October 2014 Cadiz Valley Water Conservation, Recovery and Storage Project.

Slides:



Advertisements
Similar presentations
Cadiz Valley Water Conservation, Recovery & Storage Project July 2013.
Advertisements

Mojave Water Agency: How we are trying to avoid our own liquidity crisis Kirby Brill General Manager, Mojave Water Agency Business Development Association.
Borrego Valley Borrego Valley Integrated Regional Water Management Planning Integrated Regional Water Management Planning.
CADIZ INC. (NASDAQ: CDZI) Corporate Overview. January 2015 This presentation contains forward-looking statements that are subject to significant risks.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
OCSD Case Study Hydrogen from Sewage
Presented by Chris Stone Assistant Deputy Director Water Resources Division.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
We can’t afford to wait until disaster strikes to protect our water supply.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
CMUA Legislative Briefing February 26, Regional water wholesaler 26 Member Agencies 6 counties Serving approximately 19 million residents 5,200.
The Santa Ana River Watershed Program Drought Proofing the Region and Enhancing the Environment Martha Davis, Inland Empire Utilities Agency April 2000.
CADIZ INC. Sustainable Land, Water & Agricultural Resources B. Riley & Co. Conference May 13, 2015.
Proposed San Antonio Groundwater Availability Project Claudia Faunt and Matt Landon California Water Science Center U.S. Geological Survey.
THE CADIZ PROJECT HYDROGEOLOGY John M. “Jack” Sharp, Jr.* Consulting Groundwater Hydrologist Chair, Groundwater Stewardship Committee * Also: Carlton Professor.
Overview of Indian Wells Valley Hydrogeology and Management Presenters.
CADIZ INC. Sustainable Land, Water & Agricultural Resources (NASDAQ: CDZI) June 2015.
2014 California Water Bond Southern California Water Dialogue Sept. 24, 2014 Timothy Quinn, ACWA Executive Director.
August 23, 2012 Urban Water Institute August 23, 2012 Can the Colorado River meet our Region’s Future Water Supply Needs? Bill Hasencamp Manager, Colorado.
One Water One Watershed: A New Model for Resources Management Santa Ana Watershed Project Authority Jeffrey Beehler, Ph.D. Environmental Program Manager.
Southern California Regional Watershed Supply Alternatives
You thought the CVP was large. No Bureau requirements Half a million newcomers per year West side of San Joaquin Valley needs water Some Farms 224,000.
Charles Hosken, General Manager Imperial Irrigation District
Orange County Business Council Infrastructure Committee
Bhfs.comBrownstein Hyatt Farber Schreck, LLP Who Controls the Water? Reforming California Water Law Governance in an Age of Scarcity A Success Story about.
Groundwater Basin Assessment Study Southern California Water Dialogue January 24, 2007.
Where is fresh water found? What are some California water sources?
LAKESHASTA LAKEOROVILLE Bay-Delta STATE WATER PROJECT (2.0 MAF) LOS ANGELES AQUEDUCTS (0.5 MAF) COLORADO RIVER AQUEDUCT (1.25 MAF) METROPOLITAN WATER.
Rodman & Renshaw Conference September 2015 This presentation contains forward-looking statements that are subject to significant risks and.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
PROTECTING OUR WATER SUPPLIES FOR THE FUTURE ― THE LEGAL SAFEGUARDS AVAILABLE FOR THE DILIGENT CITIZEN Edward J. Casey October 14, 2006.
CADIZ VALLEY WATER CONSERVATION, RECOVERY AND STORAGE PROJECT ENVIRONMENTAL REVIEW Urban Water Institute 2014 Conference February 19, 2014 Leslie Moulton,
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Los Angeles River Watershed
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Eric Bergh Manager of Resources October 28 th, 2009 Climate Change and Water Supply An Urban Water Agency’s Perspective.
Copyright 2010 STWR L.P. by Rodney T. Smith President, Southwest Texas Water Resources, L.P. Edwards Aquifer Recovery Implementation Program Stakeholders.
April 27, 2011 So. Cal. Water Dialogue Southern California Water Dialogue April 27, 2011 The Colorado River: Partnering for success Bill Hasencamp Manager,
SCAP Collection Systems Committee
Proposed Water Availability Study for the San Antonio Groundwater Basin Santa Barbara County Water Agency Santa Barbara County Public Works Dept. Matt.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Groundwater Assessment Study for the Metropolitan Water District of Southern California Southern California Water Dialogue May 2008.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
California Water Jeffrey Kightlinger, General Manager
Available Funding North/South Lahontan Colorado River Basin Sacramento River Mountain Counties Tulare/Kern San Diego Santa Ana Los Angeles Central Coast.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
Chris Stone Assistant Deputy Director Water Resources Division.
San Gabriel Valley From Stormwater to Supply
April This presentation contains forward-looking statements that are subject to significant risks and uncertainties, including statements related.
Orange County Sanitation District Orange County Sanitation District Example Title Slide Example Title Slide.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
Rob Thompson, Director of Engineering April 7, 2016 Orange County Sanitation District.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Cadiz Inc. corporate overview March 2017.
Assemblymember Adrin Nazarian
Cadiz Inc. corporate overview March 2017.
Cadiz Inc. corporate overview May 2017.
December 2016.
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
Zone 7 And WaterFix March 7, 2018
PALM DESERT FEBRUARY 9, 2018 Dr. ALLAN BERNSTEIN TUSTIN CITY COUNCIL
Washington State Infrastructure Financing
Orange County Groundwater Basin Compliance with SGMA
Antelope Valley-East Kern Water Agency
Mutually Beneficial Partnerships in Groundwater Banking Paul Weghorst Irvine Ranch Water District August 15, 2019.
Chino Basin Water Bank Development
Presentation transcript:

October 2014 Cadiz Valley Water Conservation, Recovery and Storage Project

Southern California Water Supply o MWD  State Water Project  Colorado River Aqueduct o LADWP  LA Aqueduct o OCWD  OC Aquifer

CADIZ Colorado River Aqueduct DANBY PIUTE About Cadiz o California company founded in o Owns land (45,000 acres) and water rights in three San Bernardino County locations. o 20-year organic farm operation in Cadiz Valley.

o 1,300 sq. mile watershed - size of Rhode Island. o Approx. 20 million AF stored in the alluvial aquifers, comparable to Lake Mead. o Estimated average natural recharge 32,500 AF/year. o Cadiz-owned land & water rights at base of watershed. o Groundwater flows to dry lakes at base, where it is lost to evaporation. The Cadiz Valley Cadiz Dry Lake Bristol Dry Lake 5 Miles 66 Fenner Valley Orange Blossom Wash Granite Mountains Providence Mountains New York Mountains 4

Project Design o Intercept and conserve groundwater before it reaches dry lakes. o Put conserved water to beneficial use in So. Cal. water system. o Without intervention, billions of gallons of water would be lost. 5

Conservation & Recovery (CEQA Approved) o Complete construction of wellfield, natural gas power source and ancillary facilities. o Construct 43-mile buried pipeline to Colorado River Aqueduct within Arizona & California Railroad right-of-way. o Deliver an average of 50,000 AF/year to water providers over the 50-year project term, subject to management plan. o New, reliable supply for 100,000 families every year for 50 years. Project Description – Phase 1 6

Phase 1 Project Participants o Santa Margarita Water District – 155,000 water customers in South Orange County o Golden State Water Company – OC operations: Buena Park, Cowan Heights, Cypress, Garden Grove, La Palma, Lemon Heights, Los Alamitos, Orange, Placentia, Rossmoor, Santa Ana, Seal Beach, Stanton and Yorba Linda o Suburban Water Systems – LA, Ventura o Three Valleys Municipal Water District – San Gabriel Valley o Jurupa Community Services District and City of Coachella – Riverside County o Lake Arrowhead CSD – San Bernardino County o Many others are considering purchases 7

Phase 1 Status  Environmental Impact Report certified by Santa Margarita Water District  Groundwater Management, Monitoring and Mitigation Plan approved by San Bernardino County Board of Supervisors  All CEQA litigation not already dismissed or settled has been dismissed in Superior Court ruling  Use of railroad right-of-way for pipeline under review by Department of Interior  Discussions with MWD regarding use of Colorado River Aqueduct will begin upon finalization of all Purchase & Sale Agreements  Construction start:

o Upon design and approval, would import water from State Water Project or Colorado River Aqueduct in wet years and store in the aquifer system for later use in dry years. o Required facilities: Convert existing 96-mile pipeline from Cadiz to Barstow to water conveyance Construct recharge basins and a pump station on Cadiz property. o Total storage capacity = 1 million acre-feet. Phase 2 – Imported Water Storage 9

Water supply Reliable 50,000 AF/year in So Cal water system, plus salinity management and storage offsets. – PhD Economist Rod Smith estimates value of water supply benefit at $6.1 billion. Local Economy Dr. John Husing estimates construction will contribute: $878 M total benefit to local economy 5,900 jobs created. $19.6 million in new state and local tax revenues in Phase 1 construction, plus – 6 million/year in local tax revenue once operational. Benefits 10

Support Orange County Business Council O.C. Taxpayers Association Chambers of Commerce: South Orange County, Adelanto, Needles, Twentynine Palms, Rancho Cucamonga, Fontana, & Redlands Laborers International Union, Local 783 Union of Operating Engineers, Local 12 Building Industry Association of Southern California Engineering Contractors Association Inland Empire Economic Partnership The Morongo Basin Regional Economic Development Consortium City of Industry Manufacturer’s Council 11

For more information, visit -

Earlier Plan Vs. Current Plan

o Aquifer productivity/recharge models (using USGS )-(CH2MHill) o Groundwater modeling and impact analysis - (Geoscience) o Local desert spring impact assessment - (CH2MHill) o Dry lake impact assessment - (HydroBio/Groeneveld) o Biological resources assessment - (Circle Mountain) o Dry lake evaporation rate analysis - (Desert Research Institute) o 10 new wells at the Project site drilled to up to 2,000 ft.  Cavernous limestone carbonate strata deep below ground  Geological characteristics corroborate recharge and project design $10M Investment in Science

o 13-member unpaid panel from diverse fields peer-reviewed Project’s scientific and technical reports and guided design of operating and monitoring plan. o Panel found Project could be operated without significant impacts. “I find the project to be viable and capable of being implemented and administered without deleterious effects on the environment. The monitoring plan will ensure that any unanticipated effects are detected and dealt with.” Dr. Charles Groat, GSC Member Former Director of the U.S.G.S. Professor of Geological Sciences, University of Texas at Austin Groundwater Stewardship Committee

o Independent enforcement by San Bernardino County under Desert GW Ordinance. o Over 40 monitoring features throughout watershed, including –  Measured water levels in private wells  Air quality monitoring installations  Subsidence monitoring devices o Regular monitoring reports prepared by technical experts will be reviewed and posted online. o 80 ft floor on Project operations and multiple additional “action triggers” with strict corrective actions, including shutdown of operations. Groundwater Management Plan 16

Cadiz Southeastern Railway Proposed new entertainment attraction that will operate regularly scheduled steam train excursions between Cadiz and Parker, Arizona on the ARZC. Cadiz and ARZC entered trackage rights agreement in Sept The steam locomotives will be powered by water made available from the Project. Expected to promote local tourist economy, attract visitors to nearby national /state parks, Colorado River, etc…