Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck.

Slides:



Advertisements
Similar presentations
Institut für Verbundwerkstoffe GmbH Erwin-Schrödinger-Str Kaiserslautern Germany 1© Institut für Verbundwerkstoffe GmbH, N.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
MICRO VERTEX DETECTOR ZEUS experiment at DESY (HAMBURG) PROJECT SPECIFICATIONS : Design and production of a silicon Micro Vertex Detector (MVD) for the.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
CERN, the 9th of Nov FEA Updates on Structures (overall ID model) University of Geneva: G. Barbier, F. Cadoux, A. Clark, D. Ferrère, M. Weber.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Novel technologies and materials for thermal management
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
RF-Accelerating Structure: Cooling Circuit Modeling Riku Raatikainen
TALENT Initial Training Network ATLAB Annual Assembly EDUSAFE ITN and TALENT ITN joint technology workshop February 18 th 2013 Didier Ferrere.
1 IBL Integration Activities & Future plans  Overall FEA on Geneva (in convergence with Seattle)  News from IST Composite Design  Integration.
Tracker Support Tube Tracker EDR November 15th/16th 2000 M.Oriunno CERN/EP Tracker Support Tube Marco Oriunno CERN/EP Division on behalf of Tracker Integration.
1 VI Single-wall Beam Pipe tests M.OlceseJ.Thadome (with the help of beam pipe group and Michel Bosteels’ cooling group) TMB July 18th 2002.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
1 VI Single-wall Beam Pipe Option: status and plans M.Olcese TMB June 6th 2002.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
New R&D Directions Carl Haber ATLAS Tracker Upgrade Mechanical Meeting 11-Sept-2013.
FEM/CFD thermo-mechanical analyses on IBL Mock-up A. Sciuccati.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
PROTOTYPE January, 27 th 2016 Valery AKHNAZAROV Diego ALVAREZ Christophe BAULT Andrea CATINACCIO Daniel DOBOS Heinz PERNEGGER Danilo GIUGNI Eric VIGEOLAS.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
1 IST development status  Seattle  Composite Design.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
For the CMS Pixel detector
DT-LHCb coordination meeting 18 April 2016
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
CEA Validation tests and constraints
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Micro Vertex Detector of PANDA Strip Detector
Mechanics: (Tim).
WP9 ITS Mechanics and Cooling
Antti Onnela CERN – EP – Detector Technologies group
ALICE PD group meeting Andrea Francescon.
Super FGD - Target Design
CF testing pipe & testing plan
For the CMS Pixel detector
Presentation transcript:

Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck CADOUX (on behalf of Nigel HESSEY)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 2 What does WP4 stand for (reminder)? Status report on deliverables (Nikhef, Wuppertal, UniGe) Outlooks for the next 2 years and synergies between ESR? 20/11/2013 WP4: New mechanical integration methods within ATLAS Inner Tracker

Training for cAreer deveLopment in high-radiation ENvironment Technologies 3 20/11/2013 WP4: New mechanical integration methods within ATLAS Inner Tracker The main tasks to be covered The main tasks to be covered… Radiation length stave Radiation length to be lowered down to the…minimum! Optimization in weight, not only for supports (stave for instance) Material selection (CFRP, Carbon foam, glues, grease…), processes, and design Integration of the cooling system As a ultimate goal… Integration of the cooling system into the “support”(common philosophy in the Inner Tracker) Design pushed to the limit to take into account CTE mismatch… and keep the thermo mechanical stability Qualificationvery high radiation doses As shown yesterday, Qualification is mandatory for very high radiation doses (and for 10 years survival) Maintain the thermo mechanical properties after irradiation (Testing) engineering management Tools for engineering management (large project such as Upgrade Phase2) CAD exchanges using Smart team (or EDMS) at CERN (up to date MODELS) Bi tube stave (first IBL design…) IBL final stave

Training for cAreer deveLopment in high-radiation ENvironment Technologies 4 20/11/2013 WP4: New mechanical integration methods within ATLAS Inner Tracker The Partners, Group Leaders and positions The Partners, Group Leaders and positions… NIKHEF: NIKHEF: - Nigel HESSEY as group leader ESR7KoralCFRP structure - ESR7 (Koral) has started in mid February 2013 (CFRP structure and integrated cooling for PETAL) ESR9AfroditiCO2 cooling - ESR9 (Afroditi) has started beginning of January 2013 (focus on CO2 cooling system applied to the PETAL, perfect correlation with ESR7) WUPPERTAL: WUPPERTAL: - Peter MATTIG and Karl-Walter GLITZA ESR8 Mukundan - ESR8 (Mukundan) has started beginning of January 2013 (CFRP cooling pipes & mechanics… obvious links with NIKHEF group and others, focus on material characterization)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 5 20/11/2013 WP4: New mechanical integration methods within ATLAS Inner Tracker The Partners, Group Leaders and positions(Cont.) The Partners, Group Leaders and positions… (Cont.) GENEVA UNIVERSITY: GENEVA UNIVERSITY: - Giuseppe IACOBUCCI ER1 (Augusto) IBL integration team - ER1 (Augusto) has started beginning of February 2013 (IBL integration team, testing, FEA and CAD… works with S.Michal on the updating of the IBL overall CAD model) Composite Design Composite Design (Industrial partner): - Mr FAVRE / Mr BURQUI Secondments & training in CFRP processing (based on prepreg)… to be more involved in the next 2 years… For cigars …! For aerospace experiments! For Sauber_Mercedes (Formula 1)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 6 20/11/2013 WP4: New mechanical integration methods within ATLAS Inner Tracker The Partners, Group Leaders and positions(Cont.) The Partners, Group Leaders and positions… (Cont.) Composite Design Composite Design (Industrial partner): Over the last 2-3 years on IBL (and even earlier in ATLAS and others!), they produced quite a lot of pieces… see below. No limit…! Upgrade phase 2 In the Upgrade phase 2 context (super module for strips) IBL dummy IST

Training for cAreer deveLopment in high-radiation ENvironment Technologies 7 20/11/2013 Status report on deliverables &Milestones End cap IBL integration End cap Petal

Training for cAreer deveLopment in high-radiation ENvironment Technologies 8 20/11/2013 WP4: Status report on deliverables and Milestones ESR7& ESR9 combined in one common goal… Koral and Afroditi Cooling studies Cooling studies (ESR9) Optimize the cooling design for future particle detectors (applied to the PETAL)… Mechanical studies Mechanical studies (ESR7) Optimize the mechanical performances of support structures under high radiation environment (applied to the PETAL)… and inculding the cooling design (ESR9)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 9 20/11/2013 WP4: Status report on deliverables and Milestones End-Cap Space-Frame FEA modeling Geometric modifications Joint tests End-Cap Space-Frame FEA modeling Geometric modifications Joint tests Computer based model (FEA) of Petal Lab scale Experiments Modal analysis 3 & 4 point bend test Optimization of model to satisfy design criteria Stiffness vs. Thickness Opt. Carbon-fiber tests Carbon Foam tests Glue-Facesheet interface Manufacturing specimens Radiation hardness test Quality assurance for manufacturing standards Adapting FEA model to satisfy lab scale results Final Concept Design Prototyping Samples Milestone 1 Milestone 3Milestone 2 ESR7

Training for cAreer deveLopment in high-radiation ENvironment Technologies 10 20/11/2013 WP4: Status report on deliverables and Milestones ESR7 Milestones achieved by Koral up to now… Two different petal prototypes made at NIKHEF with different facesheet lay-ups. Analytic methods has been developed. Bending tests were performed on petal prototypes and samples… …leading to the FEA model validation (correlation with lab measurments)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 11 20/11/2013 WP4: Status report on deliverables and Milestones ESR9 Main objectives to be fulfilled by Afroditi CO2 cooling Implementation of CO2 cooling designs in light weight CFRP structures ESR8 FEA including the definition of thermal properties (heat transfer coeff, thermal expansion and orthotropic conductivities)… links with ESR8?? FEA validation FEA validation with prototypes…not an easy task! optimize the design When OK, use the FEA to optimize the design of future trackers

Training for cAreer deveLopment in high-radiation ENvironment Technologies 12 20/11/2013 WP4: Status report on deliverables and Milestones ESR9 Deliverables and Milestones achieved by Afroditi Prototype Prototype of PETAL including: heaters, dummy wafers, connector frame… CO2 Test set up is being prepared to measure the cooling performances of a PETAL proto thermal FEA …in order to validate the thermal FEA of the prototype (pre tests on simple parts)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 13 20/11/2013 WP4: Status report on deliverables and Milestones ESR8 in Wuppertal University… Mukundan CFRP cooling pipe and mechanics CFRP cooling pipe and mechanics (of general interest among IBL, PETAL… and others) Improving the transverse thermal conductivity of CFRP Thermo Mechanical FEA of CFRP (micro structure models) Research and qualification Research and qualification of high-pressure CFRP pipes

Training for cAreer deveLopment in high-radiation ENvironment Technologies 14 20/11/2013 WP4: Status report on deliverables and Milestones Face Plate 0 0 UniDirectional Face Plate 0 0 UniDirectional Python script to generate microstructure Python script to generate microstructure Milestones achieved by Mukundan up to now… Using a CFRP UD face plate Using a CFRP UD face plate… including some nano fillers and some perturbations… an FEM is generated in a microstructure scale… FEA which predicts the Elastic properties …leading to a first FEA which predicts the Elastic properties of the material (could be used in a macroscopic scale) Experimental tests Experimental tests are ongoing (along with thermal simulations)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 15 20/11/2013 WP4: Status report on deliverables and Milestones ER1 in University of Geneva… Augusto IBL Integration Testing, FEA, CAD drawings …including the updating of the IBL overall model As part of the engineering team… the range is large! Material and Design optimization (Catia V5) Structural and thermal analyses (FEA on Abaqus) Experimental tests (IBL thermal mock up) Design of components, and their integrations (IBL loading stand) Integration techniques (IPT, type 1 services…)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 16 20/11/2013 WP4: Status report on deliverables and Milestones Milestones and Deliverables achieved by Augusto up to now… The overall CAD model of IBL is released : The overall CAD model of IBL is released : IPT, Beam Pipe, Stave, Services, … everything stored in CERN Smart Team (including tools, jigs) IBL thermal Mockup IBL thermal Mockup is completed… Led to the validation of Beam pipe aerogel removal (Stave area, critical part)…and services extra length! FEA validation FEA validation still to be done (CFD in Abaqus)!

Training for cAreer deveLopment in high-radiation ENvironment Technologies 17 20/11/2013 WP4: Outlooks for the 2 years & possible synergies?? ESR9 Optimize the PETAL design in terms of radiation length ESR7 (based on validated FEA… combined effort with ESR7) Material study … links with ESR8?? Bi-phase cooling studies (CO2) Measure pressure drop along small tubes (CO2) ER1 Study convective heat loads in the Endcap (CFD and measurement?)…links with ER1?ESR7 Optimization on Validated FEA PETAL Model (further weight reduction) Research on specific field in CFRP (cracks propagation, honeycomb) Overall FEA on the End cap frame (structure) to estimate the PETAL stability and assembly techniques (Composite Design?)

Training for cAreer deveLopment in high-radiation ENvironment Technologies 18 20/11/2013 WP4: Outlooks for the 2 years & possible synergies?? ESR8 Experimental tests Experimental tests on samples to validate the FEA predictions (mechanics and thermo mechanics) Provide the thermo mechanical characteristics of CFRP layup (various kind of fibers, fillers…?) ESR7,9ER1 Participate in the global effort with ESR7,9 and ER1? Spread info?ER1 Complete the IBL integration (around April 2014) Complete the FEA on the IBL fluid dynamics (IBL Mock up) Start new developments for the Upgrade phase 2 (PIXEL, overall structures?)…in collaboration with others ESR? We clearly see some obvious links between ESR/ER (micro and macro structures, CFRP material, cooling,… skills on Abaqus and Catia V5). TBD