1 1 Slide Just-in-Time and Lean Production Systems Professor Ahmadi.

Slides:



Advertisements
Similar presentations
1 Just-in-Time/Lean Production A repetitive production system in which the processing and movement of materials and goods occur just as they are needed!
Advertisements

CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
JIT, TPS, and Lean Operations
Just-In-Time and Lean Systems
Just-in-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Just-in-Time and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
© 2008 Prentice Hall, Inc.16 – 1 Operations Management Chapter 16 – JIT and Lean Operations PowerPoint presentation to accompany Heizer/Render Principles.
JIT/Lean Production. ©2006 Pearson Prentice Hall — Introduction to Operations and Supply Chain Management — Bozarth & Handfield Chapter 15, Slide 2 Some.
Just-in-Time and Lean Operations
© 2006 Prentice Hall, Inc.16 – 1 Operations Management Just-in-Time and Lean Production Systems Just-in-Time and Lean Production Systems © 2006 Prentice.
JIT/Lean Operations Good production systems require that managers address three issues that are pervasive and fundamental to operations management: eliminate.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S Inventory Management - 60 Min 2. JIT - 30 Min 3. Case Discussion - 30 Min 4. “Final” Problems - 60 Min Agenda:
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Lean and Sustainable Supply Chains. 1. Describe how Green and Lean can complement each other. 2. Explain how a production pull system works. 3. Understand.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in-Time and Lean Production Systems
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
Just-In-Time & Lean Systems
JIT and Lean Operations
16 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall 16 JIT and Lean Operations PowerPoint presentation to accompany Heizer and Render Operations.
Just-in-Time and Lean Systems
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 24 1.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 25 1.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
“Without the Cost of Waste …”
Lean Production and the Just-in-Time Philosophy. Lean Production Elimination of All Waste – Waste is Anything that Does Not Add Value to Product. Continuous.
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 Slides used in class may be different from slides in student pack Chapter 12 Lean/Just-in-Time (JIT) Production  JIT Defined  The Japanese Approach.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Lecture 28 Just-in-Time Manufacturing (Continued)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
© The McGraw-Hill Companies, Inc., Just-in-Time and Lean Systems.
EMBA-2, BUP EO Just-in-Time / Lean Production.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
16 - 1© 2011 Pearson Education 16 JIT, Lean Operations, and the Toyota Production System PowerPoint presentation to accompany Heizer and Render Operations.
Lean Production Just in time - It originally referred to the production of goods to meet customer demand exactly, in time quality and quantity, whether.
JIT and Lean Operations
Slide 16.1 Just-In-Time & Waste Reduction. Slide 14.2 What is Just-in-Time?   Management philosophy of continuous and forced problem solving  are needed.
Operations Management
Just-In-Time and Lean Production
Just-in-Time and Lean Operations
Chapter 16 JIT, TPS, and Lean Operations.
Operations Management
Presentation transcript:

1 1 Slide Just-in-Time and Lean Production Systems Professor Ahmadi

2 2 Slide Waste is anything other than the minimum amount of equipment, materials, parts, space, and worker’s time, which are absolutely essential to add value to the product. Shoichiro Toyoda President, Toyota President, Toyota Introductory Quotation

3 3 Slide n Overproduction n Waiting n Transportation n Inefficient processing n Inventory n Unnecessary motion n Product defects Types of Waste

4 4 Slide n Management philosophy of continuous and forced problem solving n Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed. What Does Just-in-Time Do? n Attacks waste Anything not adding value to the productAnything not adding value to the product  From the customer’s perspective n Exposes problems and bottlenecks caused by variability Deviation from optimumDeviation from optimum n Achieves streamlined production By reducing inventoryBy reducing inventory What is Just-in-Time?

5 5 Slide Push versus Pull n Push system: material is pushed into downstream workstations regardless of whether resources are available n Pull system: material is pulled to a workstation just as it is needed

6 6 Slide n Suppliers reduced number of vendorsreduced number of vendors supportive supplier relationshipssupportive supplier relationships quality deliveries on timequality deliveries on time n Layout work-cell layouts with testing at each step of the processwork-cell layouts with testing at each step of the process movable, changeable, flexible machinerymovable, changeable, flexible machinery high level of workplace organization and neatnesshigh level of workplace organization and neatness reduced space for inventoryreduced space for inventory delivery direct to work areasdelivery direct to work areas JIT Contribution to Competitive Advantage

7 7 Slide n Inventory small lot sizessmall lot sizes low setup timeslow setup times specialized bins for holding set number of partsspecialized bins for holding set number of parts n Scheduling zero deviation from scheduleszero deviation from schedules level scheduleslevel schedules suppliers informed of schedulessuppliers informed of schedules Kanban techniquesKanban techniques JIT Contribution to Competitive Advantage - Continued

8 8 Slide JIT Contribution to Competitive Advantage - Continued n Preventive Maintenance scheduledscheduled daily routinedaily routine operator involvementoperator involvement n Quality Production statistical process controlstatistical process control quality by suppliersquality by suppliers quality within firmquality within firm

9 9 Slide JIT Contribution to Competitive Advantage - Continued n Employee Empowerment empowered and cross-trained employeesempowered and cross-trained employees few job classifications to ensure flexibility of employeesfew job classifications to ensure flexibility of employees training supporttraining support n Commitment support of management, employees, and supplierssupport of management, employees, and suppliers

10 Slide Results n Queue and delay reduction, speedier throughput, freed assets n Quality improvement, reduces waste and wins orders n Cost reduction which reduces selling price n Variability reductions in the workplace reduces waste n Rework reduction, reduces waste and wins orders n Faster response to the customer at lower cost and higher quality, which leads to: A competitive advantage !

11 Slide Suppliers Preventive Maintenance Layout Inventory Scheduling Quality Employee Empowerment JIT Just-in-Time Success Factors

12 Slide Goals of JIT Partnership with Suppliers n JIT partnerships eliminate Unnecessary activitiesUnnecessary activities In - plant inventoryIn - plant inventory In - transit inventoryIn - transit inventory Poor suppliersPoor suppliers Suppliers

13 Slide Goals of JIT partnerships  Elimination of unnecessary activities  Elimination of in-plant inventory  Elimination of in-transit inventory  Elimination of poor suppliers

14 Slide n Diversification n Poor customer scheduling n Frequent engineering changes n Quality assurance n Small lot sizes n Physical proximity Concerns of Suppliers

15 Slide n JIT objective: Reduce movement of people and material Movement is waste!Movement is waste! n JIT requires Work cells for product familiesWork cells for product families Moveable or changeable machinesMoveable or changeable machines Short distancesShort distances Little space for inventoryLittle space for inventory Delivery directly to work areasDelivery directly to work areas Layout

16 Slide n Traditional: inventory exists in case problems arise n JIT objective: eliminate inventory n JIT requires Small lot sizesSmall lot sizes Low setup timeLow setup time Containers for fixed number of partsContainers for fixed number of parts n JIT inventory: Minimum inventory to keep system running Inventory

17 Slide Lot Size Example (See page 635 of your textbook) D=Annual demand = 400,000 units d=Daily demand = 400,000/250 = 1,600 per day p=Daily production rate = 4,000 units Q=EOQ desired = 400 H=Holding cost = $20 per unit S=Setup cost (to be determined) Q = 2DS H (1 - d/p ) Q2 =Q2 =Q2 =Q2 =2DS S = = = $2.40 ( Q 2 )( H )(1 - d/p ) 2 D (3,200,000)(0.6)800,000

18 Slide JIT Inventory Tactics n Use a pull system to move inventory n Reduce lot size n Reduce setup time n Develop Just-in-Time delivery systems with suppliers n Deliver directly to point of use n Perform-to-schedule n Reduce setup time

19 Slide JIT Scheduling Tactics n Communicate the schedule to suppliers n Make level schedules n Perform to schedule n Eliminate waste n Produce in small lots n Use kanbans n Make each operation produce a perfect part

20 Slide n Japanese word for card Pronounced ‘kahn-bahn’ (not ‘can-ban’)Pronounced ‘kahn-bahn’ (not ‘can-ban’) n Authorizes production from downstream operations ‘Pulls’ material through plant‘Pulls’ material through plant n May be a card, flag, verbal signal etc. n Used often with fixed-size containers Add or remove containers to change production rateAdd or remove containers to change production rate Kanban

21 Slide Kanban: Additional Points n When producer and user are not in visual contact, a card may be used; otherwise, a light, flag, or empty spot on the floor may work. n Because a pull station may require several re-supply components, several Kanban pull techniques can be used at the same station. n Usually, each card controls a specific quantity of parts, although multiple card systems can be used if the producing cell produces several components or the lot size is different from the move size. n In an MRP system, the schedule can be thought of as a “build” authorization and the Kanban as a type of “pull” system that initiates the actual production.

22 Slide Kanban: Additional Points - Continued n The Kanban cards provide direct control (limit) on the amount of work-in-process between cells. n If there is an intermediate storage area, a two-card system may be used; one card circulates between user and storage area, and the other circulates between the storage area and the producing area.

23 Slide The Number of Cards or Containers  Need to know the lead time needed to produce a container of parts  Need to know the amount of safety stock needed Number of kanbans = Demand during Safety lead time+stock Size of container

24 Slide Number of Kanbans Example (See page 640 of your textbook) Daily demand =500 cakes Production lead time =2 days (wait time + material handling time + processing time) Safety stock =1/2 day Container size =250 cakes Demand during lead time = 2 days x 500 cakes = 1,000 Number of kanbans = = 5 1,

25 Slide n JIT reduces inventory n JIT limits number defects with small lots n JIT requires TQM Statistical process controlStatistical process control Worker involvementWorker involvement  Inspect own work  Quality circles Immediate feedbackImmediate feedback Quality

26 Slide JIT Quality Tactics n Use statistical process control n Empower employees n Build failsafe methods (checklists, etc.) n Provide immediate feedback

27 Slide n Get employees involved in product & process improvements Employees know job best!Employees know job best! n JIT requires EmpowermentEmpowerment Cross-trainingCross-training Training supportTraining support Few job classificationsFew job classifications Employee Empowerment

28 Slide Lean Production Lean Production supplies customers with exactly what the customer wants, when the customer wants, without waste, through continuous improvement.

29 Slide Attributes of Lean Producers n use JIT to eliminate virtually all inventory n build systems to help employees produce a perfect part every time n reduce space requirements n develop close relationships with suppliers n educate suppliers n eliminate all but value-added activities n make jobs more challenging n reduce the number of job classes and build worker flexibility