Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth.

Slides:



Advertisements
Similar presentations
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
Advertisements

Study of Large-area GEM Detectors for a Forward Tracker at a Future Electron-Ion Collider Experiment Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
KLOE II Inner Tracker - FEE Status Antonio Ranieri RD51 Collaboration Meeting Paris October 2008 INFN-Bari S ervizio E lettronico L aboratori F rascati.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
CMS GEM Workshop III, April 20, 2012
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher Cross Talk issues with APV25 Electronics Uniformity.
D. Peterson, “The Cornell/Purdue TPC”, ALCPG, Snowmass, 23-August The Cornell/Purdue TPC Information available at the web site:
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
INFN GEM Front Tracker 2012 Oct 18 / SBS Coll. / JLabE. Cisbani1 V. Bellini, M. Capogni, E. Cisbani, S. Colilli, F. Giuliani, M. Gricia, F. Librizzi, M.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
1 July GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2013 – Feb – 20 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
New Developments in Large Area THGEMs & APV Exercise INFN – Sezione di Trieste Carlos Alexandre Fernandes dos Santos 11/December/2014.
Update on APV25-SRS Electronics Kondo Gnanvo. Outline Various SRS Electronics Status of the APV25-SRS UVa Test of the SRU with multiple.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
GEM chambers for SoLID Nilanga Liyanage University of Virginia
Study of Large-area GEM Detectors for a Forward Tracker at a Future Electron-Ion Collider Experiment Aiwu Zhang, Vallary Bhopatkar, Marcus Hohlmann Florida.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Statement of Interest in CMS MPGD High-  Muon Upgrade Florida Tech CMS Muon Group Marcus Hohlmann Florida Institute of Technology, Melbourne, FL, USA.
GEM R&D Update Kondo Gnanvo. Outline  GEM R&D and assembly facilities at UVa  Cosmic test results  Update on the 40 × 50 cm 2 GEM prototype  Plans.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
JLab 22/Jan/2010 SBS - Review E. Cisbani / SBS Trackers 1 Concepts and Status of the GEM trackers Evaristo Cisbani / INFN-Rome Sanità Group SBS - Review.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Kondo GNANVO University of Virginia (UVa) Update on GEM Activities for the 12 GeV Program in Hall A at JLab.
News on GEM Readout with the SRS, DATE & AMORE
Front GEM Chambers Design concepts –Foils –Mechanics Electronics and DAQ Performance Current activity and plan Evaristo Cisbani / INFN-Rome Sanità group.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
GEM Detector R&D at Florida Tech – “Get to know each other” –
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
 The zigzag readout board is divided into eight η-sectors; each sector has a length of ~12 cm and comprises 128 zigzag strips; zigzag strips run in radial.
Large-Area GEM Detector Development at CMS, RD51, and Fl. Tech – A brief overview – Marcus Hohlmann Florida Institute of Technology, Melbourne, FL PHENIX.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Uva GEM R&D Update –Part I Kondo Gnanvo, Nilanga Liyanage, Vladimir Nelyubin, Kiadtisak Saenboonruang, Taylor Scholz and Adarsh Ramakrishnan In Collaboration.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
F. Murtas CERN-INFN Frascati December 2 th 2013 – He3 free detectors Italy Workshop 1 Front End Electronics for GEM detector  Neutron detectors and GEM.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
Section N4A4 Gaseous Detectors: R&D II.
Electronics for GEM R&D at the University of Virginia
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
On behalf of the GEMs for CMS Collaboration
News on second coordinate readout
Status of the Front Tracker GEM
Mirco Christmann MAGIX Collaboration Meeting 2017
Physics program in Hall A for the CEBAF 12 GeV era
Presentation transcript:

Nilanga Liyanage University of Virginia UVa GEM Team Dr. Kondo Gnanvo, Dr. Vladimir Nelyubin, Kiadtisak Saenboonruang, Chao Gu, Xinzhan Bai, Jie Liu, Seth Schcher, Taylor Scholz

Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm and 50 cm x 50 cm Modules are assembled to form larger chambers with different sizes  Front tracker: Six 40 cm x 150 cm GEM layers  built in Italy – INFN  Polarimeter trackers: Eight 50 cm x 200 cm GEM layers  to be built in Virginia 2 40 modules At UVa GEM module production starting now Total Area ~ 16 m 2 SuperBigbite GEM Trackers

4 GEMs with APV25- front end for card seach of the 8 Polarimeter chambers New design for the SBS GEMmodules for polarimeter trackers by Kondo Gnanvo Need 32 modules + 8 spares

Setup and instrumented the GEM lab Constructed two 40 cm x 50 cm prototypes based in the Rome design First chamber under testing now. Kondo finalized the new design based on lessons learned. Progress so far

5 N 2 HV Test Box Pico-ammeter Storage Shelves Stretching Device Display Monitor Storage Cabinet Ultrasonic bath Our Class 1000 Clean Room (3.5 × 3 m 2 ) Built originally for the BigBite drift chambers construction Located in a large (4.5 m x 9 m) semi-clean area. Additional clean room to be added later this year UVa GEM Lab Mechanical stretching device HV Test N2 Gas box Keithley Picoammeter 6487 with 500 V source  Ohmmeter Ultrasonic bath (Elmasonic S900H ) APV25 based readout systems with 5000 channels for testing GEMs Wiener MPOD High Voltage system

6 N 2 HV Test Box Pico-ammeter Storage Shelves Stretching Device Display Monitor Storage Cabinet Ultrasonic bath Our Class 1000 Clean Room (3.5 × 3 m 2 ) Built originally for the BigBite drift chambers construction UVa GEM Lab Mechanical stretching device HV Test N2 Gas box Keithley Picoammeter 6487 with 500 V source  Ohmmeter Ultrasonic bath (Elmasonic S900H ) APV25 based readout systems with 5000 channels for testing GEMs Wiener MPOD High Voltage system

7 N 2 Box for HV test of GEM Foils Resistors soldered on GEM Assembly Steps of the SBS GEM Prototype at UVa

8

9 Preparation of the readout board Stretching of GEM foils Assembly Steps of the SBS GEM Prototype at UVa

10 Test frames glued

X-axis t1 Y-axis t1 X-axis, t ns Y-axis t ns First results from SBS GEM Prototype: MPD readout

First results from SBS GEM Prototype: SRS readout Distribution of the mean ADC count: Gain uniformity Y-axis (mm) X-axis (mm) X/Y (ADC) = 1.12

First results from SBS GEM Prototype: SRS readout Distribution of the mean ADC count: Gain uniformity Y-axis (mm) X-axis (mm) X/Y (ADC) = 1.12

14

SBS GEM Chamber Gain Calibration

Test pulse = 360 mV, Capacitor = 3.3 pF  Equivalent charges = 7.2 Million e- Injected charges = Equivalent charges / Attenuator  attenuation 3dB to 39 db Pulse generator 360 mV Attenuator 3db to 39 db Capacitor box 3.3 pF GEM chamber readout 50  m APV25 Electronics (MPD and SRS) External trigger Signal form one strip APV 25 Gain Calibration Just did this calibration for both SRS and MPD systems

Pedestal Noise – RMS distribution for 128 stripes ADC chan.

 Module of 50x50cm 2 to replace the 40x50cm 2 32 modules to be built instead of 40 for the 8 Polarimeter chambers  Wider GEM frames along x-axis Width of 30 mm instead of 8 mm Better stretching alignment holes away from active area  Wider readout support frame along x-axis (74 mm) Room for strips connectors and GEM HV sectors electrodes  No protective resistors on the GEM foils  External resistor boards  Gas system same as in Evaristo design New design for the SBS GEM polarimeter trackers –from Kondo Gas inlet Gas outlet window Drift cathode GEM foil 1 GEM foil 2 GEM foil 3

GEM Foil with HV sectors 12 HV sector electrodes Alignment holes gas holes 600 mm 590 mm 562 mm

GEM Frame with outer frame 572 mm 528 mm 572 mm 512 mm 562 mm

GEM Frame without outer frame after assembly 572 mm 512 mm 528 mm

GEM Foil with HV sectors

GEM Foil with HV sectors after assembly 600 mm 528 mm

GEM Foil with HV sectors on its frame after assembly

Readout Support with its outer frame 572 mm 528 mm Up to 660 mm to be decided with Rui 245 mm 10 mm 245 mm 100 mm 562 mm

Readout Support with its outer frame

Keeping the outer frame during assembly Fixation holes Alignment holes

Readout support after assembly 528 mm Up to 660 mm to be decided with Rui

Y-Strips connectors on flexible PCB 80 mm 49.5 mm APV-25 FE cards (Italian Electronics) on scale on the readout board Panasonic connectors X/Y readout board with Panasonic connectors and Italian APV25 based electronics

SBS GEM with APV25 FE cards (Italian Electronics)

Frame Design

4 SBS GEMs with APV25-FE for each of the 8 Polarimeter chambers

Install new clean room and upgrade equipment. Parts for two 50 cm x 50 cm prototypes ordered – expect delivery by December. Complete the construction of prototypes by February. March to May Characterize the chambers, finalize the design and order parts for 8 (?) chambers. Order Electronics for 8 chambers Proposed production schedule May 2013 – May 2014 – 8 modules May 2014 – May 2015 – 16 modules May 2015 – May 2016 – 16 modules It is crucial that we get our GEM foil orders out as soon possible. Future plans

Cosmic test results 34