Long Duration Balloon flight from polar regions (Peterzen et al. ESA Symposium 2003 ESA-SP530 – St. Gallen) Workshop ASI sulle Tecnologie ElettroOttiche.

Slides:



Advertisements
Similar presentations
Signaux, Bruits, Problèmes Inverses – INRA - Nice, The VIRGO Environmental Monitoring System R. De Rosa University of Napoli - Federico II and.
Advertisements

1 CAN WE TURN A PHONE IN TO A SATELLITE? Android Open 2011San Francisco,10th Oct
As a stand-alone overview of test tools.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Telos Fourth Generation WSN Platform
U.S. Department of the Interior U.S. Geological Survey Agency Report, WGISS #22 September 15, 2006 Lyndon R. Oleson U.S. Geological Survey Center for Earth.
SOT Geneva 2007 Iridium: low power satellite communications for autonomous instruments David Meldrum Scottish Association for Marine Science.
Darrell Ernst Jean-Claude Ghnassia Gerhard Mayer 9 September 2004 AERONAUTICAL TELEMETRY.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Frigid Fridays On each Friday last January, the temperature was a record low temperature for the date. On Friday, January 30, the mercury dropped to 5°F,
1 Approximability Results for Induced Matchings in Graphs David Manlove University of Glasgow Joint work with Billy Duckworth Michele Zito Macquarie University.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Reconciling trends from radiosondes and satellites (MSU4 and SSU15x) Data: LKS radiosondes (87 stations), updated to 2004 using IGRA data MSU4 and SSU15x.
© University of Reading Richard Allan Department of Meteorology, University of Reading Thanks to: Jim Haywood and Malcolm.
Wireless WANs Chapter 16.
Slide 1 PROBA Project for On-board Autonomy Verhaert Design and Development nv Hogenakkerhoekstraat 9 B 9150 Kruibeke Tel. 03/ Fax 03/
It all started simple…. One Alternator One Battery One Starter Motor.
Timo Wollmershäuser Institute for Economic Research at the University of Munich 2 nd Workshop on Macroeconomic Policy Research, Budapest, October 2-3,
Mini-Dusty Payload AGF-218 UNIS, Longyearbyen Sveinung V. Olsen.
Yoshiyuki FUJINO National Institute of Information and Communications Technology, Japan Wireless Power Transmission Activity in NICT.
Kingfisher Practice What is it like to be a patient? Jo Newton
MoistureMap: Multi-sensor Retrieval of Soil Moisture Mahdi Allahmoradi PhD Candidate Supervisor: Jeffrey Walker Contributors: Dongryeol Ryu, Chris Rudiger.
Welcome To The Four Umpire System. © 2007 Softball Canada All Rights Reserved Softball Canada Four Umpire System FP & SP 2 Tips for the Four Umpire System.
AN ARITHMETIC and A GEOMETRY SERIES AN ARITHMETIC and A GEOMETRY SERIES.
Opensensor - information material version 0.1Aalborg University, Mobile Device Group opensensor Part 5 Building the opensensor Frank H.P. Fitzek Anders.
Before Between After.
The Unusual Northern Polar Summer of 2002 by Richard A. Goldberg (NASA GSFC) Artem G. Feofilov (CUA/GSFC) Alexander A. Kutepov (CUA/GSFC) W. Dean Pesnell.
Principles of Electronic Communication Systems
Finding Skyline Nodes in Large Networks. Evaluation Metrics:  Distance from the query node. (John)  Coverage of the Query Topics. (Big Data, Cloud Computing,
1 wp4 – CAPANINA Trial 2 Neuchatel 27/10/05 Marco Bobbio Pallavicini (CGS) Myles Capstik (UNY) Joachim Horwath (DLR)
National Aeronautics and Space Administration — Balloon Program 2009 Bridging the Gap to Space The Micro-Instrumentation Package: A Solution for Lightweight.
The University of Iowa. Copyright© 2005 A. Kruger 1 Introduction to Wireless Sensor Networks Telemetry and WSNs 24 January 2005.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
AoA: Functions to Forms Team UGS. Primary Form Selection Function: – Detect and Alert of Intrusion Forms: – Ground Sensors – Cameras – Personnel – Animals.
European Ultra-light to Heavy-lift Stratospheric Balloons in the Polar Regions Svalbard - Norway & Baia Terra Nova - Antarctica.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
University of Kansas EPS of KUTEsat Pathfinder Leon S. Searl April 5, 2006 AE256 Satellite Electrical Power Systems.
Tethered Satellite Propulsion
EEE440 Modern Communication Systems Satellite Systems.
= Particle Astrophysics ANITA Collaboration Meeting UC-Irvine November 24-25, ANITA-lite: The Background Survey Jim Beatty Penn State.
Particle Astrophysics ANITA Collaboration Meeting UC-Irvine November 24-25, Ballooning Issues Jim Beatty Penn State.
Satellite communications and the environment of space Images: NASA.
Elliot Buller Luke Ciavonne Mehdi Mehrpartou Advisor: Dr. Steven Reising.
NAVO/PSI Buoy. Equipped with RTK GPS Rover Receiver, Buoy attitude and motion sensors, data acquisition system, and telemetry system. Reference Station.
Team Flying Camels Nawar Chaker Paul Savage Tim Jacobs Pete Dokter Adam Swartley Capstone Project January 22, 2005.
The NASA Ames PhoneSat Project Mike Safyan DCC 2011, Baltimore 9/16/11.
LSU 06/23/04COSPAR 2004, HASP Presentation1 The High Altitude Student Platform (HASP) for Student-Built Payloads T.G. Guzik and J.P. Wefel Dept. of Physics.
COMS Transceiver – RF DataTech LRT470 Frequency: MHz Operation: Half-Duplex Max. RF Transmit Power: 750mW Typical Power Draw at 750mW RF: 3.5W Bandwidth:
Page 2Kiruna, 9. Oct 2008, M. Wieser, IRF MEAP/P-BACE launch and flight Martin Wieser Swedish Institute of Space Physics, Kiruna, Sweden and the MEAP/P-BACE.
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
LSU 06/26/06PSB July Development of the High Altitude Student Platform T. G. Guzik, S. Besse, A. Calongne, A. Dominique, S. B. Ellison,
Inter-Continental Atmospheric Radiosonde Upper-air Sounding System ( ICARUSS) Hal Cole, Mel Shapiro, Vin Lally, Terry Hock, Rolf Langland Surface & Sounding.
Tielong Zhang On behalf of the CGS Team in the Institute of Geology and Geophysics, Chinese Academy of Science Spacecraft System and Payload China Geomagnetism.
U.B. Presentation October Bernard COURTY L.P.C.C. College de France - Paris.
Justin Kenny – IME  Project Description + Goals  Block Diagram + Descriptions  Schematic + Layout  Construction, Testing + Problems.
1 The Global Positioning System (GPS). 2 nd USAF Space Operations Squadron.
Student Satellite Project Power Generation and Distribution 1 Power Generation and Distribution WINTER ’99 REVIEW Chieh-Kuen Woo Team Leader.
Flight Testing Small Satellites Through High Altitude Ballooning Presented by Zach Henney 18 April 2015.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Component Selection and PCB Fabrication Supervisor: Dr. Peter Driessen Presenter: Justin Curran.
Team Meeting May 23 rd Attending Everyone but Jared and Matt Swenson –Kick off for combat sentinel II … Start on Wednesday –Sub Contract with SDL.
TRIO-CINEMA 1 UCB, 2/08/2010 ClydeSpace Electronic Power System Yashraj Khaitan Space Sciences Laboratory University of California, Berkeley.
SIGNIFICANCE OF TELECOMMAND & TIMER IN SCIENTIFIC BALLOONING AND THEIR DEVELOPMENTS V. Anmi Reddy Tata Institute of Fundamental Research, Balloon Facility,
Driftsonde System Capabilities
Mozella Bell, Herman Neal, Matthew Ware
CubeSat vs. Science Instrument Complexity
Long Duration Balloon Development…
Ballooning Payload Components for Teacher Workshop Summer 2010
Voltage Regulator Board
Presentation transcript:

Long Duration Balloon flight from polar regions (Peterzen et al. ESA Symposium 2003 ESA-SP530 – St. Gallen) Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi Flights from NSBF - USA (from Fairbanks, Alaska) At similar latitudes, flights from Kiruna (Sweden) Svalbard have higher latitude.

Long Duration Balloon flight from polar regions (Peterzen et al. ESA Symposium 2003 ESA-SP530 – St. Gallen) Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi Flights from NSBF - USA (from Fairbanks, Alaska) At similar latitudes, flights from Kiruna (Sweden) Svalbard are at higher latitude (78-80N).

Svalbard launch tests Test launch July 24, 2004 Feasibility of LDB flight from Svalbard proved More than 40 days at float IRIDIUM telemetry subsystem for OLIMPO succesfully tested Solar panels/charge control tested Forecasted OLIMPO LDB scientific balloon flight in Summer 2006 Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi

Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi

Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi

Telemetry / TC / data acquisition for Long Duration Balloon Flights Polar flights are not in Line of Sight. Solution: a) Satellite relay telemetry / TC system Iridium TM/TC for selected/compressed data (INGV, G. Romeo/Phys.Dept) b) on-board full storage c) data dump on selected ground stations Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi

Iridium 66 satelliti (6 ricambi già in orbita) a 780 km 100 minuti di periodo orbitale Frequenza comunicazione verso terra (utenza) MHz Frequenza satellite-satellite GHZ Frequenza satellite-terra GHz Frequenza terra-satellite GHz Velocità di trasmissione per canale 2400 bps

rs232 Digital I/O RCM2000 main processor Solar array Charge controller battery Low battery switch power supply adc board Panels temperature Panels voltage Panels current Battery voltage Vessel temperature Arm temperature IRIDIUM data kit IRIDIUM phone antenna Level adapter Main processor monitor Data monitor on-off phone 8 channels igniter driver To and from igniters rs232 GPS receiver scientific adc (unused) antenna Attuale telemetria basata su IRIDIUM

U1 U2.1 U2.2 U2.3 U3 U4 U5 U6 U0 Boards description U0 : IRIDIUM Telephone U1 : CPU and GPS Receiver U2.1: Flux Gate (Ch1), unused U2.2: Flux Gate (Ch2), unused U2.3: Flux Gate (Ch3), unused U3 : ADC board U4 : power supply U5 : charge contoller U6 : igniters driver and tester Battery GPS Antenna IRIDUM Antenna Temperature sensor Panels connector Ballast / Release connector Testing connector Flux Gate Magn. conn. Boards 70 cm 10 cm Mechanical assembly PEGASO layout

Workshop ASI sulle Tecnologie ElettroOttiche ASI 14/10/2004 S. Masi