Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.

Slides:



Advertisements
Similar presentations
CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,
Advertisements

TheEuropean Extremely Large Telescope. The E-ELT 40-m class telescope: largest optical- infrared telescope in the world. Segmented primary mirror. Active.
John Mather, JWST Science, May 11, 2006, Page 1 James Webb Space Telescope (JWST) Science Update for AAAC John Mather JWST Senior Project Scientist NASA/GSFC.
Extremely Large Telescopes and Surveys Mark Dickinson, NOAO.
Conversation with ACCORD on GSMT 21 January 2005 Michael S. Turner, Assistant Director Directorate for Mathematical & Physics Sciences National Science.
MACQUARIE UNIVERSITY, DEPARTMENT OF PHYSICS RESEARCH – ASTRONOMY & ASTROPHYSICS CORE Astronomy and astrophysics research has grown rapidly at Macquarie.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
1 Feeding the Giants (with data and funding) Roger Blandford KIPAC Stanford.
1 SONG Exoplanet Searches in the Context of Next Generation Exoplanet Surveys Joe Carson College of Charleston September 17, 2011.
Fundamental Physics and the Decadal Survey Quantum to Cosmos 3 Airlie, VA 7 July 2008 Michael Salamon NASA HQ/Astrophysics Div.
TMT Instrumentation Canadian capabilities and interests David Loop, NRC-HIA June 26, 2010.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
Observational Astronomy. Astronomy Primary Goal: Understanding the nature of the universe and its constituents Means: Equipment building, research, teaching.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
Careers in Astronomy AST 200. Astronomy Primary Goal: Understanding the nature of the universe and its constituents Means: Equipment building, research,
Introduction of Space Technology. The James Webb Space Telescope The James Webb Space Telescope was previously known as the Next Generation Space Telescope.
The tools. Hot question of Galileo’s time what’s at the centre: earth or sun?
Keck Observatory and The System: Astro2010 Activities Mike Bolte, Shri Kulkarni, Taft Armandroff Keck Strategic Planning Discussions September 18, 2009.
[79.03] The Thirty Meter Telescope (TMT) Project Gary H Sanders for the TMT Project Partnership AAS 205th Meeting, San Diego Providing Access to U.S. Astronomers.
Enabling a GSMT for the US Community: AURA’s Proposal to the NSF Stephen E. Strom 04 June, 2004 Tucson, AZ National Optical Astronomy Observatory Tucson.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 23.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
The Utility of National Academy-Sponsored Decadal Surveys Daniel N. Baker Laboratory for Atmospheric and Space Physics CU-Boulder.
Activities of and Prospective Issues before the Committee on Astronomy and Astrophysics Report by David Spergel, CAA Co-Chair Disclaimer: These slides.
GSMT NSF Science Working Group Rolf-Peter Kudritzki NOAO Town Meeting 07 January, 2003.
Advancing GSMT SWG Recommendations: AURA’s Proposal to the NSF Stephen E. Strom AURA New Initiatives Office Presented to the GSMT SWG 12 February, 2004.
A Roadmap forNationalOIRFacilities AAAC May 2005 OIR Long Range Planning Committee Document for submission to NSF AST and CAA May 2005.
Our Mission The OPTICON Integrated Infrastructure Initiative brings together all of Western Europe's owners and operators of large observatories and data.
Association of Universities for Research in Astronomy Presentation to Subaru Users Committee.
European Extremely Large Telescope - Status April ESO.
MAXAT-II Woods Hole September Overview Science Drivers Lessons of the past Focusing on Science and Innovation.
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
NGSTNGST ASWG 22 Oct. ASWG Charter & Role  NGST Scientific Goals & Metrics  Refine actual goals and put in DRM √  Refine DRM model assumptions √  Assist.
The Advanced Technology Solar Telescope from the Perspective of the National Science Foundation.
Morris Aizenman Senior Scientist Directorate for Mathematical & Physical Sciences National Science Foundation Physics and Engineering Sciences Committee.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
1 Astronomy and Astrophysics Advisory Committee, Feb 2005 SAWG Letter and Ground-Based Archiving AAAC, Feb 16, 2005 Alan Smale, Universe Division.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
Australia’s Path to a Giant Telescope Matthew Colless MNRF Symposium 7 June 2003.
LMS11/26/01NIO Workshop on Wind Modeling Welcome and Introduction Larry Stepp.
AST Update Astronomy and Astrophysics Advisory Committee 10 May 2007.
CELT Science Case. CELT Science Justification Process Put together a Science Working Group –Bolte, Chuck Steidel, Andrea Ghez, Mike Brown, Judy Cohen,
11 DOE Office of Science High Energy Physics Program AAAC Meeting October 15, 2009 National Science Foundation Dennis Kovar Associate Director of the Office.
ALTAIR: Access to Large Telescopes for Instruction and Research Chair: Larry Ramsey (14 members, 8.5L, 2S, 3.5U) Report: Submitted Mar 9, 2009
Mega Telescopes of the 21 st Century Evolution in the Ground-Space Synergy Dr. Marc Postman (STScI) & Richard Ellis (Caltech) James Webb Space Telescope.
AURA New Initiatives Office. GSMT SWG Meeting L. Stepp, July 30, 2002 NSF Science Working Group Support Available from AURA NIO Available Personnel Current.
Keck Observatory Overview Peter Wizinowich W. M. Keck Observatory AOSC May 31, 2004.
Future of Astronomy Astronomy 315 Professor Lee Carkner Lecture 25.
1 LSST Town Hall 227 th meeting of the AAS 1/7/2016 Pat Eliason, LSSTC Executive Office Pat Osmer, LSSTC Senior Advisor.
Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.
Division of Astronomical Sciences Senior Review Astronomy and Astrophysics Advisory Committee 10 May 2007.
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
Next Generation O/IR Telescopes Stephen E. Strom Associate Director GSMT Development NOAO User’s Committee October, 2005.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
LSST Community Workshop – Welcome and Kavli LSST Resources Study 1.
The Science Case Hubble Space Telescope CELT+AO HDF.
Community Science Updates
Upcoming Facilities of IIA
[79.03] The Thirty Meter Telescope (TMT) Project
Theme 2 AO for Extremely Large Telescopes
Letizia Stanghellini NOAO 16 June 2008 – Science with Giant Telescopes
Scientific Potential Current Design Efforts Complementarity with JWST
Theme 2 AO for Extremely Large Telescopes
Theme 2 AO for Extremely Large Telescopes
Presentation transcript:

Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity with JWST 4.Community Involvement

The NAS/NRC Decadal Survey Report: “The Giant Segmented Mirror Telescope (GSMT), the committee’s top ground-based recommendation….is a 30- m-class ground-based telescope that will be a powerful complement to [JWST] in tracing the evolution of galaxies and the formation of stars and planets.” “The committee recommends that technology development for GSMT begin immediately and that construction start within the decade.”

Community Vision for GSMT: The GSMT Science Working Group At NSF’s request, AURA’s New Initiatives Office convened a Science Working Group (SWG) to “advise the NSF Division of Astronomical Sciences on a strategy for guiding federal investment in a Giant Segmented Mirror Telescope (GSMT).” With a broad membership base from national and international groups that expect to play a role in developing next-generation telescopes, the SWG, chaired by Rolf-Peter Kudritzki, gave their first report to the NSF in 2003, June: Frontier Science Enabled by a Giant Segmented Mirror Telescope

GSMT’s Science Working Group Report: Science “The unique challenge of astronomy in the 21st century is to study ‘the evolution of the universe in order to relate causally the physical conditions during the Big Bang to the development of RNA and DNA’ (Riccardo Giacconi). A 20-m to 30-m telescope will provide the unprecedented capability to meet this challenge.”

GSMT’s Science Working Group Report: Synergy with JWST “In order to reap the enormous potential synergy between the James Webb Space Telescope (JWST) and a 20-m to 30-m telescope, it is essential to initiate major design and technology development efforts now to ensure that facility operations coincide with the early JWST era.”

GSMT’s Science Working Group Report: Community Involvement “Federal investment now in a major technology development program targeted at key areas can advance multiple design programs, and will ensure a strong public voice at all stages in the development of next-generation telescopes.” NSF should “’seize the moment’ and provide funding for advancing key technologies”.

GSMT’s Science Working Group Report: Technology While there are significant technical challenges to building telescopes of this size, there appear to be no show stoppers Adaptive optics systems will be critical to the success of a GSMT and are a key challenge, but Advanced AO systems have moved from the lab to the telescope and have become a routine tool for the study of phenomena on all scales – from planets and their atmospheres in our own solar system, extra- solar planetary formation and debris disks around stars, to black holes and extra galactic systems.

The Use of Adaptive Optics Systems for Data Collection is Steadily Increasing

GSMT & JWST – The Power of Two The top two priority missions of the 2001 Decadal Survey in Astronomy and Astrophysics Each gives orders of magnitude gain in sensitivity over existing ground and space telescopes Complementary capabilities and unique discovery spaces of each telescope open a new, exciting epoch for cosmic discovery

Statement by the AAAC in Annual Report: Science and Synergy with JWST “The ambitious science goals, which include understanding the formation of galaxies and the chemical elements within just the first one billion years of the Big Bang, and the formation of stars and planets, will only be fully realized through operational overlap of the facilities, as HST and large-ground based telescopes have demonstrated over the last decade. Progress on these scientific objectives is heavily dependent on GSMT being developed on the same timescale as JWST.”

Percentage of Refereed HST Papers with Ground based OIR “support”

Key Actions taken by AURA in Support of Decadal Survey’s call for a GSMT: Engaged the community to define the science capabilities required for a GSMT Developed a point design for a GSMT in order to study design options and identify technology challenges Entered into a partnership with UC, Caltech and ACURA (CANADA) to carry out the design and development phase for a 30-meter telescope – TMT in order to: –Ensure access by US community to 30-meter class telescope via public-private partnership as recommended by the Decadal Survey –Involve the community during Design & Development phase Submitted proposal to NSF in order to: –Support public participation in TMT partnership, and –Advance the design of an alternative GSMT concept

AURA’s NSF Proposal Will provide support to more than one GSMT design study US leadership in astronomy has depended on a broad range of public and private OIR facilities –1948 – one 5-meter - Palomar –1970’s – 3-4m telescopes (CTIO, KPNO, CFHT, Lick, IRTF) –1990s – 6-10 m telescopes: (Keck, Magellan, Gemini, MMT, HET, LBT) –21 st century – TMT, GMT, … AURA provides public access to first ranked facilities through –partnerships (Gemini, WIYN, SOAR…) and –TSIP (Keck, HET, MMT, Magellan …)