1 Project Management Education The Define Phase. 2 Agenda Introductions Project Management Review The Concept Phase Project Initiation Stakeholders and.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

1 Bus 1040 Project Management Week 5 Bus 1040 Project Management Week 5 Agenda: Web presentations A Student handout Scheduling lecture, Network Diagrams,
A Short Course in Project Management
Facilitated by Joanne Fraser RiverSystems
CP Chapter 4 Schedule Planning.
Work Breakdown Structures
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Key Concepts: Definition of a Project Characteristics of a Project
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Advanced Project Management - CPH
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Chapter 10: Project Schedule Planning
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Importance of Project Schedules
What is a project? Project Management Institute definition
Chapter 3 Managing the Information Systems Project
Project Management Session 7
Project Management Education
Project Management Fundamentals Project Organization and Integration
Project Management Education
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
Chapter 3 : Managing the Information Systems Project.
How to integrate the parts of your project to achieve success.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Cristina MîndruţăSoftware Project Management Slide 1 Software Project Management Course 5.
Chapter 6: Project Time Management
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Appendix A Project Management: Process, Techniques, and Tools.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Advanced Project Management Project Time Management Ghazala Amin.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 5 Project Integration Management.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Chapter 3 Managing the Information Systems Project
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Project Time Management
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Project Management Fundamentals - Planning Tools 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
The Project Management Process Groups
Lecture 3 Part 1 Managing the Information Systems Project.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Project Management PTM721S
Chapter 3 Managing the Information Systems Project
Project Management – PTM721S
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Management Process Groups
Importance of Project Schedules
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

1 Project Management Education The Define Phase

2 Agenda Introductions Project Management Review The Concept Phase Project Initiation Stakeholders and Scope Definition How to Develop a Project Charter Wrap-up

3 Introductions Name Department Number of years at the company Number of projects you have managed Average size of project you have managed Course expectations Ice breaker

4 Ground Rules Level Playing Field (titles left at the door) One conversation at a time Respect opinions of others No beating a dead horse Come back from breaks ON TIME Have FUN

5 Course Objectives - to Understand: What is the Define Phase Design Documents and Requirements Specifications Project Planning Critical Path Analysis The Project Baseline

6 Student Objectives What are your objectives?

7 Brain Teaser VAD ERS

8 Project Management Review

9 Definitions A project is “a temporary endeavor undertaken to create a unique product or service” Project management is “the application of knowledge, skills tools and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project”

10 Characteristics of a Project Manager Communication skills Facilitation skills Leadership skills Organizational skills Negotiating skills Project Management Technical skills

11 Develop Concept Define Executing Processes Controlling Processes Deliver Plan developed for execution Plan is executed and Controlled As the execution is controlled, it may require additional planning Plan is successfully executed Plan and execution has been controlled Feedback in both directions Project or phase is approved in order to proceed Project Lifecycle

12 Scope Time Cost Risk Quality Human Resource Communications Procurement/Contract Project Integration 9 PMI PM Knowledge Areas

13 Triple Constraint As project managers, we are always trying to manage the constraints of product, schedule, and budget Schedule Budget Product … The “Triple Constraint”

14 The Concept Phase - Review Identified the Scope and Objectives Initiated the Project Analyzed Project Stakeholders Prepared High Level Estimates Created the Project Charter Did Initial Resource Planning

15 Brain Teaser NOXQQIVIT

16 The Define Phase

17 Design Documents Frequently specific design documents are necessary to guide the development of the project These design documents can specify physical products or logical (software) products The key to success is clear communication and understanding between customers and designers

18 Activities and Schedule Development

19 Activity Definition Activity definition involves identifying and documenting the specific activities that must be performed in order to produce the deliverables and sub- deliverables identified in the work breakdown structure. Implicit in this process is the need to define the activities such that the project objectives will be met. Outputs of Activity Definition: –Activity List - The activity list must include all activities which will be performed on the project. It should be organized as an extension to the WBS. –Supporting Detail - Supporting detail for the activity list should be documented and organized as needed to facilitate its use by other project management processes. Supporting detail should always include documentation of all identified assumptions and constraints. –WBS Updates - In using the WBS to identify which activities are needed, the project team may identify missing deliverables or corrections to the WBS.

20 Re-Roofing Project Activity List #Activity 1.1.1Measure Roof 1.1.2Calculate Materials 1.2.1Purchase Materials 1.2.2Take Delivery Remove Shingles Remove Nails Apply Shingles Cut Caps Apply Caps

21 Activity Sequencing Activity sequencing involves identifying and documenting interactivity dependencies. Activities must be sequenced accurately in order to support later development of a realistic and achievable schedule. Outputs of Activity Sequencing: –Project Network Diagram - A project network diagram is a schematic display of the project’s activities and the logical relationships (dependencies) among them. –Activity List Updates - In much the same manner that the activity definition process may generate updates to the WBS, preparation of the project network diagram may reveal instances where an activity must be divided or otherwise redefined in order to diagram the correct logical relationships.

22 Re-Roofing Project Network Diagram Measure Roof Calculate Materials Purchase Materials Take Delivery Remove Shingles Remove Nails Apply Shingles Apply Caps Cut Caps

23 Activity Duration Estimating Activity duration estimating involves assessing the number of work periods likely to be needed to complete each identified activity. The person or group on the project team who is most familiar with the nature of a specific activity should make, or at least approve, the estimate. This will often require consideration of elapsed time as well. Outputs of Activity Duration Estimating: –Activity Duration Estimates - Activity duration estimates are quantitative assessments of the likely number of work periods that will be required to complete an activity. They should always include some indication of the range of possible results (2 weeks +/- 2 days, or 8 to 12 days). –Basis of Estimates - Assumptions made in developing the estimates. –Activity List Updates - Updates to the activity list as discovered.

24 Re-Roofing Project Duration Estimates

25 Schedule Development Schedule development means determining start and finish dates for project activities. If the start and finish dates are not realistic, the project is unlikely to be finished as scheduled. The schedule development process must often be iterated. Outputs of Schedule Development: –Project Schedule - The project schedule includes at least planned start and expected finish dates for each detail activity. (Note: the project schedule remains preliminary until resource assignments have been confirmed.) –Supporting Detail - Supporting detail for the project schedule includes at least documentation of all identified assumptions and constraints. –Schedule Management Plan - A schedule management plan defines how changes to the schedule will be managed. It may be formal or informal, highly detailed or broadly framed based on the needs of the project. –Resource Requirement Updates - Resource leveling and activity list updates may have a significant effect on preliminary estimates of resource requirements.

26 Re-Roofing Project Schedule

27 Group Exercise Create Project Network Diagram for the Buying a Car Project Exercise –Activity List –Project Network Diagram –Present results

28 Brain Teaser EMPLOYMENT

29 Project Schedule - GANTT Chart

30 Project Plan Development Project plan development uses the outputs of the other planning processes to create a consistent, coherent document that can be used to guide both project execution and project control. This process is almost always iterated several times. The project plan is used to: –Guide project execution –Document project planning assumptions –Document project planning decisions regarding alternatives chosen –Facilitate communication among stakeholders –Define key management reviews as to content, extent, and timing –Provide a baseline for progress measurement and project control Outputs of Project Plan Development: –Project Plan - The project plan is a formal, approved document used to manage and control project execution. The final Project Charter with project schedule, organization, resources, budget and other attachments is the project plan.

31 Project Plan Development Review

32 Brain Teaser arrest you’re

33 Critical Path

34 Determine Critical Path of Project Plan Critical Path - “The series of activities that determines the duration of a project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project. ” (PMBOK)

35 Roofing Network Logic Diagram

36 Early Start (ES) - “...the earliest possible point in time on which the uncompleted portions of an activity (or project) can start, based on the network logic and any schedule constraints. Early start dates can change as the project progresses and changes are made to the project plan.” (PMBOK) Early Finish (EF) - “...the earliest possible point in time on which the uncompleted portions of an activity (or project) can finish, based on the network logic and any schedule constraints. Early finish dates can change as the project progresses and changes are made to the project plan.” (PMBOK) Determining Critical Path - Key Terms

37 Late Start (LS) - “...the latest possible point in time that an activity may begin without delaying a specified milestone (usually the project finish date).” (PMBOK) Late Finish (LF) - “...the latest possible point in time that an activity may be completed without delaying a specified milestone (usually the project finish date).” (PMBOK) Total Float (TF) - “The amount of time that an activity may be delayed from its early start without delaying the project finish date. Float is a mathematical calculation, and can change as the project progresses and changes are made to the project plan. Also called slack, total float, and path float.” (PMBOK) Determining Critical Path - Key Terms

38 Illustration of Terms Cooking a 20 pound turkey for Thanksgiving dinner Know turkey must be thawed by 1pm Thursday, Thanksgiving day Once turkey is thawed, must put in oven within 24 hours Two options to thaw turkey: –Thaw in refrigerator: 1 day for every 4 pounds (total of 5 days) –Thaw in cold water changed every 30 minutes: 30 minute minimum per pound (total of 10 hours)

39 Illustration of Terms Question- in order to have the turkey completely thawed by 1pm Thursday, what is the Early Start, Early Finish, Late Start, Late Finish, and Total Float?

40 Illustration of Terms Late Finish – know is 1pm Thanksgiving Day Late Start – minimum time to thaw is 10 hours so latest start is 3am Thanksgiving morning Early Finish – have 24 hours from time thawed to put in oven; early finish for thaw would be 1pm Wednesday Early Start – longest time to thaw is 5 days; early start would be 5 days prior to 1pm Wednesday or 1pm on the previous Friday Total Float – from 1pm Friday to 3am Thursday or 5 days and 14 hours

41 ES-EF/LS-LF Calculations ES = Previous ES + Previous duration EF = ES + task duration - 1 LF = previous LF - previous task duration (working backwards through the NLD) LS = LF - task duration +1 Total Float (TF) = ES - LS Critical Path = path where TF = 0

42 Baseline Project plan Baseline Project Plan - “The original approved plan (for a project, a work package, or an activity), plus or minus approved scope changes. Usually used with a modifier (e.g., cost baseline, schedule baseline, performance measurement baseline). ” (PMBOK) Not etched in stone Living document Understand purpose of what MS project is showing you Different types of baseline (schedule, cost)

43 S Curve Example

44 Brain Teaser

45 Final Exercise

46 Class Wrap-Up

47 Course Objectives - Review What is the Define Phase Design Documents and Requirements Specifications Project Planning Critical Path Analysis The Project Baseline

48 Wrap Up Student Objectives Did we meet your objectives?

49  /  Chart What was good about the class? What could be improved? What could be changed to make the class better?

50 Thank You! Please fill out the class evaluation and give it to the instructor before you leave!