NHS FIFE ORTHOPAEDIC UPDATE Mr Edward Dunstan Orthopaedic Clinical Lead May 2015.

Slides:



Advertisements
Similar presentations
Ilkeston Hospital DTC – Extending the Role of Community Hospitals Paula Clark - Erewash PCT.
Advertisements

Paramedic Practitioner Support Scheme for Older People with Minor Injuries or Conditions South Yorkshire Ambulance Service NHS Trust Sheffield.
Stephen Ryan, PwSI Lead, Newquay, 2 nd March 2005 GPwSIs – National Perspective.
Chronic Pain Services -The East Kent Model
The Journey for Amputee Rehabilitation Josephine Wong Day Rehabilitation Centre Ambulatory & Primary Health Care Directorate Central Northern Adelaide.
Suffolk Care Homes An Integrated Approach
ESD Stroke Pilot. Pilot Based on retrospective audit and budget of £75,000. Clinical Leads OT and Physio from RCH Acute Stroke Unit developing and leading.
1 Developments and progress Dr Martin Freeman GP Clinical Lead for Dementia Services.
The Management of Back Pain at Work AOHNP (UK) Symposium 13 th May 2004 Carol Coole Occupational Therapist NOTTINGHAM BACK TEAM.
Baseline Model of care for proposed community wards Appendix 1.
Dr David PB Watson GP Hamilton Medical Group Aberdeen GPwSI Headache Department of Neurology, Aberdeen Royal Infirmary.
DEVELOPING AN ENHANCED 7 DAY AHP SERVICE FOR HIP FRACTURE PATIENTS Colin Talbot-Heigh, Senior Orthopaedic Occupational Therapist, Kirsteen Kelly, Team.
Oldham Doing It Differently
The Health Roundtable Osteoarthritis Chronic Care Program (OACCP) Presenter: Matthew Jennings Hospital Code Name: Innovation Poster Session HRT1215 – Innovation.
Cheshire and Merseyside Rehabilitation Network.. 2 year project – completed Jun 13 9 Hyper- acute Rehabilitation beds – for patients with the most complex.
Hospital Admissions Andy Sharp, Service Director – Adult Social Care Tim Branson, Service Manager - Enablement.
Introduction This toolkit has been put together in an attempt to provide colleagues with a set of documents, tools, links and information to support the.
The Virtual Ward (grasping opportunity!)
What type of information do service providers/ commissioners need? – good quality evidence to underpin service delivery/commissioning Screening Matched.
Hull Integrated Care Centre Update – June 2015 Julia Mizon – Director of Commissioning and Partnerships Erica Daley – Strategic Lead Planning and Integration.
Localities Project: Using Clinical Knowledge Publisher.
NHSL 18 weeks RTT MSK Event Janie Thomson Consultant Physiotherapist NHSL.
Healthcare for London is part of Commissioning Support for London – an organisation providing clinical and business support to London’s NHS. Healthcare.
The Health Roundtable 3-3b_HRT1215-Session_McCallWHITE_BARWON_VIC Orthopaedic Flow Presenter: Martin McCall-White Geelong Innovation Poster Session HRT1215.
SIPS Project Strategy for an Integrated Preventative pathway for Swallowing difficulties in Care Homes Eleanor Stout Mary Heritage Derbyshire Community.
Linking EDT to RMS to Allow 2- Way Communication with GPs Martin Paxton IT Programme Manager Dudley Group NHS Foundation Trust.
Driver Diagrams. “Every system is perfectly designed to achieve the results it gets” - Improvement Axiom.
Virtual Townhall Meeting: Reducing the Risk of Spinal Cord Injuries for People with SCI.
RESHAPING CARE FOR OLDER PEOPLE
Improving Access to Musculoskeletal Services: A New Model of Care Ian Holding Senior Lecturer Musculoskeletal Medicine, Otago BSc, MBBCh, FRNZCGP, Dip.
Advice to GP’s on using MSK Proforma Upper Body
Enabling Life Potential through Vocational Rehabilitation “a process that enables people with functional, psychological, developmental, cognitive and emotional.
Gerald Coteman, Chairman Taking Control Foundation Trust Clinical and Patient Empowerment (inc. commissioning) Health versus Hospitals.
The National Musculoskeletal (MSK) NHS Lanarkshire Pilot
JCUH NICE MSCC Guidelines Compliance audit Ruth Mhlanga Senior Specialist Physiotherapist Oncology and Haematology.
Good Practice on Scale The past, present and future of Foot and Ankle Pathways in NHS GGC Elaine McLure Nicola Munro David Wylie.
Delivering improvements in diagnostic services 31st March 2010.
Future Vision of Rehabilitation Services What do we need to do to meet the challenge?
A New Musculoskeletal Pathway Vision or Reality ? Sarah L Mitchell, Rehabilitation Programme Manager, Scottish Government June Wylie, AHP Professional.
Falls prevention in care homes and at home Dr Raymond F Jankowski.
Frail Elderly Pathway Walsall Healthcare NHS Trust.
Cost Efficacious Hip Fracture Care: preventing the fracture transforming the care SHA Guidance Day 2009 Prof. Keith Willett National Clinical Director.
Domains Care Model HomecareOutpatientsInpatients Primary care.
CCG Feedback January 2014 Issue/QueryOutcome/Update District Nurses have ceased to visit house bound patients to take blood tests This has been raised.
Jason Holland 10/06/2013 Changing face of Unscheduled Care The Implementation of new roles within the Emergency Care Directorate across Pennine Acute Hospitals.
A Musculoskeletal Pathway Sarah L Mitchell, Rehabilitation Programme Manager, Scottish Government June Wylie, AHP Professional Officer, Scottish Government.
MSK pathway What is the MSK service? This is a multi- professional screening, assessment and treatment service. It has been set up by the RSCH together.
NHS Fife Orthopaedic Unit  AHP service  Success  Challenges  Facilities  Developments.
Integrated Care Programme Update December 2014 Chris Badger Assistant Director for Integrated Care.
Whole System Working Project NHS Forth Valley Stuart Cumming June 2011 Working Better Together.
12 March 2009 Dr Brian Montgomery Associate Medical Director NHS Lothian Emergency Access Delivery Team.
Lean Network NHS Lanarkshire & North Lanarkshire Council. Reshaping Older Peoples Rehabilitation. Background.Priority. Programme Charter.
THE INTEGRATED DISCHARGE TEAM. Where we came from In August 2004 five different teams were amalgamated into one. The five teams were: Social Worker and.
Prevent wounds Adequate risk assessment Use of evidence base to reduce risk Identify overall deterioration Provide equipment advice Actions to mitigate.
Mel Pickup, Chief Executive Warrington & Halton Hospitals NHS FT Andy Davies, Accountable Officer Warrington Clinical Commissioning Group Achieving the.
Older People’s Services South Tyneside Annual Update
Audit of fracture clinic services N. Picardo-Green, S. Jaufuraully, U. Ashraf, A. Carlos February 2015.
ACUTE BACK PAIN PATHWAY RED FLAGS
The MSK Referral System Dr Louise Pollard Consultant Rheumatologist Lewisham and Greenwich NHS Trust.
Barts Health Musculoskeletal Physiotherapy and IMAPS Service Update June 2016.
SUSPECTED SPINAL STENOSIS
Frailty, Reablement and Falls Prevention on The Isle of Arran
ACUTE BACK PAIN PATHWAY RED FLAGS
Older peoples services
Paediatric Orthopaedic MSK Pathways Pamela Holland
Specialist Therapies -Adults
Dr Rupert Woolley North and West Reading CCG Clinical Lead
Spinal drop-in service
Lucy Smith – Head of Therapy, Chesterfield Royal Hospital
'Bounce Back' clinic: A primary care multidisciplinary one stop clinic for frailty Amanda Hensman-Crook.
Presentation transcript:

NHS FIFE ORTHOPAEDIC UPDATE Mr Edward Dunstan Orthopaedic Clinical Lead May 2015

Enhanced Recovery

Results – Cumulitive Discharge Rates

Factors affecting LoS Predictors in Model B Value95% CIp-value ERP to -1.6<0.001 Catheter to -1.3<0.001 Age to 0.07<0.001 ASA1Reference to 0.75< to 1.50< to 2.25<0.001 Approach Anterolater al Reference Posterior to <0.001 Preoperative HHS to <0.001

RAPT (Risk Assessment and Predication Tool) Age Gender Mobility Walking Aids Community Support Lives alone Identify those who require extended rehabilitation at time of listing

RAPT 42 consecutive patients 20 with a score >/= 9 18 home within 4 days 16 of the 18 with a score 6-8 home > 4 days What to do with those with a score <9 ? Rehabilitation facility ? Community based rehabilitation team

Fracture Neck of Femur

Theatre Optimization

?SCAPHOID !!!!!!!!!!!!!!!!!

NHS Fife Orthopaedic Service Improvements Enhanced Recovery for Hip and Knee Arthroplasty Reduced length of stay - 4 Days Redesign Pathway to Support QOF Guidance for Knees Spinal Clinics New Clinics at WMB and QMH Increased Capacity 32 Patients Defined Fife Pathway Intranet Advice and Guidance 90% Patient Satisfaction with Clinics Redesign Low Back Pain Pathway Orthopaedic Advice and Guidance NHS Fife Orthopaedic Guidance ? Desk Top Help Tool ? Referral Advice Fields Increased Compliance with SIGN Guidelines Vetting Times Reduced from 10 to 2 Days Referral Management Enhanced Communication Reduces Patient Anxiety Reduces Patient Pathway by 8 weeks GP Direct Access to MRI (Radicular Pain) Advice via Referral Management System E-advice Maximisation of Workforce Management Consistency Reduced Patient ‘Hand-Offs’ Increased capacity by 40 patients a month GPwSI Community Knee Clinic Transfer of Physiotherapy Staff to Primary Care GP Orthopaedic Training Delivered Physiotherapy Services Shift in Balance of Care Primary Care Diagnostics Redesign Reduces Risk of Chronicity Virtual Advice Clinics Integrated Service Physiotherapy Community Spinal Clinic Multidisciplinary Diagnostic Group Exploring Expansion of Access Patient Involvement Patient Support and Input New Service User Information Leaflets User Involvement and Patient-Centred Ongoing Research

Neck Lumbar Shoulder Hip Thoracic Elbow WristHand Knee AnkleFoot  Cauda Equina  Acute trauma/fracture Refer to A&E  Suspected Malignancy  Infection  Progressive neurology Refer to Secondary Care Acute Soft Tissue Injury Service User Information Healthy Working Lives Adviceline on Fife Sport and Leisure NHS Fife Musculoskeletal Resource Tool NHS Inform Musculoskeletal National Advice NHS Fife Summary Orthopaedic Referral Guidelines Useful Links Analgesic Ladder Musculoskeletal Medication Advice Physiotherapy Referral Guidance NHS Fife Orthopaedic Pathway Hover over area and ‘click’ for further advice Terms of Use Minimum Information Required for Orthopaedic Referrals NHS Inform Info Sheet Chronic Pain 20