Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility.

Slides:



Advertisements
Similar presentations
Express5800/ft series servers Product Information Fault-Tolerant General Purpose Servers.
Advertisements

OVERVIEW TEAM5 SOFTWARE The TEAM5 software manages personnel and test data for personal ESD grounding devices. Test and personnel data may be viewed/reported.
GENI Experiment Control Using Gush Jeannie Albrecht and Amin Vahdat Williams College and UC San Diego.
Spacecraft Constellation GOES-12 scheduled for de-commissioning in Dec 2013 –GOES-12 still supporting South American mission –GOES-12 DCS is turned on.
Skyward Server Management Options Mike Bianco. Agenda: Managed Services Overview OpenEdge Management / OpenEdge Explorer OpenEdge Managed Demo.
NOAA COMMAND AND DATA ACQUISITION STATION
Network Management Overview IACT 918 July 2004 Gene Awyzio SITACS University of Wollongong.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
WNT Client/Server SDK Tony Vaccaro CS699 Project Presentation.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 10: Server Administration.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment, Enhanced Chapter 8: Implementing and Managing Printers.
70-290: MCSE Guide to Managing a Microsoft Windows Server 2003 Environment Chapter 8: Implementing and Managing Printers.
1 Disaster Recovery Planning & Cross-Border Backup of Data among AMEDA Members Vipin Mahabirsingh Managing Director, CDS Mauritius For Workgroup on Cross-Border.
1 Chapter Overview Introduction to Windows XP Professional Printing Setting Up Network Printers Connecting to Network Printers Configuring Network Printers.
Maintaining Windows Server 2008 File Services
Slide 1 of 9 Presenting 24x7 Scheduler The art of computer automation Press PageDown key or click to advance.
Printing Terminology. Requirements for Network Printing At least one computer to operate as the print server Sufficient RAM to process documents Sufficient.
MCTS GUIDE TO MICROSOFT WINDOWS 7 Chapter 14 Remote Access.
Module 16: Software Maintenance Using Windows Server Update Services.
1 GOES DCS Status and Information Dan Schwitalla – th Meeting of the STIWG– 18 – 20 May 2009.
DCP COMMAND …bringing two-way communications to your DCPs.
DCP COMMAND …bringing two-way communications to your DCPs.
1 EDDN Status and Information Dan Schwitalla – 2009 USGS STIWG/TWG – 6-8 May 2014.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
Download & Play E-Learning System PROPOSAL draft1.0.
Networking & Integration
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
© 2014 Emergency CallWorks - Confidential Out of Sight, Out of Mind And Out of Danger Cloud Hosted innovation beyond next generation.
Cove Software, LLC Michael Maloney web:
1 Guide to Novell NetWare 6.0 Network Administration Chapter 11.
©Kwan Sai Kit, All Rights Reserved Windows Small Business Server 2003 Features.
1 Guide to Novell NetWare 6.0 Network Administration Chapter 13.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
An Introduction to IBM Systems Director
LRGS Enhancements for LRIT NOAA TWG Meeting May 12, 2011 Sutron Corporation Davis Drive, Sterling VA Tel: (703)
2014 TWG USACE Field Report LySanias Broyles Rock Island District
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 2, 2012.
Kay Metcalf NOAA GOES DCS Program Manager Office of Satellite Data Processing and Distribution NOAA’s Satellite and Information Service GOES DCS: NOAA.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or is with copies to
LRIT Testing at NOAA/CO-OPS STIWG Oct CENTER for OPERATIONAL OCEANOGRAPHIC PRODUCTS and SERVICES CO-OPS operates a DOMSAT system at its two regional.
Support for GOES Data Collection System Presentation to the Advisory Committee on Water Information by Charles Kazimir, Chairperson of the Satellite Telemetry.
A Proposal to Update LRIT to Provide Reliable Rebroadcast Tool for GOES DCS Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager May 12,
Planning a Microsoft Windows 2000 Administrative Structure Designing default administrative group membership Designing custom administrative groups local.
Systems Management Server 2.0: Backup and Recovery Overview SMS Recovery Web Site location: Updated.
2 DCS MANAGEMENT ACTIVITIES UPDATES ON ALL OUR ONGOING PROJECTS OTHER INFORMATION HELPFUL TO USERS ALL ITEMS MAY BE CONSIDERED WORKS IN PROGRESS QUESTIONS.
1 The System Menu. 2 The System menu Dashboard Page displayed upon every login. It encompasses several boxes organised in two columns that provide a complete.
WSM Administrator Training. WSM Administrator Discussion of WSM Administrator responsibilities Discussion of WSM administrative interfaces Detailed discussion.
Maintaining and Updating Windows Server Monitoring Windows Server It is important to monitor your Server system to make sure it is running smoothly.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
…bringing two-way communications to your DCPs DCP COMMAND.
LRIT Project Status Update STIWG/TWG, Boise, ID Mark Bushnell NOAA/NOS/CO-OPS May 02, 2012 Definitions LRIT – Low Rate Information Transmission LRGS –
Jan 2008 TWG Meeting Rich Engstrom P.E. Rock Island District Mississippi Valley Division U.S. Army Corps of Engineers
Project to Develop GOES DCS User Requirements TWG Presentation By Ernest Dreyer October 28, 2009.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) MAY 19, 2009.
Activity 1 5 minutes to discuss and feedback on the following:
STAAR Assessment Management System and StAAR Online Testing Platform
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
NESDIS Report Information Update for TWG Kay Metcalf NOAA GOES DCS Program Manager November 17, 2010.
ITMT 1371 – Window 7 Configuration 1 ITMT Windows 7 Configuration Chapter 8 – Managing and Monitoring Windows 7 Performance.
Proctor Caching Overview. 2 Proctor Caching Diagram.
NESDIS MANAGEMENT REPORT TO THE TECHNICAL WORKING GROUP (TWG) DECEMBER 5, 2008.
System Architecture CS 560. Project Design The requirements describe the function of a system as seen by the client. The software team must design a system.
CCNA Routing and Switching Routing and Switching Essentials v6.0
Chapter 10: Device Discovery, Management, and Maintenance
CCNA Routing and Switching Routing and Switching Essentials v6.0
Chapter 10: Device Discovery, Management, and Maintenance
STATEL an easy way to transfer data
Presentation transcript:

Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility Presented by Ernest Dreyer, USGS/WRD June 12, 2007

Overview ● Review EDDN project ● Provide a current status ● Describe backup capabilities ● Review User access

Review of EDDN Project

EDDN Project GOALS Receive data from all DCPs transmitting in the GOES DCS independently of Wallops Island. Locate facility at a site sufficiently distant from Wallops Island to achieve event independence.  Implement additional pilot signal at a location other than Wallops Island. Distribute data independently of Wallops Island.

STIWG/NESDIS Proposal Locate the emergency distribution system at the USGS EROS Data Center in Sioux Falls, South Dakota. USGS and NOAA/NESDIS will share the costs for procurement of the Direct Readout Ground Station system. System will be primarily operated by USGS with support from NESDIS. Operational costs will be shared among users who agree to participate and NESDIS.

Limitations ● Contains no system to Make new assignments Data will be acquired from any transmitting DCP and so an internal schedule will not be necessary.  Generate abnormal platform response messages Messages will not be checked for abnormal conditions – at least not initially.

Limitations (cont.) Distribution will initially be over the Internet using the DDS protocol. No DOMSAT transmissions No direct land-lines Depends on the existence of a usable pilot signal.

Basic EDDN System ● DRGS system with 2 antennas for GOES East and West ( at least 7M ) ● DOMSAT system for data from Wallops Island ● LRGS systems for acquiring and distributing data. ● Web Server for reporting system status.

Some Features required of the EDDN GOES Receive System ● Receive both 100 and 300 baud messages on the same channel. ● Support a backup pilot signal and be able to switch to the backup if the primary signal fails.

Diagram of Proposed System

System Monitoring Use Big Brother system monitoring  Write Big Brother clients for montioring ● DRGSs via the DAMS NT event socket ● LRGSs via system logs ● Other events significant to the operations of system Big Brother can  Display current status on web site  Send notifications to groups  Page users

System Control After initial setup, system should operate with a minimum of operator intervention. System will be remotely managed using a remote system console assisted by on-site support.

System Support Initial Capital Investment  USGS/NESDIS Operations and Maintenance Costs  Work out a fair system for each agency that uses the system ● Likely an assessment similar to DOMSAT

Recurring Costs EROS Support  Includes ● 24/7 on-call network and emergency support ● General SA support during regular hours.  SA will be familiar with DRGS systems and can assist in trouble shooting, making repairs, etc.  Does not include ● Routine administration.

Recurring Costs (cont.) Maintenance  Optional maintenance support for the system after the warranty period. This includes ● Yearly routine maintenance and inspection ● On-call service.

Current Status of EDDN

Status of DRGS Procurement ● RFP issuedEarly February ● Site Visit at EROSFebruary 17,2007 ● Proposals ReceivedLate March ● Evaluations/ReviewActive ● Contract AwardedJune, 2007 ● System Installed6 months after award

Status of LRGS Upgrades to support EDDN ● LRGS Software  Work completed and ready for testing for the following enhancements: ● DDS Security ● DDS Configuration ● DDS Backup Message Recovery ● DDS Data filtering  New version is 6.0 and will be the base configuration used by EDDN

Basic Backup Capabilities

Some EDDN Features EDDN was designed with these principles ● Would integrate easily into the current data distribution system. ● Would be active all the time, not needing to be “turned on.” ● Would provide a secondary source of data that could be used for data recovery for “problem” transmissions.

Role of LRGS in GOES DCS

EDDN and LRGS ● EDDN takes advantage of the backup capabilities developed for Version 6.0 of the LRGS system ● The LRGS is a store-and-forward system that can be configured with a  primary data feed and  one or more secondary feeds. ● The LRGS can automatically use secondary feeds for backup and data recovery.

EDDN and LRGS ● Version 6.0 of the LRGS supports these backup/recovery/filtering scenarios: ● Failure of primary data feed.  DDS  DOMSAT  DRGS ( DAMS-NT connection )  Other ● Missing messages. ● Reception of “bad” message.  Messages with parity errors  Messages with missing EOT ● Reception of duplicate messages.

Examples that Illustrate Backup Scenarios

LRGS Backup DOMSAT Only Primary LRGS with 1 Peer Backup

LRGS Backup DOMSAT Only Primary LRGS with 2 Peer Backups

LRGS Backup DOMSAT and DRGS LRGS with DOMSAT feed backed up by LRGS with DRGS feed

LRGS Backup DRGS and DOMSAT LRGS with DRGS feed backed up by LRGS with DOMSAT feed

Scenario for EDDN/LRGS Backup LRGS with Primary DOMSAT feed GOES West GOES EastDOMSAT EROS LRGSUSER LRGS Wallops LRGS 1 st Backup (DDS Feed) 2 nd Backup?? (DDS Feed) USER DDS Client EROS EDDN Wallops

Scenario for EDDN/LRGS Backup LRGS with Primary DRGS feed GOES West GOES EastDOMSAT EROS LRGSUSER LRGS Wallops LRGS 1 st Backup (DDS Feed) 2 nd Backup?? (DDS Feed) USER DDS Client EROS EDDN Wallops

Scenario for EDDN/LRGS Backup LRGS with Primary Network DDS feed GOES West GOES EastDOMSAT EROS LRGS USER LRGS Wallops LRGS 1 st Backup (DDS Feed) Primary ( DDS Feed ) USER DDS Client EROS EDDN Wallops

EDDN and User Access

● How will users get data from EDDN  Interactively ● DDS client, either a GUI message broswer of command-line command  Real-time ● Another LRGS using DDS connection ● DDS command-line command in real-time script ● Other DDS clients

Some examples of available DDS clients Interactive ● LRGS Message Browser ● DDS command-line command (Both are included with basic LRGS packages and can also be acquired as stand-alone software) Real-time ● Another LRGS using DDS connection to another system ● DDS command-line command in real-time script ● DECODES ● USGS Satin ● National Interagency Fire Center “ASCADS” Program

EDDN and User Access ● How will users keep their network up-to-data?  LRGSs in EDDN system will synchronize user information, including networks, from PDTS. ● How will users monitor the operational status?  Big Brother Web display

EDDN and User Access ● What documentation will be available?  Setup guide that explains ● Features ● Hardware and software Requirements ● Registration procedure ● Connection options