1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 16 Scheduling.
Operations Scheduling
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Operations Scheduling
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Chapter 16 Scheduling Scheduling
Operations Management
Scheduling. Characteristics of a “job” Constituent operations Constituent operations Due date Due date Time of arrival in shop Time of arrival in shop.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Operations Management R. Dan Reid & Nada R. Sanders
Operations Management
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
Industrial Systems Engineering Dept. İzmir University of Economics
Chapter 16 Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling Operations Scheduling Chapter Scheduling The Hierarchy of Production Decisions The logical sequence of operations in factory planning.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
1 Slides used in class may be different from slides in student pack Chapter 19 Operations Scheduling  Work Center Defined  Typical Scheduling and Control.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
Activity Scheduling and Control
Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
Scheduling Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Chapter 16: Learning Objectives Instructor Slides You should be able to: 1.Explain what scheduling involves and the importance of good scheduling 2.Describe.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Production Activity Control
Chapter 15 Scheduling McGraw-Hill/Irwin
CHAPTER 8 Operations Scheduling
Chap 11 Learning Objectives
Scheduling Scheduling is an important tool for manufacturing and service industries, where it can have a major impact on the productivity of a process.
Introduction to Scheduling Chapter 1
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Production and Operations Management
Scheduling Seminar exercises
Presentation transcript:

1 Chapter 15 Scheduling

2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when” question for activities Scheduling Build A A Done Build B B Done Build C C Done Build D Ship JANFEBMARAPRMAYJUN On time!

3 High-Volume Systems Flow system: High-volume system with Standardized equipment and activities. –Assembly line balancing –Auto, computer industry Flow-shop scheduling –Due to Repetition, scheduling is not a big issue Project scheduling Work Center #1Work Center #2 Output

4 High-Volume Success Factors Process and product design Preventive maintenance Rapid repair when breakdown occurs Optimal product mixes –Most profit subject to capacities = LP Minimization of quality problems Reliability and timing of supplies

5 Intermediate-Volume Systems Outputs are between standardized high- volume systems and made-to-order job shops Economic run size:

6 Scheduling Low-Volume Systems Low volume systems –Minimal repetition –Schedule from scratch every time Loading - assignment of jobs to process centers Sequencing - determining the order in which jobs will be processed –Sequencing vs. Scheduling

7 Gantt Load Chart Gantt chart - used as a visual aid for loading and scheduling –Resources into rows –Time periods into columns

8 Infinite loading: unlimited capacity, like MRP Finite loading: consider capacity Schedule construction –Vertical loading Load on 1 work center with different jobs at once –Horizontal loading Load operations of 1 job to all work center at once Forward scheduling –Too much wip Backward scheduling – Risky Loading

9 Sequencing Priority rules: Simple heuristics used to select the order in which jobs will be processed. Job time: Time needed for setup and processing of a job. It includes set up time unless setup times are sequence dependent Everything is #1 Priority

10 Priority Rules FCFS - first come, first served SPT- shortest processing time EDD- earliest due date CR- critical ratio =time remaining / processing time S/O- slack per operation =slack remaining / # of operations remaining Rush- emergency

11 Performance measures Flow time of a job: Duration of time from a job enters into the system until it leaves Lateness of a job: Amount by which completion date exceeds due date. Could be negative. Tardiness=max(lateness,0) Makespan: total time needed to finish a group of jobs Average number of jobs until the last is finished: =Total flow time / Makespan

12 Example: Average number of jobs Jobs: A and B with processing times 10 each A finishes at 10 Number of jobs 1 2 B finishes at 20 Time Makespan=20, Total Flow time=10+20 Average number of jobs=30/20 Average number of jobs

13 Example: Sequencing rules JobsProcessing timeDD=Due date A1161 B2945 C31 D133 E232

14 Ex: FCFS JobsProc.timeFlow timeDDLateTardy A B C D E Total Aver

15 Ex: SPT to minimize the total flow time JobsProc.timeFlow timeDDLateTardy D E A B C Total Aver

16 Ex: EDD to minimize the maximum lateness JobsProc.timeFlow timeDDLateTardy C31 00 E D B A Total Aver

17 235/74= EDD 135/74= SPT 268/74= FCFS Average Number of Jobs at the Work Center Average Tardiness (days) Average Flow Time (days)Rule Example summary

18 Two Work Center Sequencing Johnson’s Rule: technique for minimizing completion time for a group of jobs to be processed on two machines or at two work centers. Minimizes total idle time and the makespan Several conditions must be satisfied

19 Johnson’s Rule Conditions Job time must be known and constant Job times must be independent of sequence Jobs must follow same two-step sequence Job priorities cannot be used All units must be completed at the first work center before moving to the second

20 Johnson’s rule 1. Select a job with the shortest processing time If the processing time is on the first workcenter Schedule the job right after the already scheduled at the beginning of the list If the processing time is on the second workcenter Schedule the job right before the already scheduled at the end of the list 2. Cross out the scheduled job and go to 1

21 Example: Johnson’s rule JobProcessing time on 1Processing time on 2 A1525 B86 C124 D2018

22 The sequence that minimizes the makespan A - D - B - C Idle time = 28 Makespan = 68 MC1 MC2

23 Sequence dependent set up times Set up is basically changing the work center configuration from the existing to the new Set up depends on the existing configuration Set up time of an operation depends on previous operation done on the same work center Which sequence minimizes total set up time? There are too many sequences!

24 Scheduling Service Operations Bottleneck operations Appointment systems –Controls customer arrivals for service Consider patient scheduling Reservation systems –Estimates demand for service Scheduling the workforce –Manages capacity for service Scheduling multiple resources –Coordinates use of more than one resource