1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005.

Slides:



Advertisements
Similar presentations
Water Law and Institutions – rights and binding agreements U.S. water rights traditionally based on common law: Riparian doctrine in East – land owners.
Advertisements

Contracts – important issues
Status Update on Future Water Quality Strategies for the Refuge Kenneth G. Ammon, P.E., Deputy Executive Director, Everglades Restoration and Capital Projects.
Last Topic - National Security Measures taken to ensure national security include Pakistan National Security Council (PNSC) Elements of National Security.
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
 Elder Mediation Ckk Elder Guardianship Mediation: Best Practices and Standards for Protecting Vulnerable Older Adults Presentation © by Joan Braun 2012.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
Cooperative Agreements “Suppression”
International Workshop on Institutional Capacity Development in Transboundary Basins, November 2008, Bonn, Germany Governance and Institutional Arrangements.
WTO FORUM: ARTICLE 25 OF THE DSU Christian Albanesi Managing Counsel ICC International Court of Arbitration.
ICC International Court of Arbitration
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
Questions and answers on Bill C-4, Budget Implementation Act.
1 May 2007 Instructions for the WG Chair The IEEE-SA strongly recommends that at each WG meeting the chair or a designee: l Show slides #1 through #5 of.
Slovenia One of very few EU countries without a special legal regulation of that topic  Why? Other possibilities? EU Directive on AR for Consumer Disputes.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
St’át’imc – BC Hydro Agreement Review and Update: January
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
Columbia River Treaty Review British Columbia Perspective Northwest Hydroelectric Association 2013 Annual Conference Portland, Oregon February 20, 2013.
There are a number of different ways of managing transboundary river systems, and different institutional responses to these challenges.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
ANNUAL CONFERENCE CARRIBEA BAY RESORT, KARIBA 3 OCTOBER 2014.
Compensation events and claims Presented by Prof. Khem Dallakoti.
FIRST NATIONS JURISDICTION OVER EDUCATION Presentation January 19, 2006 Presented by Christa Williams Executive Director First Nations Education Steering.
APGNS Continuing Professional Development & Competency Assurance Program (CPD) David C. Carter, P.Geo, FGC. November 13, 2013.
Regional Technical Cooperation on Water The Nile Basin Case ByA.M.Farahat Prof. INP, Cairo, Egypt Arab Water Council Representative Istanbul May 3-5, 2011.
1 Columbia River Treaty Overview of Columbia River system water management presented at Canadian Columbia River Forum 30 May 2007 Kelvin Ketchum BC Hydro.
Moving Forward With the African Dialogue Cross-Border Principles By Mary Gurure Manager, Legal Services and Compliance COMESA Competition Commission Lilongwe,
CANADIAN COLUMBIA RIVER FORUM Biological Opinion: An overview of The impacts on Water Management Jim Barton, Chief of Corps of Engineers Columbia Basin.
July 17, 2013 Wenatchee, WA Kevin M. Nordt Grant PUD 1.
2014/2024 Review Columbia River Treaty Bonneville Power Administration - U.S. Army Corps of Engineers Briefing for the Central Asian Delegation January.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
Contractor / Engineer Conference 2010 Dispute Resolution Process Dispute Resolution Process.
1 Chapter 33 International business Copyright © Nelson Australia Pty Ltd 2003.
The Treaty of Waitangi When Where Why Who How does it effect us in NZ today and in the future?
April Columbia River Treaty Overview of Columbia River Treaty.
Columbia Basin Regional Advisory Committee Provincial Columbia River Treaty Review September 11, 2014 Nelson, BC Kathy Eichenberger BC Ministry of Energy.
2 HISTORY OF MEKONG COOPERATION IRBP Course PP 2.4.
Management of the Great Lakes by the U.S. and Canada Presented by Johnny Sullivan March 6, 2012.
INTEREST BASED PROBLEM SOLVING (IBPS) Does the Statutory scheme in BC support IBPS? Is IBPS new; or is it simply basic principles of effective problem.
HYDROPOWER NWD HAS LION SHARE (75%) OF COE HYDRO NWD HAS LION SHARE (75%) OF COE HYDRO PACIFIC NW’S DOMINANT POWER SOURCE PACIFIC NW’S DOMINANT POWER.
Protocol on Water and Health: added value and challenges for public participation Tsvietkova Anna MAMA-86’s Water and Sanitation Program Workshop on Water.
Stakeholders Terms of Reference - BOD Goals GCOOS Stakeholder Council Once potential users and stakeholders for GCOOS have been identified, a Stakeholder.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
Experiences From the Columbia Basin British Columbia, Canada Commission for Environmental Cooperation of North America Joint Public Advisory Committee.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Columbia River Basin Governance in Transition Public Workshop on the Columbia River Treaty October 7, 2015.
Title Slide HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY HISTORICAL BACKGROUND of COLUMBIA RIVER TREATY.
Negotiations and Agreements Between Ganges River Basin Riparians Khalid Khan Khalid Saifullah Muhammad Arif Goheer.
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
1 Legal Frameworks for Public and Stakeholder Engagement by Carl Bruch Asia Regional Workshop on Stakeholder Engagement in International Waters Management.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
An introduction to the IPPC Dispute Avoidance and Settlement System IPPC Secretariat Regional IPPC Workshop 2015.
Hao Duy Phan (SJD) Centre for International Law (CIL) National University of Singapore UNCLOS DISPUTE SETTLMENT MECHANISMS ON MARITIME BOUNDARIES AND THE.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 28 – Consumer and Health Protection.
Partnership Defined “An association of two or more persons to carry on as co-owners a business for profit.” Attributes: Agreement, expressed or implied.
Distribution Contracts and Arbitration How to deal with small agency and distribution disputes Marie Öhrström Assistant Secretary General
Kansas Experience in Technical Negotiations for Tribal Water Right Settlements Symposium on the Settlement of Indian Reserved Water Rights Claims, Great.
International Arbitration in Russia under the new legislative framework Dmitry Davydenko Ph.D. in Law (Russian Federation), Executive Secretary of Maritime.
The Grand Ethiopian Renaissance Dam: A Catalyst for Change?
IPR in FP7 Bart Janse DG Research A.2.
An Introduction to the Sunshine Act
Online Dispute Resolution The State of the Art.
BCDR-AAA/SCC Joint Conference
Dana Rone, Turiba University (Latvia)
Presentation transcript:

1 Columbia River Forum Columbia River Treaty A Federal Perspective David Burpee Natural Resources Canada November 9, 2005

2 Federal Treaty Responsibilities Contracting party in relation to United States Appoints two members of the Permanent Engineering Board, one at the recommendation of B.C. –Reports annually to Parliament –Assists in reconciling differences between Entities Settlement of differences arising under the Treaty –International Joint Commission –Arbitration tribunal appointed by Canada and the United States Once Treaty comes to an end, legal regime prevailing prior to the Treaty, including the Boundary Waters Treaty, will again apply to the Basin

3 Canada – British Columbia Agreements British Columbia (Owner of Resource) –Construct and operate Treaty reservoirs –Make land in BC available for Libby reservoir –Generally do all things …to ensure that Canada is not in default under the Treaty Canada (Contracting Party with US) –Transfer benefits of Treaty to British Columbia –Designate BC Hydro as the Canadian Entity –Do whatever is reasonably possible to ensure compliance with the Treaty by the United States –At BC’s request, present any claim deemed reasonable by Canada arising out of the Treaty against the United States –Establish whatever arbitration tribunal necessary to settle differences under the Treaty Canada and British Columbia will consult to avoid disputes and carry out the agreements (Liaison Committee)

4 Addressing issues within Treaty Resolving differences between Canada and US –End of the initial 30-year sale of the Canadian Entitlement Calculation of the downstream power benefits Return of the Canadian Entitlement –Fisheries operations Rely primarily on Operating Entities to find mutually agreeable solutions Permanent Engineering Board –Assist Entities in finding solution –Ensure consistency with Treaty Record of working through issues and finding solutions consistent with Treaty

5 Addressing issues within Treaty (2) Treaty does provide some flexibility to the Operating Entities –Treaty requires that Assured Operating Plan optimize for power subject to flood control –Entities may agree on Detailed Operating Plans that may produce results more advantageous to both countries than the AOP DOP considered to include “supplemental operating agreements” –Allows Entities some ability to address Updated information Other constraints not included in the AOP –Examples: Provisional draft for whitefish protection Libby – Canadian storage to improve recreation conditions

6 Addressing issues within Treaty (3) Columbia River Treaty: –A power and flood control dinosaur? –A framework for cooperation, sharing of benefits, and resolving issues? Treaty provides Entities with some flexibility to adjust to demands and constraints within the basin The Entities have been remarkably successful in finding solutions within the Treaty Hypothesis: –Experience to date suggests that it is possible for those with interest in the basin, the Entities, and governments to address issues with the framework of the Treaty –Recognizing there are limits

7 Getting Ready for Complex and varied issues and interests in Canada and in the United States: suggests early start Challenge to focus attention given this timeframe –Competing with near-term challenges, emerging issues, and limited resources One approach: –Develop knowledge base for all interested parties; not advocacy –Address near-term issues within Treaty and established processes –Identify, develop and recommend opportunities for improvements to existing process –Interested participants draw lessons for any reconsideration of the Treaty in long term