Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Repetitive Flood Claims (RFC) Severe Repetitive Loss (SRL) D. Casey Levy State Hazard.

Slides:



Advertisements
Similar presentations
This is an audio-enhanced PowerPoint presentation. To hear the audio, please open this presentation in Slide Show view. Changes to the National Flood.
Advertisements

Key Concepts for AmeriCorps. Session Objectives Provide an opportunity for participants to network in program specific group Discuss key fiscal and grant.
New Jersey Election Law Enforcement Commission June 2007 Fair and Clean Elections Pilot Project 2007.
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance.
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Hazard Mitigation Grant Program Applicants Briefing FEMA.
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Hazard Mitigation Grant Program Applicants Briefing FEMA.
Prepare + Prevent + Respond + Recover + Mitigate 1 Credit Resolution Initiative GOHSEPs focus is on proactively working with applicants to: – Identify.
Local Policy I Session Name: Local Policy I Coastal Hazards Management Course I. Introduction What Do We Mean By “Local Policy” General Police Power Session.
Hazard Mitigation Planning I Session Name: Hazard Mitigation Planning I Coastal Hazards Management Course Signed by the President on October 30, 2000 Amends.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
Local Hazard Mitigation Plan Update Primer: Why and How to Update the LHMP.
E257 State Directors Training - Mitigation 1 Hazard Mitigation Assistance (HMA) Borough of Westwood Hurricane Irene – FEMA 4021-DR-NJ  Sgt. Michael Gallagher,
Levee Decertification & CRS: How a Catch-22 Can Catch You! ASFPM 2011 National Conference Louisville, KY Wednesday, May 17, 2011 ASFPM 2011 National Conference.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
FEMA Overview. FEMA overview Federal disaster contracting Emergency Preparedness 2.
Texas Department of Public Safety WHAT’S NEW IN MITIGATION BIG CHANGES in the FEMA HMA Grant Programs.
F EDERAL I NSURANCE AND M ITIGATION A DMINISTRATION Hazard Mitigation Overview Franki Coons Chief, Grants Implementation Branch Risk Reduction Division.
HAZARD MITIGATION PLANNING What is Hazard Mitigation? Any action taken to reduce future disaster losses.
Dave JacksonMark Stephensen State Hazard Mitigation OfficerMitigation Planner Mitigation Program Briefing.
FEMA NFIP Community Rating System and Crediting Tsunami Mitigation Mike Mahoney, FEMA Mitigation.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Update Training Meeting
Prepare + Prevent + Respond + Recover + Mitigate What is the match? 1.
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Flood Mitigation Assistance (FMA) Repetitive Flood Claims.
Governor’s Office of Emergency Services Disaster Mitigation Act of 2000 Changes to the Federal Hazard Mitigation Program.
Risk and Emergency Management Division Southside Hampton Roads Hazard Mitigation Plan.
Emergency Management Cycle. Planning Regulatory Requirement Per 44 CFR (a) (1) - For all disasters declared on or after November 1, 2004, all states,
Wendy Blackwell, State Hazard Mitigation Officer New Mexico Infrastructure Finance Conference October 29, 2014.
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
National Flood Insurance and Flood Mitigation Virginia Beam.
Unit 1 Community Capabilities
Mitigation. Hazard Mitigation is any sustained action taken to reduce or eliminate long-term risk to people and their property from hazards and their.
Session 4Slide 4-1 Hazards Risk Management In the United States Session 4 Slide Deck.
Increased Cost of Compliance The Basics (Last updated July 25, 2006)
HAZARD MITIGATION 101 Sandusky County Initial Planning Meeting March 11, 2014.
Oconee County Hazard Mitigation Plan Update Kickoff Meeting Brian Laughlin Hazard Mitigation Planner Georgia Emergency.
Hazard Mitigation Planning and Project Funding. Agenda Objectives Overview of Hazard Mitigation Hazard Mitigation Planning Mitigation Project Funding.
» “To make or become less severe…” » Less property damage » Less injury » Less death » In an independent study conducted in 2014 for every 1 dollar spent.
ASFPM 2011 FEMA’s National Flood Mitigation Data Collection Tool (NT) Errol Garren May 19, 2011 H-4A 4:
Hazard Mitigation Assistance Hazard Mitigation means any action taken to reduce or eliminate the long-term risk too human life and property from natural.
HAZARD MITIGATION ASSISTANCE Region X Mitigation Summit 2014.
State of Louisiana Mitigation Governor's Office of Homeland Security and Emergency Preparedness Governor’s Office of Homeland Security & Emergency Preparedness.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
Session 17Slide 17-1 Financing Risk Reduction Session 17 Slide Deck.
Mitigation Update Steve Ferryman, CFM Ohio EMA Mitigation Branch Chief Spring Director’s Seminar
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
Central Connecticut Region Multi-Jurisdictional Hazard Mitigation Plan Advisory Committee Meeting November 17, 2014.
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Hazard Mitigation Funding Programs. Current Florida Mitigation Programs 1.Hazard Mitigation Grant Program* (HMGP) Hazard Mitigation 3.Pre-Disaster.
Hazard Mitigation Grant Program DR-4227 HMGP Applicant Briefing October 2015.
What might a picture be worth in Mitigation?. Fort Kent awarded $829,600 in HMGP grant for acquisition / demolition.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
-Pre Disaster Mitigation (PDM) -Hazard Mitigation Grant (HMGP) -Flood Mitigation Assistance (FMA)/ Repetitive Flood Claims (RFC)/ Severe Repetitive Loss.
Topics General Common Mitigation Mitigation Policies Application Development Structural Non-Structural Planning Other Benefit / Cost Prioritization Technical.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
FEMA PUBLIC ASSISTANCE - A PRIMER
Local Hazard Mitigation Planning and Grants Program
City of Bixby, Oklahoma 2008 Multi-Hazard Mitigation Plan Update
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
VDEM Grants Overview Virginia Emergency Management Symposium March 22, 2017 Williamsburg, VA.
Tribal Hazard Mitigation Planning
Glynn County, GA Flood Remapping January 2018
Presentation Overview
FEMA’s Hazard Mitigation Grant Programs
Local Hazard Mitigation Planning & Disaster Preparedness
Hazard Mitigation_Resource_7-16
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
Notice of Funding Opportunity FY 2017 HMA Programs
Planning Partner Adoption Multi-Jurisdictional Hazard Mitigation Plan
Presentation transcript:

Pre-Disaster Mitigation (PDM) Flood Mitigation Assistance (FMA) Repetitive Flood Claims (RFC) Severe Repetitive Loss (SRL) D. Casey Levy State Hazard Mitigation Officer

Pre-Disaster Mitigation (PDM) Grant Program Guidance Overview CFDA #97

PDM Introduction & Summary Provides funding for hazard mitigation planning and the implementation of mitigation projects prior to a disaster event. PDM grants are awarded on a competitive basis. Due to the Federal Budget Continuing Resolution, funding for the FY 2008 PDM Grant Program has yet to be appropriated.

PDM Application Period National Application Period October 31, 2007- January 31, 2008 Applications must be received in eGrants by January 10, 2008 11:59:59 PM, EST

PDM Eligible Sub-Applicants State-level agencies Tribal governments (Federally recognized) Local governments State Universities Private Non-Profits (PNP) and Private Universities must apply through relevant local governments or State agencies.

PDM Types of Sub-Applications Hazard Mitigation Plans 44 CFR Part 201: Sub-applicants must have a FEMA-approved hazard mitigation plan by the application deadline to be eligible for PDM funding Mitigation Projects State Management/Technical Assistance Costs

PDM Eligible Planning Activities New Plan Development Comprehensive Review and Update PDM planning grant awards must result in an adopted FEMA-approved hazard mitigation plan prior to the end of the performance period.

PDM Eligible Project Activities Acquisition Relocation Elevation Structural and Non-structural retrofitting of existing buildings (Wildfire, seismic, wind, or flood hazard) Safe rooms

PDM Eligible Project Activities continued Studies/Analyses included in a Project Sub-application to support project design/feasibility Vegetation Management Protective Measures for Infrastructure Storm Water Management Localized Flood Control Projects designed specifically to protect critical facilities

PDM Match Share and Funding 75% Federal Cost Share 25% Non-Federal Cost Share Up to 90% for small impoverished communities meeting qualifications listed in the guidance. No additional funding will be made available for Cost Over-runs Cost Under-runs may not be shared between Sub-Applicants

PDM National Flood Insurance Program (NFIP) Participation Requirement NFIP participation is required if: Sub-applicants are identified as having Special Flood Hazard Areas (SFHA) A Flood Hazard Boundary Map (FBHM) or Flood Insurance Rate Map (FIRM) has been issued for their specific jurisdiction The Sub-applicant may not be suspended, on probation, or withdrawn from the NFIP

PDM Planning Requirement Sub-applicants must have a FEMA-approved Local Hazard Mitigation Plan by the end of the application period This does not prohibit application development for a project within eGrants Potential sub-applicants are encouraged to complete their plans as soon as possible Sub-applicants without a plan may apply for planning funds

New to FY 2008- PDM Planning Funds Communities without approved plans by the end of the performance period will be subject to funding recoupment. Plans approvable pending adoption but not approved = 10% recoupment minimum Plans reviewed but not approved = 25% recoupment minimum Plans never received by FEMA = 100% recoupment

PDM Performance Period/Extensions Limited by statute to a performance period not to exceed 3 years The Regional Office may extend the performance period up to 1 year

PDM National Rankings and Evaluations Regional Offices will review all sub-applications for eligibility and completeness Sub-applications will be forwarded to National Evaluation Following a technical review for feasibility and cost-effectiveness, selections will be made at Headquarters level

PDM Additional Information Sub-applications must be consistent with the goals and objectives of both the State plan and the communities’ local plan Projects submitted with local plans not approved by the application deadline will not be considered Projects submitted without an attached BCA will not be considered Sub-applications using the “Very Limited Data” Flood Module will not be considered

PDM Additional Information FEMA will ensure that a State will receive no less than $500,000 for sub-applications within the State that meet all FY 2008 Guidance eligibility requirements. Sub-applications must be consistent with the goals and objectives of both the State plan and the communities’ local plan

Flood Mitigation Assistance (FMA) Grant Program Guidance Overview CFDA #97.029

FMA Introduction & Summary Pre-disaster grant program. To implement cost-effective measures that reduce or eliminate the long-term risk of flood damage to structures insured by the National Flood Insurance Program (NFIP).

FMA Application Period National Application Period October 31, 2007- March 31, 2008 Applications must be received in eGrants by March 10, 2008 11:59:59 pm, EST

FMA Funding Estimate FY 08 National Funding Estimate: $30 Million State Minimum Baseline: $110,000.00 Based on the number of NFIP policies and the number of Repetitive Loss Properties

FMA Eligible Sub-Applicants State-Level Agencies Federally and State-Recognized Indian Tribal Governments Local Communities Private Non-Profit (PNP) organizations are NOT eligible sub-applicants

FMA Types of Sub-applications FMA Plans Meeting 44 CFR Part 78.5 Cannot fund Hazard Mitigation Plans to meet 44 CFR 201 Mitigation Projects Must meet planning and NFIP requirements Technical Assistance/State Management Costs

FMA Eligible Activities FMA Mitigation Plans No update to local FMA Plans is required Mitigation Projects Acquisition/Relocation/Elevation Dry Flood-proofing of Non-residential structures Minor localized flood control projects 50% of structures benefiting must be insured Beach Renourishment

FMA Match Shares and Funding Up to 75% Federal Cost Share 25% Local Cost Share Maximum in-kind match cannot exceed 12.5% Minimum cash match must be at least 12.5% Maximum applicant 5-year allocation: $20 Million Maximum sub-applicant 5-year awards: $3.3 Million

FMA National Flood Insurance Program (NFIP) Participation Requirement All sub-applicants must participate in the National Flood Insurance Program (NFIP) Funds shall not be awarded for activities in suspended, withdrawn, or non-participating communities. Properties must be NFIP insured at the time of project application and maintained at least through completion of the mitigation activity.

FMA Planning Requirement Sub-applicants must have a FEMA-approved FMA Plan by the end of the application period This does not prohibit application development for a project within eGrants Potential sub-applicants are encouraged to complete their plans as soon as possible Sub-applicants without a plan may apply for planning funds

FMA Performance Periods and Extensions Limited by statute to a period not to exceed 3 years Regional office may extend the performance period for up to 1 year

Repetitive Flood Claims (RFC) Grant Program Guidance Overview CFDA #97

RFC Introduction & Summary Provides funding to reduce or eliminate the long-term risk of flood damage to structures insured under the NFIP that have one or more flood claims Competitive Grant Program, no target allocation

RFC Application Period National Application Period October 31, 2007- January 31, 2008 Applications must be received in eGrants by January 10, 2008 11:59:59 pm, EST

RFC Eligible Sub-Applicants State-Level agencies Tribal governments (Federally Recognized) Local governments State Universities Private Non-Profits (PNP) and Private Universities must apply through relevant local governments or State agencies

RFC Types of Sub-applications Mitigation Projects Must meet planning and NFIP requirements

RFC Eligible Activities Acquisitions and Relocations Property must be insured and have one or more flood claims Elevations Dry Flood-proofing of non-residential structures Minor Localized Flood Control Projects 50% of structures benefiting must be insured

RFC Match Shares and Funding Up to 100% Federal Cost Share under certain conditions (Must meet the requirements for Reduced Capacity) No additional funding is available for cost over-runs Under-runs may not be shared between sub-applicants

RFC Reduced Capacity (Funding) In order to be eligible for the 100% Federal Cost-share, Sub-applicants must provide certification (signed documentation) demonstrating: Why the project is not eligible for the FMA program (why the FMA allocation cannot fund the project) Why the 25% match cannot be funded

RFC Reduced Capacity (Resources) In order to be eligible for the 100% Federal Cost-share, Sub-applicants must provide certification (signed documentation) demonstrating: That the Applicant and Sub-applicant lack the capacity to manage the funds Lack of capacity may be demonstrated as lack of adequate resources, or meeting the conditions of a small, impoverished community

RFC National Flood Insurance Program (NFIP) Participation Requirement Sub-applicants must participate in the NFIP RFC funds will not be awarded for activities in non-participating, suspended, or withdrawn communities Properties in all RFC projects must be NFIP insured at the time of project application and maintained through completion of the mitigation activity.

RFC Performance Periods and Extensions Limited by statute to a period not to exceed 3 years Regional office may extend the performance period for up to 1 year

RFC National Ranking and Selection FEMA will rank all eligible sub-applications based upon the greatest savings to the National Flood Insurance Fund Eligible project sub-applications not selected for RFC grant awards during FY 08 may be considered during FY 09

PDM/RFC/FMA Reporting Requirements The Sub-Grantee shall submit quarterly reports for each grant award by the following dates: March 31 June 30 September 30 December 31

Severe Repetitive Loss (SRL) Grant Program Introduction

SRL Information and Guidance The guidance for SRL has not been released. FEMA is hoping for an open application period sometime in January ‘08.

SRL Introduction & Summary Provides funding to reduce or eliminate the long-term risk of flood damage to severe repetitive loss (SRL) structures insured under the NFIP

SRL Properties Residential properties with at least four NFIP claim payments over $5,000 each, where at least two claims have occurred within any ten-year period and the cumulative amount of such claims payments exceeds $20,000; or For which at least two separate claim payments have been made within any ten-year period, with the cumulative amount of the building portion of such claims exceeding the value of the property

SRL Eligible Activities Relocation Flood-proofing of historical properties Elevation Acquisition Mitigation reconstruction Minor physical localized flood control projects

SRL Cost Share 75% Federal Cost Share 25% Non-Federal Cost Share

Contact Information Annick D. Leger Governor’s Office of Homeland Security and Emergency Preparedness 415 N 15th Street 4th Floor- Mitigation Section Baton Rouge, LA 70802 225-439-3886 aleger@ohsep.louisiana.gov

Contact Information D. Casey Levy State Hazard Mitigation Officer Governor’s Office of Homeland Security and Emergency Preparedness 7667 Independence Boulevard Baton Rouge, LA 70806 225-439-8758 clevy@ohsep.louisiana.gov