1 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in.

Slides:



Advertisements
Similar presentations
Agenda of Week X. Layout Capacity planning Process selection Linebalancing Review of week 9 13 Approaches Purposes : Finishing the capacity planning Understanding.
Advertisements

WAREHOUSING MANAGEMENT
TOPIC :CAPACITY AND FACILITIES
CAPACITY MANAGEMENT CHAPTER 10 DAVID A. COLLIER AND JAMES R. EVANS.
Process Selection and Facility Layout
10-1 Chapter 10 Facilities Layout and Location McGraw-Hill/Irwin Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
FACILITY AND WORK DESIGN
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
Location Strategy and Layout Strategy
INTRODUCTION TO BUSINESS
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
1 Facility Layout. 2 What Is Layout Planning Layout planning is determining the best physical arrangement of resources within a facility Two broad categories.
Operations Management
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Layout Strategy. Introduction What – Layout Decisions Where – For efficiency or customer appeal Why – Improve Profitability.
Process Selection and Facility Layout
Process Selection and Facility Layout
Session Pooja patnaik.
Facility layout Types of layout Mathematical models/algorithms
Process Selection and Facility Layout
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Operations Management
OPERATIONS SCHEDULING AND SEQUENCING
FACILITY AND WORK DESIGN
Chapter 10 – Facility Layout
Layout Strategy.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection Facilities Layout Line Balancing.
Facility Design and Layout
22/04/2017 Process selection.
Chapter 10 – Facility Layout
Chapter 9 : Layout Strategies
Chapter 4 Process Design.
Facility Layout Chapter 10 pages , ,
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
McGraw-Hill/Irwin.
© Wiley 2007 Chapter 10 Facility Layout. © Wiley 2007 OUTLINE What Is Layout Planning? Types of Layouts Designing Process Layouts Special Cases of Process.
Chapter 10 – Facility Layout Operations Management by R. Dan Reid & Nada R. Sanders 2 nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough -
OM2 FACILITY AND WORK DESIGN CHAPTER 8 DAVID A. COLLIER AND
Principles of Plant Layout 1. Principle of integration: A good layout is one that integrates men, materials, machines and supporting services and.
OPERATIONS & TECHNOLOGY MANAGEMENT (JMP 5023)
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 14 Operations Management: Managing Vital Operations.
Chapter 6 Facilities Layout.
Chap 4 - Facility Layout: Manufacturing and Services.
Manufacturing and Service Processes
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6 Process Selection and Facility Layout. 6-2 Learning Objectives  Explain the strategic importance of process selection.  Describe the basic processing.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 8 Facility Layout.
Part 3.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 6 Process Selection and Facilities Layout.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Facility Layout Chapter 10 pages , ,
Chapter 3 MANAGING THE TRANSFORMATION PROCESS
An Integrated Goods and Services Approach
UNIT-III Operations Management PREPARED BY CH. AVINASH.
Cellular Layouts Cellular Production Group Technology
Process Selection and Facility Layout
What is Facility Layout?  The layout facility is the physical location of the various departments/units of the facility within the premises of the facility.
FACILITY LAYOUT Facility layout means:
Process Selection and Facility Layout
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Facilities Planning and Design Course code:
Departmental Planning
Process Selection and Facility Layout
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

1 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. FACILITY AND WORK DESIGN CHAPTER 8 DAVID A. COLLIER AND JAMES R. EVANS

2 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN 8-1 Describe four layout patterns and when they should be used. 8-2 Explain how to design product layouts using assembly line balancing. 8-3 Explain the concepts of process layout. 8-4 Describe issues related to workplace design. 8-5 Describe the human issues related to workplace design.

3 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN V ytec ( is a leading manufacturer of vinyl siding for homes and businesses. Vytec makes 50 different product lines (called profiles) of siding, soffits, and accessories. Each profile is typically produced in 15 colors, creating 750 stock- keeping units. The finished siding is packaged in a carton that holds 20 pieces that is usually 12 feet long. The cartons are stacked in steel racks (called beds). Each bed holds 30 to 60 cartons, depending on the bed’s location in the warehouse. Vytec’s main warehouse is more than 200,000 square feet.

4 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Chapter Introduction (continued) Over time, demand for each siding profile changes, and some are added and some are discontinued. One problem the warehouse faces periodically is the need to redo the location and capacity of beds in the warehouse. Using basic layout principles, high- demand siding profiles are located closest to the shipping dock to minimize travel and order-picking time. Although management would like to find a permanent solution to this stock placement problem in the warehouse, the continuous changes in demand and product mix necessitate a new design every few years.

5 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Think of a facility in which you have conducted business—for instance, a restaurant, bank, or automobile dealership. How did the physical environment and layout enhance or degrade your customer experience? What do you think?

6 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout Facility layout refers to the specific arrangement of physical facilities. Facility-layout studies are necessary whenever: 1.a new facility is constructed, 2.there is a significant change in demand or throughput volume, 3.a new good or service is introduced to the customer benefit package, or 4.different processes, equipment, and/or technology are installed.

7 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN

8 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout Purposes of layout studies are to: minimize delays in materials handling and customer movement. maintain flexibility. use labor and space effectively. promote high employee morale and customer satisfaction. provide for good housekeeping and maintenance. enhance sales as appropriate in manufacturing and service facilities.

9 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout A product layout is an arrangement based on the sequence of operations that are performed during the manufacturing of a good or delivery of a service. Examples: Winemaking industry, credit card processing, Subway sandwich shops, paper manufacturers, insurance policy processing, and automobile assembly lines.

10 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.1 Product Layout for a Wine Manufacturer

11 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout Product Layout Advantages: Lower work-in-process inventories, shorter processing times, less material handling, lower labor skills, and simple planning and control systems. Disadvantages: A breakdown at one workstation can cause the entire process to shut down; a change in product design or the introduction of new products may require major changes in the layout, limiting flexibility.

12 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout A process layout consists of a functional grouping of equipment or activities that do similar work. Examples: Legal offices, shoe manufacturing, jet engine turbine blades, and hospitals use a process layout.

13 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.2 Process Layout for a Machine Shop

14 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout Process Layout Advantages: A lower investment in equipment, the diversity of jobs inherent in a process layout can lead to increased worker satisfaction. Disadvantages: High movement and transportation costs, more complicated planning and control systems, longer total processing time, higher in- process inventory or waiting time, and higher worker-skill requirements.

15 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout In a cellular layout, the design is not according to the functional characteristics of equipment, but rather by self-contained groups of equipment (called cells), needed for producing a particular set of goods or services. Examples: Legal services such as labor law, bankruptcy, divorce; medical specialties such as maternity, oncology, surgery.

16 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.3 Cellular Manufacturing Layout

17 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout Cellular Layout Advantages: Reduced materials-handling requirements, quicker response to quality problems, more efficient use of floor space, more worker responsibility increasing morale. Disadvantages: Duplication of equipment among cells, greater worker skills requirements.

18 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout A fixed-position layout consolidates the resources necessary to manufacture a good or deliver a service, such as people, materials, and equipment, in one physical location. Examples: The production of large items such as heavy machine tools, airplanes, buildings, locomotives, and ships. Service-providing examples include major hardware and software installations, sporting events, and concerts.

19 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Fixed-Position Layout Advantages: Work remains stationary, reducing movement. Disadvantages: High level of planning and control required.

20 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.4 Comparison of Basic Layout Patterns

21 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Facility Layout in Service Organizations Service organizations use product, process, cellular, and fixed-position layouts to organize different types of work.  Examples: Libraries, hospitals, insurance companies Product Layout—Service organizations that provide highly standardized services tend to use product layouts.  Examples: Restaurant kitchens Process Layout—Services that need the ability to provide a wide variety of services to customers with differing requirements usually use a process layout.

22 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.5 Product Layout for a Pizza Kitchen

23 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Designing Product Layouts Product layouts in flow shops generally consist of a fixed sequence of workstations separated by buffers (queues of work-in-process). Flow-blocking delay occurs when a work center completes a unit but cannot release it because the in-process storage at the next stage is full. The worker must remain idle until storage space becomes available. Lack-of-work delay occurs whenever one stage completes work and no units from the previous stage are awaiting processing.

24 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.6 A Typical Manufacturing Workstation Layout

25 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Designing Product Layouts An assembly line is a product layout dedicated to combining the components of a good or service that has been created previously.  Examples: Automobile assembly, Subway sandwich shops, insurance policy processing Assembly line balancing is a technique to group tasks among workstations so that each workstation has—in the ideal case—the same amount of work.

26 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly-Line Balancing Required information: 1.The set of tasks to be performed and the time required to perform each task. 2. The precedence relations among the tasks — that is, the sequence in which tasks must be performed. 3. The desired output rate or forecast of demand for the assembly line.

27 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN One workstation: In an eight-hour day, could produce (1 part/1.0 min)(60 minutes per hour)(8 hours per day) = 480 parts/day Three workstation s (one for each task): The first operator can produce 120 parts per hour, or 960 parts/day. The second could produce 1,600 parts/day. The third operator can produce 2,400 parts/day. Maximum output is 960 parts/day. Two workstations (A/BC): Since each operator needs 0.5 minute to perform the assigned duties, the line is in perfect balance, and 960 parts per day can be produced. Exhibit 8.7 A Three-Task Assembly Line

28 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly-Line Balancing Cycle time is the interval between successive outputs coming off the assembly line. In the previous example, with one workstation, the cycle time is 1 minute; that is, one completed assembly is produced every minute. If two workstations are used, the cycle time is 0.5 minute/unit. If three workstations are used, the cycle time is still 0.5 minute/unit, because task A is the bottleneck, or slowest operation. The line can produce only one assembly every 0.5 minute.

29 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly-Line Balancing Cycle time (CT) is related to the output (R) by the following equation: CT = A/R [8.2] A = available time to produce the output. The output (R) is normally the demand forecast in units, adjusted for on-hand inventory if appropriate, or orders released to the factory. Both A and R must have the same time units of measure (hour, day, week, month, and so on).

30 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly-Line Balancing Minimum number of workstations required = Sum of task times/Cycle time =  t/CT [8.3] Total Time Available = (Number of work stations)×(Cycle Time) = (N )(CT ) [8.4] Total Idle Time = (N )(CT ) −  t [8.5] Assembly-line Efficiency =  t/(N × CT ) [8.6] Balance Delay = 1 − Assembly-line Efficiency [8.7]

31 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly-Line Balancing Line balancing approaches use decision rules, or heuristics, to assign tasks to workstations to attempt to minimize the amount of idle time at workstations, but do not guarantee optimal solutions. Examples:  Assign the task with the longest task time first to a workstation if the cycle time would not be exceeded.  Assign the shortest task first.

32 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly-Line Balancing Solved Problem

33 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.8 A Typical In-Line Skate

34 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.9 Precedence Network and Workstation Assignment

35 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly Line Balance for In-Line Skate WorkstationTasks Total Time Idle Time A1, 2, B3, 4, 6, 7, Total Using equations [8.4] to [8.6] we may compute the following: Total Time Available = (Number workstations)(Cycle Time) = (N )(CT ) = (2)(6) = 12 minutes Total Idle Time = (N )(CT ) −  t = (2)(6) = 2.6 minutes Assembly-line Efficiency =  t/(N × CT ) = 9.4/(2 × 6) = 78.3%

36 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Designing Process Layouts Arrangement of departments or work centers to minimize costs associated with material movement or maximizing “closeness ratings” between departments. Software packages:  CRAFT  ALDEP  CORELAP

37 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Workplace Design Key Questions: 1.Who will use the workplace? Will the workstation be shared? How much space is required? 2.How will the work be performed? What tasks are required? How much time does each task take? How much time is required to set up for the workday or for a particular job? How might the tasks be grouped into work activities most effectively?

38 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Workplace Design Key Questions: 3.What technology is needed? Employees may need a computer or access to customer records and files, special equipment, intercoms, and other forms of technology. 4.What must the employee be able to see? 5.What must the employee be able to hear? 6.What environmental and safety issues need to be addressed?

39 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Exhibit 8.10 Pizza Preparation Workplace Design

40 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Workplace Design Safety and the work environment:  The job should be designed so that it will be highly unlikely that a worker can injure himself or herself.  The worker must be educated in the proper use of equipment and the methods designed for performing the job.  The surrounding environment must be conducive to safety. Ergonomics is concerned with improving productivity and safety by designing workplaces, equipment, instruments, computers, workstations, and so on that take into account the physical capabilities of people.

41 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN

42 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN The Human Side of Work A job is the set of tasks an individual performs. Job design involves determining the specific job tasks and responsibilities, the work environment, and the methods by which the tasks will be carried out to meet the goals of operations. Job enlargement is the horizontal expansion of the job to give the worker more variety—although not necessarily more responsibility. Job enrichment is vertical expansion of job duties to give the worker more responsibility.

43 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Teams Natural work teams, which perform entire jobs, rather than specialized, assembly-line work Virtual teams, in which members communicate by computer, take turns as leaders, and join and leave the team as necessary Self-managed teams (SMTs), which are empowered work teams that also assume many traditional management responsibilities

44 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN

45 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN BankUSA: Cash Movement Case Study 1.What is the best way to group the work represented by the 16 work groups for an average demand of 306 outgoing wires per day? What is your line balance if peak demand is 450 wires per day? What is assembly- line efficiency for each line balance solution? 2.How many people are needed for outgoing wires using assembly line balancing methods versus the current staffing level of 11 full-time equivalent employees? 3.How many staff members do you need for the outgoing wire process if you eliminate all rework? 4.What are your final recommendations?

46 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly Line Homework Problems

47 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly Line Homework Problems

48 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Assembly Line Homework Problems

49 ©2013 OM4 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part. CHAPTER 8 FACILITY AND WORK DESIGN Extra Slide