Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.

Slides:



Advertisements
Similar presentations
LOGO APPLICATION OF A PARCEL. Agenda APPLICATION FOR PROJECT BUILDING OPERATIONS 1 ) Without help account application APPLICATION OF A PARCEL -- How can.
Advertisements

Traversing 1.
Chapter 9 Route Surveying – Part 3
TRAVERSING Computations.
BASICS OF TRAVERSING H.U. MINING ENGINEERING DEPARTMENT
1 SURVEYING LEARNING TO READ A COMPASS. 2 The compass is marked with the four cardinal points – north, east, south, and west. The compass is also marked.
Copyright © Cengage Learning. All rights reserved. CHAPTER 2 Right Triangle Trigonometry Right Triangle Trigonometry.
Chapter 6 Electronic Distance Measurement EDM
BASICS OF SURVEYING Ivy Tech Community College. Surveying Definition DEFINITION The art and science of making such measurements as are necessary to determine.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Introduction to Traversing using distances and directions of lines between Traversing is the method of using distances and directions of lines between.
Location and Direction
E4004 Survey Computations A
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Chapter #1: Basics of Surveying
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
ENG Surveying Ron Williams
CHAPTER 4 Coordinate Geometry and Traverse Surveying
UNIVERSAL COLLEGE OF ENGG. AND TECH.
ANGLE AND DIRECTION MEASUREMENT
Traversing Chapter 9.
Principles of Surveying
Surveying I. Lecture 10. Traversing.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
BALANCING A GOVERNMENT MEANDER LINE USING STATE PLANE COORDINATES
Triangulation and Trilateration
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
CLASSIFICATION OF SURVEYING
Slide 8- 1 Copyright © 2006 Pearson Education, Inc. Publishing as Pearson Addison-Wesley.
Coordinate Geometry and Traverse Surveying Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 8 - Week 5 2 nd Semester.
The Brunton Compass ©2010 Dr. B. C. Paul Note – The techniques shown in these slides are considered common knowledge to surveyors. Figures in the slides.
TECHNIQUES IN BASIC SURVEYING
MD : ATIKUL ISLAM JUNIOR INSTRACTOR DEPT. OF. CIVIL SUB: surveying3 SUB CODE : 6452 MOB:
Landform Drawings Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 7 Location and Direction.
TOPIC 5 TRAVERSING MS SITI KAMARIAH MD SA’AT LECTURER
COURSE 900 Day 2 - Property Descriptions Welcome to the International Right of Way Association’s R3.PPT
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Single Point Fixing - Resection
Join Calculation calculation of the
INTRODUCTION TO SURVEYING
Mapping Unit Review. Problem 1 1. A level is set up on a job site and a reading is taken off the benchmark. The reading on the rod is found to be 3’-
Surveying for non-surveyors National Reference points whose Coordinates are known are used to determine coordinate value of points ( or stations) on site.
Traverse Computation 1) Calculation of starting and closing bearings;
U.S. Coast & Geodetic Survey/NOAA Steps to Creating a Nautical Chart Historic types of surveys required – Astronomical Observations – Land survey (triangulation)
VARIOUS METHODS OF PLANE TABLE SURVEYING
Submitted By: Mon Alfred B. Cabia Submitted To: Roberto Cabrera.
Surveying 1 / Dr. Najeh Tamim
Chapter 6 TRAVERSE.
By Scott Hunt and Jonathan Funtanilla
Government Engineering College, Bhavnagar Civil Engineering Third Sem
THEODOLITE TRAVERSING BY S N Nanaware
We have started to compute the traverse station
Angles and Directions.
Angles and Directions.
Local Attraction and Traverse
Angles and Directions.
Angles and Directions.
Surveying With Construction Applications, 7th Edition
Angles and Directions.
Chapter #1: Basics of Surveying
Angles and Determination of Direction
Horizontal and vertical angles
Latitudes and Departures
Revise No. II.
Traversing.
TRAVERSING.
Engineering Surveying Introduction to Survey Engineering
CHAPTER 3 Engineering Surveying Traversing Survey and Computation By
Presentation transcript:

Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri

Chapter 7 Coordinate geometry and traverse surveying – Part 2 - Resection - Traverse Surveying Definitions - Types, Utilizations and advantages - Computations and correction errors - Examples

6. Resection As in the following figure, the horizontal position of a new point like P can be Determined by measuring the horizontal angles to three points of known coordinates like: A & B & C A P C B N M c b Ө R Ф β

Let J = β + Ф then J = 360º – ( M+ N+ R ) 1- compute & & b & c & R from the known coordinates of points: A, B,C. (R= - ) 2- compute J = 360º – ( M+ N+ R ) 3- compute H = b sin M / c sin N 4- compute Ф ( tan Ф = sin J / (H + cos J )) 5- compute Ө = 180º - N – Ф 6- compute = + Ө 7- compute AP = b sin Ф / sin N 8- compute Xp & Yp Xp = XA + AP sin Yp = YA + AP cos Procedure:

Example 7.6:

Traverse Surveying Definitions: - Traverse is one of the most commonly used methods for determining the relative positions of a number of survey points. - Traverse is a method in the field of surveying to establish control networks. It is also used in geodetic work. Traverse networks involved placing the survey stations along a line or path of travel, and then using the previously surveyed points as a base for observing the next point.

Utilizations: - property survey to establish boundaries. - Location and construction layout surveys for highways, railways and other works. - Helps the surveys for photogrammetric mapping. Types of Traverse: a- Closed Traverse b- Open Traverse

Advantages: - Less organization needed. - Few observations needed. - More accurate than other methods. - Suits different types of utilizations Open Vs Closed: - Closed traverse is useful in marking the boundaries of wood or lakes. - Open traverse is utilised in plotting a strip of land which can then be used to plan a route in road construction.

Choice of traverse stations: 1. As close as possible to the survey details. 2. Traverse shortest line should be greater than 1/3 of the longest line (preferred to be equal). 3. Traverse stations should be selected in firm ground. 4. From one station we can see the back sight and the foresight.

Underground....

Computations and correction of errors A- Determine the Azimuth of each line: 1- When ( α 1 + Ө ) > 180º α 2 = Ө - ( 180º – α 1) = Ө + α º 2- When ( α 1 + Ө ) < 180º α 2 = Ө + 180º + α 1 = Ө + α º

B- Checks and correction of errors : X last point – X first point = ∑ ∆ X all lines Y last point – Y first point = ∑ ∆ y all lines In order to meet the previous two conditions, the following corrections are performed: 1- Angle correction: a- Closed loop traverse: For a closed traverse of n sides, - sum of true internal angles = (n – 2 ) × 180 º - error = sum of measured angles – ((n – 2 ) × 180 º) - correction per angle = - error / no of internal angles

b- connecting traverse: If the azimuth of the last line in the traverse is known, then the error - εα = α c (calculated azimuth) - α n (known azimuth) - correction / angle = - εα / n the corrected azimuth - α i = α ’i ( initially computed azimuth)– i ( εα / n) 2- Position correction: IF the calculated and known coordinates of last point are: ( X c, Y c ) & ( X n, Y n )respectively, then : - Closure error in x-direction( ε x ) = X c – X n - Closure error in y-direction( ε y ) = Y c – Y n - Closure error in the position of the last points = √ ε x² + ε y ²

Compass ( Bowditch ) Rule : used for position correction as follow: Correction to departure of side ij( ∆x) = -(length of side ij / total length of traverse)( ε x ) Correction to departure of side ij( ∆y) = -(length of side ij / total length of traverse)( ε y ) Correction can be done directly to coordinates: Cxi = - (Li / D) ( ε x ) & Cyi = - (Li / D) ( ε y ) Where: Li=the cumulative traverse distance up to station i &D=total length of the traverse The corrected coordinates of station i ( x'i, y'i ) are: X'i = Xi + Cxi & Y'i = Yi + Cyi Allowable error in Traverse surveying

Azimuth and bearing North to east or west / South to east or west