voltage [V] Room Temp.Liq.N2 RD68S RD82S  No damage to the package Can be used in liq.Xe  Sharp voltage drop at zener volt. also at low temp. generate good reference volt.  Zener Voltage decreased by ~13V Reasonable (Temp.Coeff.) Measured by Hiroaki NATORI Yasuko HISAMATSUMEG VRVS June 2004

Conclusion Stable output from R9288 ZA series under the background up to 4  A in PISA PMT test facility Stable output up to 2  A (1.3 *10 7 p.e./sec) was confirmed also in Tokyo PMT test facility Electrical characteristics of Zener diode at low temperature were measured. Confirmed that zener diode can be safely used at low temperature. Start drawing final design of PMT bleeder circuit at HPK Waiting for final PMT prototype from HPK! Yasuko HISAMATSUMEG VRVS June 2004

PMT test under the magnetic field Gain, effective QE of 2 PMTs were measured under the magnetic field. Geometry definition

Setting PMT test box with a PMT and a blue LED COBRA full excitation Isc : 360A, Inc : 320A gain:(1.32±0.03)x10 6 (750V) : TB0585 : (1.73±0.03)x10 6 (750V) : TB0473 PMT LED

TB0585 Magnetic field around LXe position was reduced successfully by compensation coil, less than 40G. Inner FaceOuter Face Side FaceFront Face ○ 90 ° (weak) × 0°(normal) ▲ mag. field

TB0473 ○ 90 ° (weak) × 0°(normal) ▲ mag. field Inner Face Outer Face Side Face Front Face

Gain&Eff.QE under mag. field of 62G Gain can be recovered with higher HV. Effective QE (measured with LED light) is not recovered even when HV changed. The magnetic field in the LXe region is well below 40G (20% loss of effective QE at max). Gain curveEffective QE No magnetic field 62G data

Summary PMT test under the COBRA mag. field  Response of the two sample PMTs was tested under the COBRA magnetic field.  The magnetic field at realistic position of LXe is successfully compensated, less than 40G at all positions, and decrease of PMT output is found to be less than 40%.  Gain can be recovered with higher HV setting.

Cryostat/PMT holder design Cryostat construction PMT holder design Cryogenics system design

Cryostat Design Summary: This document is the specification reference for the builder of the MEG cryostat and it is organized in three main sections: General: 1.1 Introduction. 1.2 Project description. 1.3 Scope of work. Technical Requirements: 2.1 General technical requirements. 2.4 Recommendations for storage. 2.7 Recommendations for cleaning. 2.8 Packing and transportation. 2.9 Mechanical and leakage tests 2.10 Inspection, test and quality control plan. Management Requirements 3.1 Fabrication and control plan. 3.2 List of certificates and documentation required. 3.3 Schedule for construction, test and shipment. 3.4 List of drawing Delivery in Summer 2005 after all tests in a manufacturer

PMT support structure Basic ideas  PMTs are inserted in slabs (inner, side, outer) and plates (front) in a clean condition.  The slabs and plates are assembled into a shape in the cryostat.  Supporting frames for the slabs and plates will be fixed to the cryostat with screws.  Some other equipments will be attached on the supporting frames. Patch panel Temperature sensor Level meter Inner Outer Side Front (up) Front (low) 768 PMTs If we get more, we can put more on the outer side.

Structure of slab/plate SideOuter Front Inner Possible to divide into 6 slabs

Assembling Several technical issues  Easy maintenance  Assembling w/o crane in clean environment  Relative position Mating parts between the support and slab  Through screw holes Main support frames Support for the front

Patch Panel Feedthrough  High density due to limited space on the chimneys. A bundle of cables will be connected to one feedthrough connector. Cabling (grouping of PMTs) are limited due to the slab structure. Grouping of PMTs can be arranged between the patch panel and feedthrough connector. Cold Vessel Patch Panel feedthrough Warm Vessel

Cryogenic System Design

Xenon strage/1000 L Dewar/Purifier Storage tanks ready at PSI 1000 L dewar design completed Purifier on the way to PSI (16/June)

PMT Calibrations Alpha-on-a-wire  Simulation of a wire in the Large Prototype  Simulation of the final calorimeter Neutron generators (AB’s talk in last meeting)  Selective activation (Ni)  Acquiring information on availability/price Photons-from-the-back (AB’s talk in last meeting)  Feasibility study in progress

z x Large prototype: how many sources? 3 sources placed along x (0,±10cm) 1 Wire 50  m thick Search for a no time consuming source ID  Front face average (usual fast method)   2 opposite faces weighted average (the shadow effect is compensated)  Wire shadow: 1.5 MeV “lost”

5 sources in LP 5 sources make a more symmetrical situation (same spacing as PMTs) Identification still possible at more than 3  but worse than 3 sources

No effect on energy resolution We checked the effect of the wire presence on energy resolution at 52.8 MeV Linear fit training with no wire Xe layer in front of the front face PMTs as in the last test

C-shape calorimeter 3 wires with 5 sources each (15 sources total)  50  m wires  2 mm wide alpha deposit on the wires  (0,  7.5,  15 cm) from lateral face to lateral face  Half radial depth   = (0,  35  ) >15 p.e. for d(pmt)<35 cm (5% QE) Easy to identify the wire, a bit more difficult to identify the source (even in MC!!)  Fast ID: front face averages  Exploitation of the linear fit is in progress

Front face averages

Alpha/gamma ID No problem with full reconstruction (MC!!) LP: three or five sources easily distinguishible Final calorimeter: some more work is needed to distinguish all 15 sources. photons Full reconstruction alpha Front face fit

Another CEX beam test at  E5 DAQ using almost final electronics/software  Wave-form digitizer  Software framework Investigate Al-grid PMT performance Gain experience for using  - beam at  E5 (and hydrogen target)

Schedule Test Milestone AssemblyDesignManufacturing Large PrototypeBeam Test Cryostat Vessel PMT Refrigerator Liq. Purification Assembly Test Engineering runs Heater replaced Neutron background measurement Base circuit design must be finalized Crane problem Neutron Shield?

Schedule in 2004 LPT Neutr. BG PM + Src Inst Pi- Beam Test Liq. Purif. Full Calor imete r Jun/2004Jul/2004Aug/2004Sep/2004Oct/2004Nov/2004Dec/2004 Neutron background measurement using LP in June, July Two Problems during start-up in June  Getter (xenon purifier) problem (triac error)  control board must be changed  refrigerator problem (He leakage)  Replaced to the final refrigerator which will be ready soon. PMT replacement and installation of a calibration wire (several active spots on a 100um wire.) is planned in Aug. Another CEX beam test is planned in Sep/Oct  Wave-form digitizer and new PMTs (at least on the front face) Liquid phase purifier test on LP will be performed in Nov/Dec In 2005 LP chamber will be used for PMT test/calibration Construction

Schedule in 2005 LPT PMT testing + calibration Full Calorimeter Cryo. Installation Crane+TentCrane+Tent Assembly Studies (Wed + remote) Test Jan-Mar Apr MayJunJulAugSepOctNovDecJan Jan-Mar/2005Equipment installation (cryogenics, xe strage tank…) Aug-Sep/2005PMT assembly in the cryostat Oct-Dec/2005Operation test under the magnetic field will continue