NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.

Slides:



Advertisements
Similar presentations
Waste Management System in Egypt Owner (Generator) Regulator RWM Operator Justification Minimization Segregation Transportati on Treatment Conditioning.
Advertisements

Nuclear Energy Chapter 12. Introduction to the Nuclear Process Fission – nuclear energy released when atom split, conventional technology Fusion – nuclear.
DOE Plans for Restarting Domestic Pu-238 Production
WNA SYMPOSIUM FUEL CYCLE MANAGEMENT, A UTILITY PERSPECTIVE Dominique DAPEI Nuclear Fuel International Affairs Director, EDF September 12th, 2013 PowerPoint.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
Progress on Cleanup of the INL Site for the INL Retired Employees Association Bob Iotti, President and CEO September 2008.
Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.
1 Commercial Spent Fuel Management By Thomas B. Cochran Natural Resources Defense Council Presented at the Meeting of the National Academy of Sciences.
The Nuclear Fuel Cycle. Presentation Components of the Fuel Cycle Front End Service Period (conversion of fuel to energy in a reactor) Back end Storage.
The Harnessed Atom Lesson Seven Waste from Nuclear Power Plants.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
1 Successful decommissioning of a nuclear plant Evelyn Hooft Bart Thieren 20 june 2008.
Nucular Waste A Technical Analysis Ian Baird 5/12/08.
Power Generation and Spent Fuel
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that no longer.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
CHEMISTRY TASIA MILLER. Nuclear: operated or powered by atomic energy Waste: to destroy or consume gradually Disposal: a disposing of or getting rid of.
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
Chapter 12 Nuclear Energy. Overview of Chapter 12 o Introduction to Nuclear Power Atoms and radioactivity Atoms and radioactivity o Nuclear Fission o.
 Benefits of Nuclear Energy  How Fission Works  Nuclear Power Plant Basics  Overview of Uranium Fuel Cycle  Energy Lifecycle of Nuclear Power  Generation.
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
The Nuclear Fuel Cycle Mary Lou Dunzik-Gougar, Ph.D. Idaho State University Idaho National Laboratory ANS Teachers’ Workshop at WM 2014 March 2014, Phoenix.
Nuclear Energy. A little review… Radioactive isotopes: Unstable isotopes that undergo radioactive decay: Spontaneous release of material and energy from.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Nuclear Waste Katherine Sanchez Navarro – General Supervisor Shannon McLaughlin – Historian Aleeza Momin – Biologist Rebecca Johnson – Chemist Shahzeb.
Nuclear Energy Wastes. What ways can we reduce the wastes produced in the reactor core. How can uranium be separated from Plutonium?
Fuel Cycle – High Level Waste Disposal
The Nuclear Fuel Cycle Dr. Okan Zabunoğlu Hacettepe University Department of Nuclear Engineering.
1 Regulating the Rest of the Nuclear Fuel Cycle Michael Weber, Director Office of Nuclear Material Safety and Safeguards NARUC Staff Subcommittee on Nuclear.
Geologic Resources: Nonrenewable Mineral and Energy Resources Chapters 14 & 15 G. Tyler Miller’s Living in the Environment Chapters 14 & 15 G. Tyler Miller’s.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
Nuclear Energy.
MODULE “PROJECT MANAGEMENT AND CONTROL” ORGANIZATION AND ADMINISTRATIVE CONTROL SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
National Spent Nuclear Fuel Strategy Meeting April 15, 2009 Dawn Gillas Federal Program Manager Nuclear Material Programs Division DOE-SR SRS Spent Nuclear.
Nuclear Fuel Cycle.  According to World Nuclear Association:  The nuclear fuel cycle is the series of industrial processes which involve the production.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
4/2003 Rev 2 I.4.9j – slide 1 of 18 Session I.4.9j Part I Review of Fundamentals Module 4Sources of Radiation Session 9jFuel Cycle – High Level Waste Disposal.
IAEA International Conference on Management of Spent Fuel
The Nuclear Fuel Cycle 1. NUCLEAR FUEL Nuclear fuel is the energy source of nuclear reactors and an essential element of the reactor core. The heat energy.
Repatriation of Vinča RA Reactor Spent Fuel The 15th International Symposium on the Packaging and Transportation of Radioactive Materials PATRAM
Nuclear Energy.
All Rights Reserved. Copyright © 2009, Hitachi-GE Nuclear Energy, Ltd. LWR Spent Fuel Management for the Smooth Deployment of FBR ICSFM (IAEA-CN-178) Paper.
The Nuclear Fuel Cycle Mary Lou Dunzik-Gougar, PhD ANS Teachers’ Workshop 2014.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
Nuclear power plantSpent nuclear fuel High level radioactive waste PlutoniumFast breeder reactor plutonium Reprocessing Uranium.
Chapter 12 Nuclear Energy
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
The Nuclear Fuel industry The nuclear fuel cycle.
The Uranium Fuel Cycle Robert Tsai November 21, 2006.
What do you know of Japan’s Nuclear crisis? How about any past nuclear issues? Do you feel that nuclear power is safe? Why or why not? Question of the.
THE NUCLEAR FUEL CYCLE. The Nuclear Fuel Cycle consists of sequence of steps in which U ore is mined, milled, enriched, and fabricated into nuclear fuel.
Nuclear Energy Chapter 12. Introduction to the Nuclear Process Fission – nuclear energy released when atom split Fusion – nuclear energy released when.
Radioactive Waste Management Infrastructure in Egypt:
Sosny Research and Development Company
Spent Fuel Management and Nuclear Materials (SFM&NM) July 2016 Update
Chapter 12 Nuclear Energy.
Chapter 12 Nuclear Energy.
Vermont Yankee Decommissioning Update
Management of Radioactive Waste
Mary Lou Dunzik-Gougar, PhD ANS Teachers’ Workshop 2013
Chapter 12 Nuclear Energy
Nuclear Energy.
Chapter 12 Nuclear Energy
Chapter 12 Nuclear Energy
Dr. Mitica Dragusin, Project Manager,
Presentation transcript:

NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION PLANT (Bosco Marengo - AL) FN INDUSTRIAL FUEL FABRICATION PLANT (Bosco Marengo - AL) EUREX PILOT REPROCESSING PLANT (ENEA - Saluggia Center) EUREX PILOT REPROCESSING PLANT (ENEA - Saluggia Center) ITREC PILOT REPROCESSING AND REFABRICATION PLANT (ENEA - Trisaia Center) ITREC PILOT REPROCESSING AND REFABRICATION PLANT (ENEA - Trisaia Center) PLUTONIUN PILOT FUEL FABRICATION PLANT OPEC POST IRRADIATION EXAMINATION FACILITY (ENEA -Casaccia Center) PLUTONIUN PILOT FUEL FABRICATION PLANT OPEC POST IRRADIATION EXAMINATION FACILITY (ENEA -Casaccia Center)

ITREC: pilot reprocessing and refabrication plant (U-Th fuel cycle) (ENEA - Trisaia Centre) ITREC: pilot reprocessing and refabrication plant (U-Th fuel cycle) (ENEA - Trisaia Centre) Main past activities: : reprocessing of Elk River spent fuel (U-Th) : development and testing of centrifugal contactors : solidification of liquid radioactive waste Main past activities: : reprocessing of Elk River spent fuel (U-Th) : development and testing of centrifugal contactors : solidification of liquid radioactive waste Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010: management of all radioactive waste produced during the past activities within 2016: decontamination and dismantling of the plant, management of the resulting material, free release of the site Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010: management of all radioactive waste produced during the past activities within 2016: decontamination and dismantling of the plant, management of the resulting material, free release of the site Main decommissioning issues: solidification of U-Th highly radioactive solution (reprocessing “final product”) dry storage of residual spent fuel in dual purpose casks decontamination and dismantling of equipment and hot cells Main decommissioning issues: solidification of U-Th highly radioactive solution (reprocessing “final product”) dry storage of residual spent fuel in dual purpose casks decontamination and dismantling of equipment and hot cells

OPEC : post irradiation examination facility (ENEA - Casaccia Centre) OPEC : post irradiation examination facility (ENEA - Casaccia Centre) Main past activities: : post-irradiation examination of metal uranium and uranium oxide spent fuels (up to 2000 Ci - 74 TBq) : spent fuel scraps encapsulation, hot cells decontamination Main past activities: : post-irradiation examination of metal uranium and uranium oxide spent fuels (up to 2000 Ci - 74 TBq) : spent fuel scraps encapsulation, hot cells decontamination Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010 : safe management of all radioactive waste and nuclear material produced during the past activities within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010 : safe management of all radioactive waste and nuclear material produced during the past activities within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site Main decommissioning issues: removal of spent fuel scraps management of residual radioactive waste final decontamination and dismantling Main decommissioning issues: removal of spent fuel scraps management of residual radioactive waste final decontamination and dismantling

PLUTONIUM: pilot fuel fabrication plant (ENEA - Casaccia Centre) PLUTONIUM: pilot fuel fabrication plant (ENEA - Casaccia Centre) Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010 : management of all radioactive waste and nuclear material produced during the past activities within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010 : management of all radioactive waste and nuclear material produced during the past activities within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site Main decommissioning issues: removal of residual nuclear material decontamination and dismantling of glove-boxes management of residual radioactive waste Main decommissioning issues: removal of residual nuclear material decontamination and dismantling of glove-boxes management of residual radioactive waste Main past activities: : process development (sol-gel) : fuel fabrication for AECL Chalk River reactor : liquid radioactive waste management Main past activities: : process development (sol-gel) : fuel fabrication for AECL Chalk River reactor : liquid radioactive waste management

EUREX: pilot reprocessing plant (ENEA - Saluggia Centre) EUREX: pilot reprocessing plant (ENEA - Saluggia Centre) Main past activities: : MTR (HEU) spent fuel reprocessing : CANDU spent fuel reprocessing : Pu nitrate-oxide conversion (via sol-gel) Main past activities: : MTR (HEU) spent fuel reprocessing : CANDU spent fuel reprocessing : Pu nitrate-oxide conversion (via sol-gel) Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010 : safe management of all radioactive waste produced during the past activities within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2010 : safe management of all radioactive waste produced during the past activities within 2016 : decontamination and dismantling of the plant, safe management of the resulting material, free release of the site Main decommissioning issues: solidification of all liquid radioactive waste dry storage of residual spent fuel in dual purpose casks decontamination and dismantling of equipment and hot cells Main decommissioning issues: solidification of all liquid radioactive waste dry storage of residual spent fuel in dual purpose casks decontamination and dismantling of equipment and hot cells

FN: industrial fuel fabrication plant (ENEA - Bosco Marengo) FN: industrial fuel fabrication plant (ENEA - Bosco Marengo) Main past activities: : fabrication of fuel assemblies for Italian and foreign LWR : preparatory works for decommissioning Main past activities: : fabrication of fuel assemblies for Italian and foreign LWR : preparatory works for decommissioning Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2004 : decontamination and dismantling of equipment, safe management of the resulting material within 2011 : controlled temporary storage "in situ" of radioactive waste, transfer to the national repository, free release of the site Main decommissioning milestones: (Ministry of Industry strategic guidelines) within 2004 : decontamination and dismantling of equipment, safe management of the resulting material within 2011 : controlled temporary storage "in situ" of radioactive waste, transfer to the national repository, free release of the site Main decommissioning issues: residual nuclear material removal decontamination and dismantling of equipment and buildings Main decommissioning issues: residual nuclear material removal decontamination and dismantling of equipment and buildings