Lesson 34 Horizontal Drilling

Slides:



Advertisements
Similar presentations
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE.
Advertisements

Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Chapter 5 HORIZONTAL DRILLING.
PETE 411 Well Drilling Lesson 17 Casing Design.
PETE 203 DRILLING ENGINEERING
9-Point Drilling Plan 9-Point Drilling Plan. Presentation Goals To Describe a Drilling Plan That… Is in compliance with Order #1. Is in compliance with.
Chapter 3 Casing design.
1 TIW CORPORATION A PEARCE INDUSTRIES COMPANY P.O. Box Houston, Texas U. S. A.
Environmental Drilling By: Josh Humphreys October 8,2006.
Petroleum Engineering 406
Innovations in drilling DAP 2015
PETE 411 Well Drilling Lesson 37 Coiled Tubing.
Lesson 14 Jet Bit Nozzle Size Selection
Drilling Engineering – PE 311 Drill Bit Optimization
Chapter 5 Drilling Techniques and Drilling Problems
Fundamentals of Onshore Drilling Fundamentals of Drilling
Granite Wash Casing Profile Texas Panhandle (District 10) Western Oklahoma OKC Granite Wash Conference – March 6, 2008.
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE.
PETE 411 Well Drilling Lesson 5 Hole Problems.
Fundamentals of Onshore Drilling
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach.
Lesson 36 Torque and Drag Calculations
INNOVATIONS IN DRILLING DAP 2015 MAARTEN MIDDELBURG FEBRUARY 25, 2015 DELFT.
PETE 411 Well Drilling Lesson 23 Gas Cut Mud.
Introduction to Underbalanced Drilling Technology(M2)
Introduction to Directional Drilling
Drilling Engineering – PE311 Rotary System
Lesson 4 Drilling Cost & Drilling Rate
Lesson 35 Wellbore Surveying Methods
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Chapter 1 RESERVOIR.
Lesson 25 Well Control, cont’d
Drilling String Design
New Fluid Solutions, Inc. NFS-BlackSeal ®. Overview Generally, the types of formations that are prone to lost returns are cavernous and vugular, naturally.
Offshore Drilling Operations Jeff Bugden Canada-Newfoundland Offshore Petroleum Board.
PETE 411 Well Drilling Lesson 9 Drilling Hydraulics - Hydrostatics.
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Dual Gradient Drilling Basic Technology Confidential to DGD JIP
Session 5: CASING DRILLING®
DRILLING.
Well Design PE 413.
1 Petroleum Engineering 406 Lesson 13 Shallow Water Flows.
Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Petroleum Engineering LESSON 19 Survey Calculation Methods.
Casing Design.
Directional Drilling and Deviation Control
Extended Reach Drilling and Completion Solutions in Deepwater Drilling Challenges in Deepwater ERD.
Chapter 5 Drilling Techniques and Drilling Problems
Petroleum Engineering 406 Floating Drilling
2015 International Petroleum Environmental Conference
ARTIFICIAL LIFT METHODS
Rotating System Students: DINESH JOSHI RAJNISH VERMA RAMDEEN BISHNOI
Petroleum Engineering 411 Well Drilling
TRIBOLOGY IN DRILLING OPERATION CHIH LIN, PHD AUGUST 29, 2013.
Oil and Gas Production 1 PRO 250 PowerPoint presentation created by Dr. Shauna Kocman used in CMC PRO250 with her permission under Creative Commons License.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
CASING.
Drilling & Measurements (D&M)
INSTRUCTOR © 2017, John R. Fanchi
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
Content Introduction Salient Points Offset well Analysis
Lesson 6C - Motion Compensation
Requirements and Challenges Extended Laterals
Horizontal We can divide horizontal wells into three general categories, based on their curvature from vertical to horizontal: Short radius: with the.
Coal Bed Methane Cementing Best Practices
Finding the Optimum BHA through Data Analytics & Modeling
Presentation transcript:

Lesson 34 Horizontal Drilling PETE 411 Well Drilling Lesson 34 Horizontal Drilling

Horizontal Drilling Why Drill Horizontal Wells? Relative Production Rates Relative Costs Types of Horizontal Wells Drilling Problems & Solutions How Popular is Horizontal Drilling? Examples

Why Drill Horizontal Wells? Increase Reserves Increase Production Rates Control Water Production Control Gas Production

Why Drill Horizontal Wells? Control Sand Production Produce From Thin Reservoirs Connect Vertical Fractures Produce Methane from Coal Seams Increase Injectivity - (steam, water, polymers, etc.)

Production Rates Oryx - Austin Chalk Vertical Horizontal Horizontal/Vertical Well Well Production Ratio B/D B/D 12 507 42 15 215 14 5 107 21

Production Rates Drilled 7 wells from 1986 to 1989. Drilled ~ 85 wells in 1990 Vertical Well Drilling Cost: 235 $/ft Horizontal Well Drilling Cost: 520-282 $/ft Cost Ratio: 2.2-1.2

Drilling Costs Austin Chalk (1993) Vertical well ~ $500,000 Recompletion as Horizontal Well ~ $375,000 New Horizontal Well ~ $1,000,000-2,000,000 ~ $100+/ft to $150/ft {these numbers are rough estimates only}

Rospo Mare - Italy

Prudhoe Bay Vertical Well: 3000 - 4000 B/D Horizontal Well: 10,000 - 12,000 B/D Production Ratio: 3 - 4 Vertical Well: 235 $/ft Horizontal Well: 520 - 282 $/ft Cost Ratio: 2.2-1.2

Long Radius (~1,000-3,000 ft) {~2-6 deg/100 ft} Medium Radius (140~700 ft) {~8-40 deg/100 ft} Short Radius (~20-40 ft) {~1.5-3 deg/ft} <1,000 ft ~5,000 ft ~8,000 ft

New Drilling Technology Measurement While Drilling (MWD) Directional Surverying and Control Indentification of Markers (identify zones) Top Drive Drill with 90-ft stands instead of 30-ft joints Circulate while pulling drillpipe out of hole Rotate drillpipe while pulling out of hole

New Drilling Technology Mud Motors Drill without rotating pipe Change hole direction while drilling Steerable systems

Potential Problems in Horizontal Drilling Running equipment in and out of hole drillstring, casing, cables Preventing/Remedying differential sticking Excessive torque

Potential Problems in Horizontal Drilling Cleaning the hole and preventing cuttings from settling along the hole bottom Controlling weight on bit to achieve and maintain directional control Cementing casing or liner

Summary Horizontal wells may produce at 3-5 times the rate of vertical wells in the same area (… as much as 20 times higher in special cases). Horizontal wells typically cost 1.5-3 times as much as vertical wells in the same area. Horizontal wells are often very attractive in formations with extensive vertical fractures.

Summary The use of horizontal wells has been growing - worldwide. Horizontal wells has increased our recoverable reserves. In the U.S. one rig in ten is drilling horizontal wells. (1994) (1998) Today ~ one rig in fifteen is drilling horizontal wells. (2002)

Long - Radius Wells Used for achieving large horizontal displacements from platforms or drilling pads Used for achieving very long horizontal sections (to 6,000 ft +) Build Rate: ~ 2-6 degrees/100 ft Build Radius: ~ 1,000-3,000 ft Length of Horiz. Section: 1,000 - 8,000 ft (1995)

Method: Use conventional directional drilling technology Use rigid bottom hole assemblies, motors & bent subs, stabilizers or Use Navigation drilling systems with “steerable” drilling motors

Medium - Radius Wells Build Rate: ~ 8 - 20 degrees/100 ft (up to 40 deg/100 ft in some cases) Build Radius: ~ 300 - 700 ft Length of Horiz. Section: 1,000-6,000 ft

Method: Use modified long-radius drilling technology Use different motors for Angle Build and Angle Hold sections. Use a “Tangent Section” between the two build sections Use compressive service drillpipe through the curve if Build Rate > 15 deg./100 ft. (CS drillpipe has integral wear knots every ~ 10 ft)

Short-Radius Wells Build Rate: ~ 1 - 3 degrees/ft Build Radius: ~ 20 - 40 ft Length of Horiz. Section: 200 - 1,000 ft

Method: Two downhole motor designs are available Drill vertical “rathole” to identify horizon Build angle with special curve-drilling assembly with a non-rotating shell that gives curvature to the tool After building angle to horizontal, use a special angle-hold assembly: this consists of two undergauge stabilizers behind the bit, and flexible drillpipe.

Horizontal Well Pair

Horizontal Well Pair

Vertical Injection Wells and Horizontal Production Well