Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor.

Slides:



Advertisements
Similar presentations
New Source Review NSR Reforms Oklahoma Department of Environmental Quality Air Quality Council Presented by Matt Paque, Attorney, ODEQ - AQD April 20,
Advertisements

New Source Review (NSR) Program Basics
Richard (Rick) Goertz, P. E
AWMA Meeting October 15, 2013 Stack testing issues and questions Dennis Thielen.
CP Efficiency: The Path to Success Sarah Piziali, Construction Permit Section Supervisor.
Air Toxics Rule Changes (pursuant to Session Law ) North Carolina Division of Air Quality July 2013 Environmental Management Commission.
Dispersion Modeling Jim McGraw Program Development Supervisor.
Iowa Title V Operating Permits Lori Hanson, Title V Operating Permit Section Supervisor.
New Federal Regulations for Internal Combustion Engines Doug Parce.
Air Permitting Overview.
Overview of the Tribal New Source Review (NSR) Rule U.S. Environmental Protection Agency Office of Air Quality Planning and Standards (OAQPS) Research.
Clean Air Act and Permits
Air Quality 101: Clean Air Act Overview/ Update. 2 Origins of the Clean Air Act Historic air pollution Donora, Pennsylvania, – PSD, tribes.
Air Quality Regulations and Academic Institutions Steve Hall Environmental Engineer II NC DENR – Division of Air Quality Raleigh Regional Office.
Defining Air Quality: The Standard-Setting Process Chapter 10.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
A Proposal to Fund the Air Quality Bureau of the Iowa Department of Natural Resources Mick Durham.
Compliance Assistance and Ambient Air Monitoring Brian Hutchins Supervisor, Air Quality Bureau July 2014.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
© Jeffer, Mangels, Butler & Marmaro LLP 1 Programmatic New Source Review November 2, 2005 Malcolm C. Weiss Jeffer, Mangels, Butler & Marmaro LLP 1900 Avenue.
What is the purpose of the Class I Redesignation Guidance? Provides guidance for tribes who are considering redesignating their areas as Class I areas.
Lori Hanson Title V Operating Permit Supervisor (515)
Air Quality Regulations – What’s New? (for Ethanol Plants) Shelley Schneider Air Quality Division Administrator.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
Flexible Air Permitting Innovation Done Right State-EPA Innovations Symposium Denver, CO January 24, 2006.
Defining Air Quality: The Standard-Setting Process
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Sound solutions delivered uncommonly well Understanding the Permitting Impacts of the Proposed Ozone NAAQS Pine Mountain, GA ♦ August 20, 2015 Courtney.
Clean Air Act and New Source Review Permits EPA Office of Air Quality Planning and Standards Research Triangle Park NC March
LEGAL ASPECT OF WASTE MANAGEMENT (INTERNATIONAL) NURUL MAISYARAH BINTI SAMSUDIN NORAINI BINTI ABD RAHMAN NOR AINI OTHMAN NUR NAZNIN BINTI ISHAK.
Greenhouse Gas (GHG) Permit Training Other Aspects of PSD Title V Permitting.
The Clean Air Act. Overview of the Clean Air Act tool kit: multiple strategies cathedral: not put together at one time.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
Region 9 Title V Permit Review Guidelines Ray Vogel EPA/OAQPS.
1 Non-Attainment NSR Program Donald Law EPA Region 8.
PSD/Nonattainment Review You can do this! Marc Sturdivant Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2015.
New Source Review Rules Update Jessica Montanez U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Policy Division.
Clean Air Act SAFE 210. Purpose Protect public health and regulate air emissions Addresses both stationary and mobile sources.
1 NSR Rule Review and Guidance 25 Pa. Code, Chapter 121. General Provisions Chapter 127 Subchapter E. New Source Review The Allegheny Mountain Section.
Florida Department of Environmental Protection Air Quality Standards and Nonattainment Updates Rule Development Workshop Chapter , F.A.C. October.
Current State Issues in Title V Permitting Matthew A. Paque Environmental Attorney Supervisor Oklahoma Department of Environmental Quality Office of General.
Carrie Paige – EPA Region 6, Dallas David Cole – EPA OAQPS, RTP, NC Introduction to Air Permits Introduction to Air Permits.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
NSR—Minor New Source Review Darrel Harmon U.S. EPA Office of Air and Radiation.
Resource Management Planning Air Quality Brock LeBaron Department of Environmental Quality Division of Air Quality
Clean Air Act The law that defines EPA's responsibilities for protecting and improving the nation's air quality and the stratospheric ozone layer. Draft.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
Title V – Increasing Efficiency Lori Hanson, Title V Operating Permit Section Supervisor.
1 Public Workshop to Discuss Amendments to the AB 2588 “Hot Spots” Emission Inventory Criteria and Guidelines Regulation California Air Resources Board.
Tailoring Rule - Title V Scenarios July 20, 2010 Katherine N. Blue Principal Consultant, Climate Change Services trinityconsultants.com Troutman Sanders/Trinity.
PSD/Nonattainment Applicability Arturo J. Garza Air Permits Division Texas Commission on Environmental Quality Environmental Trade Fair 2016.
Iowa Waste Reduction Center Jennifer Wittenburg - Program Manager
New Source Review (NSR) Program Basics
Flexible Air Permitting
Clean Air Act Glossary.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
Clean Air Act (CAA) Purpose
Clean Air Act of 1963,1965, 1970,1977,1990(CAA) Kaylee Kirpatrick.
Overview of New Source Review (NSR)
Major New Source Review (NSR) Part 2
Boiler Sheltered Initiative
National Ambient Air Quality Standards (NAAQS) Part 5: NAAQS and NSR
Kansas Air Quality Seminar March 5, 2008
Air Quality Permitting
Major New Source Review (NSR)—Part 1
Air Quality and Environmental Compliance Assistance Seminar Air Quality & New Projects Mike Sundblom, Director Pinal County Air Quality.
Uinta Basin General Conformity
Presentation transcript:

Air Construction Permitting Services Sarah Piziali, Construction Permit Section Supervisor

Presentation Outline Section Organization and Staffing Construction Permit Overview Construction Permit Section Statistics Construction Permit Section Process Improvements 2

Construction Permit Service Value Provide assistance to business and industry through: – Fast permit issuance – Permit applications – Rules and regulations While ensuring: – Economic growth occurs in harmony with the preservation of air resource – Public health and welfare is protected 3

Construction Permit Staff 15 Total Staff consisting of: - 5 Senior Environmental Engineers - 9 Environmental Engineers 4

Construction Permit Overview 5

Construction Permit Program In Iowa our rules require: – Unless exempt, all new or modified equipment and control equipment is required to obtain a construction permit if constructed after 9/23/70 Currently 41 specific exemptions from construction permitting listed in our rules – Ex. Equipment used for indirect heating burning natural gas or propane rated at < 10 MMBTU/hr heat input 6

Critical Services Beyond Permitting We also provide technical assistance to Business and Industry, the Public and the rest of the Air Quality Bureau: – Economic Development Prospects – Permit Helpline – Applicability Determinations / Assistance – Emissions Estimation Assistance – Review and Assist Local Programs – SIP / Non-Attainment Plan Development – Rules Review 7

Types of Air Quality Permits in Iowa Construction Permits Issued under New Source Review (NSR) Program established by the CAA of 1970 and subsequently amended Issued prior to construction Permit is obtained for each emission point Term: Life of equipment Applies to all facilities in Iowa (~7200) Operating Permits (Title V) Requirement from Title V of the CAAA of 1990 Issued to sources after start operation One permit is issued for the entire facility Term: 5 years Applies to largest facilities in Iowa (~300) 8

Categories of Construction Permits Minor NSR Permits Minor New Sources Minor Modifications at Existing Sources 567 IAC Chapter 22 Major NSR Permits Major New Sources Major Modifications at Existing Sources Attainment Areas (Areas meeting NAAQS) Prevention of Significant Deterioration (PSD) 567 IAC Chapter 33 Non-attainment Areas (Areas not meeting NAAQS) Non-Attainment NSR (NA NSR) 567 IAC Chapter 31 9

Minor Source: < 100 TPY of any pollutant if listed source category or; < 250 TPY of any pollutant Modification to a Minor Source : < 100 TPY increase of any pollutant if listed source category; < 250 TPY increase of any pollutant Minor Modification to a Major Source: TPY increase < Significant Emission Rate (SER) [see slide 9] Minor NSR Permits in Attainment Areas 10 Minor NSR Permits Minor New Sources Minor Modifications at Existing Sources 567 IAC Chapter 22 Attainment Areas (Areas meeting NAAQS) Applicability Thresholds from 567 IAC Chapter 33

Minor Source: < 100 TPY of any pollutant* Modification to a Minor Source : < 100 TPY increase of any pollutant* Minor Modification to a Major Source: TPY increase < Significant Emission Rate (SER) [see slide 9] Minor NSR Permits in Non-attainment Areas 11 Minor NSR Permits Minor New Sources Minor Modifications at Existing Sources 567 IAC Chapter 22 Non-attainment Areas (Areas not meeting NAAQS) Applicability Thresholds from 567 IAC Chapter 31 * Minor source threshold changes for CO, VOC, NO X and PM 10 depending on non-attainment classification

Minor Modifications to Major Sources 12 Minor Modifications to a Major Source: TPY Increase < Significant Emission Rate (SER)* Minor NSR Permits Minor New Sources Minor Modifications at Existing Sources 567 IAC Chapter 22 Pollutant SER (TPY) Pollutant SER (TPY) PM25Pb0.6 PM 10 15Fluorides3 PM H 2 SO 4 7 NO X / SO 2 / VOC40H 2 S / TRS / RSC10 CO100 *SER changes for CO, VOC and NO X depending on non-attainment classification

“Synthetic Minor” Projects “Synthetic Minor” Modifications or Sources – Involve establishing a restriction to avoid state/federal regulation Ex. PSD, NA NSR, Title V, National Emissions Standards for Hazardous Air Pollutants (NESHAP), etc. – Can apply to a specific project or entire facility – Classified as Minor NSR Projects for both Major and Minor Sources – Represents a significant number of permits issued by Construction Permit staff 13

Major NSR Permits in Attainment Areas Major NSR Permits Major New Sources Major Modifications at Existing Sources 14 Major Source : ≥ 100 TPY of any pollutant if listed source category or; ≥ 250 TPY of any pollutant Major Modification to a Minor Source: ≥ 100 TPY of any pollutant if listed source category or; ≥ 250 TPY of any pollutant Major Modification to a Major Source: TPY Increase ≥ Significant Emission Rate (SER) [see thresholds on slide 9] Attainment Areas (Areas meeting NAAQS) Prevention of Significant Deterioration (PSD) 567 IAC Chapter 33

Major NSR Permits in Non-attainment Areas Major NSR Permits Major New Sources Major Modifications at Existing Sources 15 Major Source: ≥ 100 TPY of any pollutant* Major Modification to a Minor Source: ≥ 100 TPY of any pollutant* Major Modification to a Major Source: TPY Increase ≥ Significant Emission Rate (SER) [see thresholds on slide 9] Non-attainment Areas (Areas not meeting NAAQS) Non-Attainment NSR (NA NSR) 567 IAC Chapter 31 *Major source threshold changes for CO, VOC, NO X and PM 10 depending on non-attainment classification

Construction Permit Statistics 16

Types of Construction Permit Projects Standard Any Project that is Not Classified as Complex PSD / NA NSR Complex New Major Sources in both Attainment and Non- attainment Areas Major Modification at Existing Sources in both Attainment and Non-attainment Areas Amendments to PSD / NA NSR Permits (even if change is not a major modification) 17 Greenfield Ethanol Plants PSD / Non-attainment NSR Netting PSD / Non-attainment NSR Synthetic Minor Projects involving Legal (e.g. Consent Order, Compliance Order, Permit Appeal) State Implementation Plan Maintenance Area Changes Any other Project requiring Public Comment Other Complex

Construction Permit Statistics 5-yr Average (2009 – 2013) 2014 (as of 7/14/14) Standard Projects Standard Permit Actions Standard Project Average Leadtime61 days84 days PSD/NA NSR Complex Projects206 PSD/NA NSR Complex Permit Actions PSD/NA NSR Complex Project Average Leadtime 204 days 180 days Other Complex Projects3510 Other Complex Permit Actions Other Complex Project Average Leadtime 235 days267 days 18

19 Construction Permit Project History

20 Construction Permit Backlog

Construction Permit Process Improvements 21

Construction Permit Improved Efficiency Original Core Process Event – 1 st Kaizen of State Government – Focus: Construction Permit review process and permit leadtime – Decreased leadtime from a pre-event start of 120 days CP Complex Permits Event – Focus: Reduce leadtime for complex projects – Established current leadtime goals: 180-days for PSD Complex Projects [now includes NA NSR] 90-days for all other Complex Projects 22

Construction Permit Improved Efficiency Re-visit of the Original Core Event – Focus: Attain new improvements to the construction permit process and continue the lean journey – Established current leadtime goal: 30-day for Standard Projects Significant Application Form Revisions Stack Test JAD/Process Improvement Event – Focus: Develop stack test system data requirements and improving the use of existing stack test data – Assist staff in faster permit issuance through organization of completed and outstanding stack tests 23

Construction Permit Improved Efficiency Construction Permit Application Review Process Improvement – Focus: How a construction permit application is reviewed by an engineer – Resulted in increased consistency in application review and in construction permits issued AQB Value Stream Mapping – Focus: All work done is supporting Bureau and Section goals – Eliminated engineer’s spending time on VOP Program Assisted 19 facilities in exiting the program 24

Construction Permit Improved Efficiency 2014 Future Streamlining - Construction Permit Forms and Instruction Improvements – Focus: Making forms more simple and straightforward Reduce requests for additional information Align construction permit forms with current rules and regulations 25

Sarah Piziali Construction Permit Supervisor (515)

Air Construction Permit Helpline AIR-IOWA Questions? 27