Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop.

Slides:



Advertisements
Similar presentations
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
Advertisements

Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
1 Tetsuhiko Yorita JASRI/SPring-8 Acc. Div. SPring-8 Vacuum System Contents - Outline of Vacuum system - Pressure behavior - Some topics.
1 BROOKHAVEN SCIENCE ASSOCIATES Production of Vacuum Components H.C. Hseuh NSLS-II ASAC Review October 14-15, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Vacuum Systems H.C. Hseuh, Vacuum Group Leader 8 th ASAC Meeting for NSLS-II Project May 10-11, 2011.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
SR Vacuum Systems and Front Ends
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
NSLS-II ASAC Review, 10/9-11/06 H-C. Hseuh,…, SR Vacuum Systems Storage Ring Vacuum Systems H-C. Hseuh, C. Foerster, J. Hu, G. Mahler, S. Pjerov, S. Sharma,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SuperKEKB Vacuum System - for the positron ring - Y. Suetsugu KEKB Vacuum Group Outline Design and production status of key components Beam pipes for arc.
Activities on the Orbit Feedback System for the Super-SOR Light Source SRL-ISSP, University of Tokyo Norio Nakamura 3rd International Workshop on Beam.
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Matthew Cox VSSLS Workshop Barcelona Sept SLIDE 1 1 Diamond Light Source Vacuum Systems Matthew Cox
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
Recent Developments at Diamond Ian Martin On behalf of the Diamond Team Particle Accelerators and Beams Group Meeting Daresbury Laboratory 10 th April.
ALBA Vacuum System, E. Al-Dmour Vacuum Systems for Synchrotron Light Sources 12 th -13 th Sep ALBA Vacuum System ALBA VACUUM SYSTEM E. Al-Dmour On.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
MBA Magnets MultiBend Achromat Magnets 9/27/2013 Review By Mark Jaski.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
Abstract Storage Ring Vacuum and Interface to Magnets Hsiao-chaun Hseuh, NSLS-II Project This presentation provided a quick overview of the storage ring.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Automatic Machine Review Dec 2015 MAX IV Storage Rings Automation Pedro F. Tavares.
Status of the Diamond Light Source upgrade EuCARD2 topical workshop Barcelona, 23 April 2015 R. Bartolini. A. Alekou, M. Apollonio, R. Fielder, I. Martin,
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
SBS Magnet and Support Status Robin Wines June 2013.
BROOKHAVEN SCIENCE ASSOCIATES SR Vacuum Systems ASAC Review, 7/17-18/ of 21 Storage Ring Vacuum Systems H. Hseuh, Vacuum Group ASAC Review of NSLS-II.
A DDBA lattice upgrade of the Diamond ring R. Bartolini, C. Bailey*, M. Cox*, N. Hammond*, R. Holdsworth*, J. Kay*, J. Jones**, E. Longhi*, S. Mhaskar*,
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Extraction and beamline progress B.Goddard TE/ABT.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Welcome to the Second Topical Workshop on Instabilities, Impedance and Collective Effects (TWIICE 2) jointly hosted by Diamond Light Source and the John.
HL-LHC 11 T Dipole for DS Collimation 8 th to10 th December, 2014 D. Duarte Ramos, C. Mucher, L. Gentini, T. Sahner, H. Prin, R. Wawrowski, F. Savary,
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Plans for Diamond-II ESLSXX Workshop, Bessy II, 19 November 2012 R. Bartolini Diamond Light Source and John Adams Institute for Accelerator Science University.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
RAMI Paul Aden. RAMI Analysis Reliability Visual inspection during each shutdown Service schedule for necessary components Majority of components to have.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
Alignment of Insertion Device at Siam Photon Source
1 Workshop on Vacuum System Design for Synchrotron light Source ALBA - Barcelona, Sept New trends in the vacuum design and technology.
ELENA installation progress F. Butin / ELENA collaboration.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Diamond-II upgrade toward ultra-low emittance T. Pulampong University of Oxford Octoberfest October 2014 Royal Holloway, London.
Report Technical Director Storage-Ring-Installation Completed
PETRA III, Status and Upgrade
Status of the Diamond Light Source
ELENA installation and commissioning status
Low Emittance Rings 2014 Workshop
Challenges of vacuum chambers with adjustable gap for SC undulators
Update on Diamond II and DDBA upgrade
Snr Power Supply Engineer
Arc magnet designs Attilio Milanese 13 Oct. 2016
SOLEIL Fast Orbit Feedback System
The 11T cryo-assembly: summary of design and integration aspects
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
XFEL Collimation and Beam Switchyard Vacuum Issues
LARP Phase II Secondary Collimator RC-1
Electron Collider Ring Magnets Preliminary Summary
CRYOMODULE FINAL ASSEMBLY
Presentation transcript:

Engineering Integration of the Double- Double Bend Achromat (DDBA) into the Diamond storage ring Jim Kay Diamond Light Source Low emittance ring 2013 workshop

Insertion device BM beamline ID beamline The Concept Replace each bending magnet in the Double Bend Achromat (DBA) lattice with a pair of dipoles each forming a DBA i.e. a double- DBA or DDBA, with a new straight section between them to host an Insertion Device, thus converting a BM beamline into an ID beamline. Development of technology needed for a future major upgrade: Diamond-II

Fitting DDBA into a working SR 2.5 cm Shorter path length aligns new straight with BM ports RF frequency increases 22kHz per DDBA cell Sector gate valves in identical location as existing Existing ID straights and front ends unchanged A new 3m straight created suitable for ID 126mm

Engineering integration of Vacuum and Magnets Full DDBA cell Half DDBA cell assembly

Basic concept: copper vessels in the dipole magnets, stainless steel in the straights (need stainless steel for fast orbit feedback) Small vacuum vessels 29*20mm (H*V) external and 1mm wall NEG coated to achieve the required vacuum pressures. In-situ NEG activation All vessels have to be water- cooled to take the dipole radiation power load. Half cell vacuum vessel BPM locations Oval vessels help concentrate image currents top and bottom and give more vessel to pole tip clearance than circular

.. where the radiation goes, and can the vessel be cooled adequately … 100 degC water cooled stainless Dipole Ray Tracing and FEA

Each half of the DDBA fits on a 7m girder Re-use girder pedestals and motorised alignment system Vacuum vessel installation, Split the multipoles Mount C shape dipole sideways DDBA Assembly and Alignment

Existing 2m In-Vac length 2486mm Available gap 2775mm Pay attention to existing front ends and new ID here New Insertion Device location

ID Ray-trace First Configuration (with Finger Absorber)

ID Ray-trace Second Configuration (light passes through ID)

DN63 Valve BPM between bellows Cooled Taper Insertion Device Mid straight assembly

Electrical Engineering 24 control and power supply racks but need >3 more 1200 circuits Cabling dictates length of shutdown at 2 months Re-use cables where possible Match new magnets to existing power supplies Control and Power supply room Cable floor trenches Cable Tray 4 levels

Engineering Integration summary Done: - engineering layout which matches the lattice and magnet design - vacuum vessel solution looks feasible - NEG coating feasible and in discussion with CERN - feasible to accommodate full length in-vacuum ID in the new straight section - solutions exist for dealing with the radiation power in the new ID straight In progress: - finalise copper and stainless steel vessels - engineering of BPMs, vacuum vessel supports - shielding of BPMS and flanges from synchrotron radiation -new design for primary BPMs and bellows -Flange and RF/Vacuum gasket detail design -new girder design, cooling water distribution etc. Programme dates: -Design review Nov Installation June 2016

Thanks M. Apollonio, C.P. Bailey, R. Bartolini, M.P. Cox, R.T. Fielder, N.P. Hammond, M.T. Heron, R. Holdsworth, S.E. Hughes, J. Kay, E.C. Longhi, S. Mhaskar, T. Pulampong*, G. Rehm, J.C. Schouten, V. Smalyuk, A. Thomson, C.W. Thompson, R.P. Walker * JAI Dphil. student