Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.

Slides:



Advertisements
Similar presentations
State Grants For California Airports Gwyn Reese, Aviation Funding Specialist Caltrans - Division of Aeronautics September 2006.
Advertisements

US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® COL Richard P. Pannell District Commander, Galveston District U.S. Army Corps of Engineers United States Army.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Corps of Engineers BUILDING STRONG ® Dam Safety Modification Studies Robert Taylor, P.E. Dam Safety Program Manager Great Lakes and Ohio River Division.
AIWW Deep Creek Bridge Replacement Information Update
US Army Corps of Engineers BUILDING STRONG ® West Onslow Beach/ Topsail Beach West Onslow Beach/ Topsail Beach Coastal Storm Damage Reduction Project Town.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Engineer Circular Requests to Alter USACE Projects
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Subrecipient Monitoring. A formal binding legal agreement between your institution and another legal entity A portion of your sponsored project's.
Module 5 Civil Works Orientation Course - FY 11. Civil Works Project Delivery Process Step 10 Division Engineer's Transmittal Letter Step 6 Negotiate.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® Project Planning with the U.S. Army Corps of Engineers (USACE) Presenter Name Presenter Title.
1 Database and Water Supply Study Presented by: Ted Hillyer Institute for Water Resources Wilmington, NC November 4-6, 2003 Water Supply Workshop Falls.
Dam Safety Program Management and Organization
Module 25 STEPS 20 & 21 CONSTRUCTION and OPERATION & MAINTENANCE Civil Works Orientation Course - FY 11.
Civil Works Orientation Course - FY 11. Objectives: This module will discuss: District Quality Control (DQC) Agency Technical Review (ATR) Independent.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
SMART Feasibility Study Process
Module 12 STEPS 6 & 7 Negotiation of PMP/FCSA and Execution of Feasibility Cost Sharing Agreement Civil Works Orientation Course - FY 11.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration Review Processes Module 22 STEPS 11, 12, 13 & 14 Washington Level and Administration.
Module 9 STEP 2 Congressional Study Resolution/ Authorization Civil Works Orientation Course - FY 11.
Module 10 Step 3 Initial Study Funding (incl. Civil Works Budget Process) Civil Works Orientation Course - FY 11.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Module 29 Interagency & International Support Program Civil Works Orientation Course - FY 11.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
CREDIT TO POWER MARKETING AGENCIES Jan Hotubbee, CESWT-PE-P To insert your company logo on this slide From the Insert Menu Select “Picture” Locate your.
BUILDING STRONG ® Southern California Water Dialogue Ed T. de Mesa Chief, Plan Formulation Branch Planning Division Los Angeles District US Army Corps.
Module 20 STEP 10 Division Engineer’s Transmittal Letter
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
US Army Corps of Engineers BUILDING STRONG ® Planning Principles & Procedures – FY11 AUTHORIZATION AND APPROPRIATION OR “It Takes Two to Tango"
Napa Salt Marsh Restoration Project 2010 Status Update.
US Army Corps of Engineers BUILDING STRONG ® Planning Products & Milestones Planning Principles & Procedures – FY11.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
Planning for Non-Routine Activities
What Can Possibly Go In The Civil Works Process? Module 28 Civil Works Orientation Course - FY 11.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Request to Alter USACE Projects
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS TRANSFORMATION: SMART PLANNING AND RESCOPING CHARETTES.
1 DELEGATIONS & PROCESSING  Delegations  Processing  Common Issues – Problems  Unique Situations / Future Attractions Steve Cone (CECW-PC) SAD Water.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.
2 West Sacramento, California Project General Reevaluation Report Letter of Support for the West Sacramento General Reevaluation Report Agenda Item 4G:
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
1 Hydraulic and Hydrologic Considerations in Planning.
US Army Corps of Engineers BUILDING STRONG ® OVERVIEW OF THE CIVIL WORKS PROCESS Planning Principles & Procedures – FY 11.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
2016 NSF Large Facilities Workshop New Initiatives Business Roundtable II-III May 25-26, 2016 Jeff Lupis, Division Director, Division of Acquisition and.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
COMPREHENSIVE EVERGLADES RESTORATION PLAN …different cultures -- same Team.
Mahoning County Informational Meeting USACE Programs, Authorities, and Ohio Silver Jackets Program Presented by: Ashley Stephens 16 August 2016.
TechStambha PMP Certification Training
Lesson 4 Systems Engineering Plan Exercise Team #
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Partnering with U.S. Army Corps of Engineers
Module 27 Continuing Authorities Program
Centralization of Texas State Contract Compliance Functions
Right of Way Certification
Presentation transcript:

Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11

Objective: Understand the process for execution of a PED agreement. Understand what is the purpose of PED and what documents are completed in the PED phase.

STEP 15 PED Agreement STEP 15 PED Agreement

Preconstruction Engineering and Design — Currently cost-shared: — 75% - Federal — 25% - Non-Federal* – NEW!! In-kind credits allowed per Section 2003 WRDA 2007 Model PED agreements & checklist on disc *this is just a down payment – balance collected during construction

Preconstruction Engineering and Design Agreement — There are models for: – Single Purpose Navigation & Flood Risk Management Only – PED Agreement Checklist to HQ RIT for certification - 30 days prior to DE signature — Similar to FCSA — HQUSACE approves all Other PED Agreements — No PED work or issuance of contract until Agreement executed — District Engineer executes approved agreements

Preconstruction Engineering and Design Agreement Checklist — General information — Cost sharing summary — Funding history — Special conditions — Review requirements, Sponsor and Corps

STEP 16 Conduct PED STEP 16 Conduct PED

Purpose of PED — Complete the detailed engineering & technical studies and design needed to begin construction of the project recommended in the decision document. — Preparation of plans and specifications of first significant construction contract — (NEW!!) Section 2035 WRDA 07 Safety Assurance Review – Calls for independent review of flood and hurricane/storm projects if Chief of Engineers determines that it is necessary to assure public health, safety, and welfare.

Preconstruction Engineering and Design — Starts after Division Engineer’s Transmittal Letter & execution of PED agreement — Ends with completion of first set of construction plans and specifications

Preconstruction Engineering and Design — Usually requires about two years to complete — Usually overlaps with the end of the feasibility phase. — Must keep PED funds separate from feasibility review funds

Preconstruction Engineering and Design — Major Documents in PED: – Plans and specifications (P&S) – Design Documentation Report (DDR) – Draft Project Partnership Agreement (PPA) – Limited Reevaluation Reports (LRR) - Primarily for required economic/environmental updates – Real Estate Design Memorandums

Plans and specifications: — Form the technical portion of the contract documents — Used to solicit bids from private contractors — Approved at the District — Used to construct the project Preconstruction Engineering and Design

PED Coordination Team — Co-chaired by Corps project manager and sponsors counterpart — Oversees issues related to PED – Scheduling – Work Products – Plans and Specifications – Contract Award and Modification – Other Related Activities

Other Documents — Other reports may be prepared during PED and/or other project phases for use as Decision Documents or Implementation Documents

Implementation Documents Any report prepared for the purpose of implementing a project in accordance with its authorization - O&M Manual - Detailed engineering reports - Plans & Specifications

Decision Document — Any report prepared for the purpose of : l obtaining project authorization, modification, or Washington level approval; l obtaining commitment of Federal funds for project implementation; or l obtaining approval to spend and receive money as a result of entering into an agreement.

Decision Documents — Obtaining project authorization, modification, or verification: – Reconnaissance Report* – Feasibility Report – Limited Reevaluation Reports** – General Reevaluation Reports (GRR)** – Post Authorization Change (Section 902) Report – Detailed Project Report* – Major Rehabilitation Report * Approval at MSC ** Approval at MSC if no additional Congressional action required

Decision Documents — Obtaining project authorization - modification: – Dam Safety Report – Design Deficiency Report – Dredged Material Management Plans* – Water Supply Reallocation Report * Approval at MSC

Other Decision Points œ Reports in defense of budgetary decision(s) œ Project Partnership Agreements œ Credit Agreements œ Memorandums of Agreement œ Feasibility Cost Sharing Agreements œ PED Cost Sharing Agreements œ Water Supply Contracts