C.3 in MRP 2.0 What to Expect (as of March 17, 2015) Dan Cloak.

Slides:



Advertisements
Similar presentations
Review & Update of the Stormwater C.3 Guidebook Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Advertisements

Construction of Facilities Dan Cloak Environmental Consulting Construction Workshop, May 2, 2012.
Operation & Maintenance Requirements: Tips for Keeping Your Agency in Compliance Kristin Kerr, P.E., QSD EOA, Inc. New Development Workshop May 22, 2013.
Preparing a Stormwater Control Plan Stormwater C.3 Guidebook 6 th Edition.
Click to edit section. Low-Impact Development and Green Infrastructure - EPA  Low-impact development is an approach to land development (or re-development)
What’s New in the Fifth Edition Dan Cloak Environmental Consulting May 23, 2011.
Simplified Sizing Tool for LID Practices in western Washington Alice Lancaster, PE Herrera Environmental Consultants.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Physical Properties of Bioretention Soils Scott Wikstrom City of Walnut Creek.
Where are the regulations going? Dan Cloak Environmental Consulting May 23, 2011.
Low Impact Development Best Management Practices
Low Impact Development for Stormwater Treatment and Hydrograph Modification Management in California Dan Cloak, Principal Dan Cloak Environmental Consulting.
Storm Water Management and Erosion/Sediment Control Storm water management reduces quantity, and improves quality, of runoff in the watershed Site based.
Bioretention Design Getting the Details Right. Coordination of Plans Curb elevations, grade breaks, architectural plans consistent with delineation of.
Better Site Design Sustainability & Stormwater
Bioretention soil test demonstration Carlton Thompson and Jeff Cowling.
Stormwater Management 101: Implementation Options through Partnerships
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Implementing MRP Provision C.3 Stormwater NPDES Compliance For New Developments.
6 th Edition CCCWP Management Committee February 15, 2012.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Integrating LID Into the Development Planning Process.
Open Space Residential Development Bylaw Town of Rehoboth.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
PUBLIC WORKS DEPARTMENT Environmental Streamlining Taskforce Meeting July 20, 2011.
To Meet NPDES Retention and Hydromodification Management Requirements Tom Dalziel Program Manager, Contra Costa Clean Water Program Dan Cloak Dan Cloak.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Background and Overview Stormwater NPDES Compliance For New Developments.
Dan Cloak, P.E. 18 September 2007 to achieve water quality benefits in Contra Costa County Implementing Low Impact Development.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Putting the “LID” on Water Pollution New Water Quality Requirements for Land Use County of Orange Mary Anne Skorpanich Richard Boon.
Community Development Department Community Development Department Shoppes of Palm Coast Nonresidential Controlling Master Site Development – Tier 2 Application.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Stormwater Treatment and Flow Control Dan Cloak, P.E. Presentation to the San Diego Region Co-permittees Hydromodification Workgroup December 6, 2006 Contra.
What’s New in Stormwater Requirements for Development Projects? Jill Bicknell, P.E. EOA, Inc. New Development Workshop May 22, 2013.
Stormwater Treatment and Flow Control Dan Cloak Presentation to the Citizens Advisory Committee November 13, 2006 Options for implementing new Phase II.
Stormwater Treatment and Flow-Control Requirements in Phase I and Phase II Municipal NPDES Permits Dan Cloak, Principal Dan Cloak Environmental Consulting.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Hydrograph Modification Management in Contra Costa County Dan Cloak, P.E. Dan Cloak Environmental Consulting.
Regulatory Refresher What Construction Site Inspectors Need to Know about the MRP Kristin Kerr, P.E., QSD EOA, Inc. Construction Inspection Workshop April.
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
Low Impact Development for Compliance with NPDES Treatment and Hydrograph Modification Management Requirements in Contra Costa County Tom Dalziel, Assistant.
Countywide Model SUSMP July 17, Topics SUSMP Timeline Goals Approach to Compliance NPDES Permit Requirements NPDES Permit Requirements Model SUSMP.
Low Impact Development (LID)
Low Impact Development [presenters name] [presentation date] Integrated Management Practices Controlling Stormwater Quality and Quantity using.
Post-Construction Requirements Design Challenges Dan Cloak, P.E.
Operation & Maintenance of Permanent Stormwater Controls Overview of Inspection Requirements Laura Prickett, AICP, CPESC EOA, Inc. Construction Inspection.
Kitsap County Department of Public Works CRAB – November 04, 2015 Bioretention Stormwater BMP Benson Burleson Design Engineer
1 Provision C.3. New and Redevelopment Performance Standards Sue Ma Water Quality Control Board San Francisco Bay Region November 15, 2006.
Analyzing a Development Site for Low Impact Development design.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
Public Hearing Seattle Ridge Preliminary Plat/ Planned Area Development PP December 18, 2013.
Low Impact Development Practices. What is Low Impact Development (LID)? LID is an approach to land development (or re- development) that works with nature.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Sustainable Vineyard Practices Replanting Strategies & Economics December 13, 2012 Conditional Waiver of Waste Discharge Requirements Vineyards in Napa.
Parking Lot Design Civil Engineering and Architecture
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Green Infrastructure Contractor Training Program 5WKS COST FREE
Land Use and Zoning Committee Special Workshop
Sacramento County Stormwater Quality Program
GREEN INFRASTRUCTURE PLAN FOR (Permittee)
Green Infrastructure Planning Update
Green Infrastructure Planning Update
Alternative Compliance for New Developments
Sacramento County Stormwater Quality Program
Presentation transcript:

C.3 in MRP 2.0 What to Expect (as of March 17, 2015) Dan Cloak

What’s Unlikely to Change Threshold for Regulated Projects Requirements for Small Projects Exclusions, including those for roads 50% Rule Alternative compliance Ambiguities related to applicability Organization of permit provision Reporting (except for Special Projects)

MRP 2.0: What’s Likely to Change Design specs for pervious pavement Operation and maintenance verification –Apply to pervious pavements –Enforcement response plan required Green Infrastructure Plan

Still under discussion (as of 3/17) Grandfathering Infiltration and Harvest/Reuse Feasibility Soil Specification (Attachment L) Hydromodification Management Special Projects –Intention to eliminate in next permit term –Tweaks to definitions of density required –More explicit analysis of bioretention feasibility

Stormwater Control Plans What to Look for During Your Review Dan Cloak

Four Questions for SCP Review Does it meet Provision C.3 requirements? –All impervious areas accounted for? –Features and facilities adequately sized? –Facilities properly designed? Is it congruent with the project design? –Site Plan –Grading and Drainage Plan –Landscaping Plan

Four Questions for SCP Review Is it buildable? –Slopes –Soils –Setbacks and allowable uses –Other project requirements Is it the best design for this project? –Most effective stormwater treatment –Cost effective and maintainable –Best for municipality and community

Exhibit Entire site divided into DMAs Locations and sizes of LID facilities

Drainage Management Areas

Surface Drainage

Before Entitlements Delineation of DMAs is consistent with preliminary grading and drainage design Each bioretention facility is level and flat Facilities are shown in artist renderings Facilities do not create conflicts with vehicle and pedestrian circulation Landscaping plans show bioretention facilities with appropriate plant palette

Bioretention Facilities What to Look for During Plan Check Dan Cloak

Revisions to Preliminary Plans Site Plan Grading and Drainage Plan Landscaping Plan

Page 76 Bioretention Design Specs

Bioretention Functions infiltration evapotranspiration Discharge (biotreatment) losses

Flat with raised underdrain Or this Not this

Elevations

Overflow Elevation Overflow elevation

Underdrain Elevation

Protection of Adjacent Structures

Utilities

Discussion

Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling

Reviewing Bioretention Soil Submittals Dan Cloak, Carlton Thompson, and Jeff Cowling

Background On the bioretention soil specification Dan Cloak

Soil Specifications Milestones Early bioretention specifications called for “sandy loam” with a minimum infiltration rate of 5"/hr. Municipal staff developed a “bucket test” and then the “dirt bong” to check the infiltration rate Staff encountered difficulty obtaining consistent and repeatable results from test

Soil Specifications Milestones More consistent results could be obtained by an engineered soil (sand/compost mix) Contra Costa developed and refined a specification (2008) MRP 1.0 (2009) required development of a soil specification for all Permittees Regional roundtable recommended Contra Costa’s mix Specification added to permit (2011)

Soil Specifications Milestones Permit Attachment L allows municipalities to accept a “brand-name” mix in lieu of site-specific testing CCCWP invited soil suppliers to submit samples and lab results for “brand name” mixes and be listed on website Some municipalities are using the bucket test or dirt bong to field-test delivered mix