Chapter 5. Methods of estimating times and costs Using Learning curves Types of costs.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project Cost Management
Project Management 6e..
Estimating Project Times and Resource Costs
Project Cost Management Estimation Budget Cost Control
Estimating Project Times and Costs
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
BUS 4017 Project Mgt. Wk. 9 Prof.essor Fred Pentney 1 Agenda. HR and Bus. program Estimates, costs, budgets, forecasts, variances and control Resource.
Degree and Graduation Seminar Cost Management
Time and Cost Estimation
Estimating Project Time and Cost
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
What is Project Cost Management?
LSU 07/25/2004Estimating Costs1 Estimating Project Costs & Time Project Management Unit, Lecture 5.
Project Cost Management
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
Quiz#1 Chapter 5: Estimating Project Times and Cost
What is Project Management? How does it affect how you do your job?
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
GE 121 – Engineering Design Engineering Design GE121 Managing The Design Process Lecture 11A.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Project Cost Management
McGraw-Hill/Irwin© 2008 The McGraw-Hill Companies, All Rights Reserved Estimating Project Times and Costs Chapter 5.
Software Project Management (SPM)
ISIBP01-Project Management
LECTURE IV. o Project HRM include the processes that organize, manage and lead the project team. o The project team is comprised of the people with assigned.
Management & Development of Complex Projects Course Code - 706
Project Cost Management
Estimating Project Times and Costs
Estimating projects Estimating  The process of forecasting or approximating the time and cost of completing project deliverables  The task of balancing.
Estimating Project Times and Costs CHAPTER FIVE PowerPoint Presentation by Charlie Cook Copyright © 2014 McGraw-Hill Education. All Rights Reserved.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Estimating Project Time and Cost
Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved. 10/27/07 SJSU - Bus. 286 David Bentley (Gray & Larson)1 Chapter 5 – Estimating.
Name of Project Student Name Independent Research Project.
Project Cost Management. What is Cost and Project Cost Management? Cost is a resource sacrificed or foregone to achieve a specific objective or something.
5 Ir. Haery Sihombing/IP Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka Project Management Estimating Project Times.
Switch off your Mobiles Phones or Change Profile to Silent Mode.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Project Cost Management
Project Management 6e..
Project Management 6e..
Estimating Project Times and Costs
Project Cost Management
ESTIMATING PROJECT TIME, COST & BUDGETING
ESTIMATING PROJECT TIME, COST & BUDGETING
Chapter 7: Project Cost Management
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Estimating Project Times and Costs
Project Management -- Estimating Time and Cost
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Estimating Project Times and Costs
ESTIMATING PROJECT TIME, COST & BUDGETING
Estimating Project Times and Costs
Estimating Project Times and Costs
Project Cost Management
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
What is Project Cost Management?
Project Management Process Groups
Project Cost Management
Estimating Projects Estimating Types of Estimates
Estimating Project Times and Costs
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Presentation transcript:

Chapter 5

Methods of estimating times and costs Using Learning curves Types of costs

Direct Costs – Costs that are clearly chargeable to a specific work package. Indirect Costs – Costs incurred that are not directly tied to an identifiable project deliverable or work package. Special Case Costs – “estimated costs” usually assigned to task that has been done over and over. Sunk Costs – Those costs that are unrecoverable. Capital Costs – Assets that have a useful life, year or more.

5–4 Estimating – The process of forecasting or approximating the time and cost of completing project deliverables. – The task of balancing expectations of stakeholders and need for control while the project is implemented.

5–5 EXHIBIT 5.1 To support good decisions. To schedule work. To determine how long the project should take and its cost. To determine whether the project is worth doing. To develop cash flow needs. To determine how well the project is progressing. To develop time-phased budgets and establish the project baseline.

5–6 Quality of Estimates Project Duration People Project Structure and Organization Padding Estimates Organization Culture Other (Nonproject) Factors Planning Horizon

5–7 1.Have people familiar with the tasks make the estimate. 2.Use several people to make estimates. 3.Base estimates on normal conditions, efficient methods, and a normal level of resources. 4.Use consistent time units in estimating task times. 5.Treat each task as independent, don’t aggregate. 6.Don’t make allowances for contingencies. 7.Adding a risk assessment helps avoid surprises to stakeholders.

Order of Magnitude – “seat of your pants” estimate with very little thought or preparation – Before it is stated, stress it is very rough and limited in accuracy Budget Estimate – More accurate and requires some research – Can use historical data

Definitive Estimate – Most accurate – Use the WBS completed and tested for accuracy – Include contingency allowances – lump sum amt. – Includes: training, testing, travel, monitoring, etc. Pro Forma Assessments – Initial profile of project costs – Can be order of magnitude, budget, or definitive estimates – Are refined until there is a particular level of comfort

Bottom- up – Most time consuming and most expensive – Uses WBS where each task is estimated and then added together as reverse upward. – Tendency to “pad” as one goes Parametric Procedures Applied to Specific Tasks – Using Industrial Engineering standards and analysis – Involves cost per sq. ft., linear foot, etc.

Macro (Top-down) Approaches – Consensus methods – Expert judgment – Apportion method – Learning curves

Fairly certain if done before in other projects – derive average duration from historical data Some projects books available containing mean tables for typical activities Ask around

Four categories of resources – Money – Materials – Machines – People Questions to ask? – Who and what are needed? – Who and what can do the work? – Who and what are available? – What level and competence is required?

5–14 Reasons for Adjusting Estimates – Interaction costs are hidden in estimates. – Normal conditions do not apply. – Things go wrong on projects. – Changes in project scope and plans. Adjusting Estimates – Time and cost estimates of specific activities are adjusted as the risks, resources, and situation particulars become more clearly defined.

WBS Resource Matrix Gantt chart: a bar chart showing both the amount of time involved and the sequence in which activities can be performed LO 3

Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Time Vertical Axis: Always Activities or Jobs Horizontal Axis: Always Time Horizontal bars used to denote length of time for each activity or job.

A person engaged in a repetitive task will improve his/her performance over time. Airline industry was first industry to use Learning curves

To determine Learning Curve rate: T2/T1 = T4/T2=T6/T3=T8/T4 To determine time to produce nth or n units:

5–19 TABLE A5.1

5–20 TABLE A5.2