Broken Hip Roof.

Slides:



Advertisements
Similar presentations
Pattern Rafters & Calculations Gable & Hipped Roof M.S.Martin Nov. 2005, Revised Feb
Advertisements

Created by Michael Martin May 04 / Reviewed & updated April 2010.
Introduction to Pitched Roof Framing
Flat Roof & Introduction to Gable Roof
Gable Roofs and Components
Ceilings & Basic Roofing
Flat Roofs & Introduction to Gable Roofs
HIP ROOFS Created BY Michael Martin July 2004 / revised may 2007 / reviewed & updated March 2010.
The Right Angled Triangles in a Hipped Roof M. S. Martin May 2007 reviewed April 2010.
HIP ROOFS Created BY Michael Martin July 2004 / revised may 2007.
Gable Roof BCGCA3007B.
Gable Roof BCGCA3007B.
Roof Bevels Using Steel Square
Framing Agriculture Structures
Direct Method Presentation
Unit 49 Intersecting Roofs
Basic Roof Types and Roof Theory
Unequally Pitched Roofs
Hip & Valley Roofs Note: Main pictures and text (although some re-written) is from the text book “Practical Australian Carpentry” Created by M. S. Martin.
RAFTER AND ROOF COMPONENT PARTS
ROOF.
Roof Framing Unit 33.
BCT 122 Roof Framing 1 Roof Framing Procedure Sequence.
Created by Michael Martin 13/9/04 – Reviewed June 2010.
Gable Roof BCGCA3007B. Gable Roof Flush with no eaves Flush with raked eaves Boxed.
CARP12 text book / or workbook P 95 With additional notes for explanation M. S. Martin July Reviewed June 2010.
Oblique Hip Roof Pictures & Text from previous Trade notes – course 5158 M. S. Martin – June 2005 Revised – February 2008 Reviewed March 2011.
HIP RAFTER THEORY AND SAMPLE CALCULATIONS
Gable, Gambrel, and Shed Roofs
Roof Bevels for Oblique Hip and Skew Gable
HIP JACK THEORY AND LAYOUT
Presentation 26: HIP RAFTER LAYOUT.
Roof Bevel Development
1 Presentation 19: RAFTER AND ROOF COMPONENT PARTS.
Lesson 9 Framing Agriculture Structures Next Generation Science/Common Core Standards Addressed!  CCSS.ELA Literacy Cite specific textual evidence to.
Creeper calculations, Rafter shortening and Pattern Rafter
Pattern Rafters & Calculations
Introduction to Hip & Valley Roofs Ref: “Carp 12 Hip & Valley Roofing” Included as part of 2nd year text folders M. S. Martin May 2007 Revised July 2010.
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
Copyright 2006 The National Association of Certified Home Inspectors
Note: Main pictures and text (although some re-written) is from the text book “Practical Australian Carpentry” Created by M. S. Martin Oct / Reviewed.
Construct Pitched Roofs (Simple)
The Hipped Roof – Part 2 Pattern Rafters M. Martin Original 2005 Reviewed 2006.
Roof Types, Components & Terminology
Octagonal Roof.
Estimating Hip Roofs.
Flat Roofs & Introduction to Gable Roofs Ref: M. S. Martin / March 2004 / Reviewed & Combined March 2007.
Gable Roof BCGCA3007B.
Unit A3-9 Framing Agriculture Structures Problem Area 3 Construction Systems.
Roof Types, Components & Terminology
Octagonal Roof.
Proportional Triangles Hip bevel development. On a sheet of paper or plywood, draw a horizontal line 250 mm long Draw a perpendicular line 100mm from.
Oblique Hip Roof Pictures & Text from previous Trade notes – course 5158 M. S. Martin – June 2005 Revised – February 2008.
Hip & Valley. Hip Valley Roof This is to be used in conjunction with the following plan which can be found here.
After the roof design is selected, the next decision is the type of roof construction-- trusses or stick built. Trusses. Less labor to install trusses.
Conventional Roof Framing Class Exercise Residential Studies Certificate IV 2182D.
National Center for Construction Education and Research Carpentry, Level 1 Copyright © by the NCCER, Published by Pearson Education, Inc. FIGURE 6- 1 Types.
Designing and constructing a traditional half span hipped end roof  Roof to a domestic extension.
Estimating Hip Roofs.
Octagonal Roof. Notes to this Lesson This demonstration develops from knowledge gained from the development of Gable & Hip Roofs This PowerPoint does.
Construct Pitched Roofs (Simple)
Pitched Roof By PATEL ANKITKUMAR H.
ROOFING BCGCA3007B. Types of Roofs Problem No1 Calculate Underside of Beams Birdsmouth 30mm Rafter 140 x 45.
ROOFING BCGCA3007B.
PATTERN RAFTER.
Framing Agriculture Structures
Gable Roof BCGCA3007B.
Broken Hip Roof.
Framing Agriculture Structures
VALLEY JACK THEORY AND LAYOUT
Presentation transcript:

Broken Hip Roof

Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Hip & Valley Roof Roof Pitch = 25⁰ What Members define Creeper side cut

Lay out of Hip & Valley Roof Roof Pitch = 25⁰ What Members define Valley Creeper side cut What Members define Creeper side cut Half Span Common Rafter

Lay out of Hip & Valley Roof Roof Pitch = 25⁰ What Members define Valley Creeper side cut Half Span Common Rafter What Members define Creeper side cut Half Span Common Rafter

Lay out of Hip & V Roof Roof Pitch = 25⁰ What Members define Creeper side cut Half Span Common Rafter

Lay out of Broken Hip Roof Roof Pitch = 25⁰ No new bevels need to be developed

Lay out of Broken Hip Roof Roof Pitch = 25⁰ All Bevels and edge cuts are the same as a hip roof Broken Hip As Span is not the same the rise will not be the same

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Hip Rafter Minor Span Crown End Minor Span Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Common Rafter Major Span Common Rafter Minor Span Hip Rafter Major Span Valley Rafter Minor Span Centring Rafter Minor Span Crown End Major Span Crippled Centring Rafter Broken Hip Centring Rafter Major Span Gathering Point

Lay out of Broken Hip Roof Roof Pitch = 25⁰ With the more complex roof a roof is. It is important to plan & determine as much of the roof offsite that you can Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = Plan Length x Rafter Length / m = (1000 – 17.5) x 1.103 = 982.5 x 1.103 = 1084 1.000 √2

Common Rafter – Major Span Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = Plan Length x Rafter Length / m = (675 – 17.5) x 1.103 = 657.5 x 1.103 = 725 1.000 √2

Common Rafter – Minor Span Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut As Major & Minor Span are the same pitch the plumb cuts must be the same

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = (½ Span – ½ Ridge) x Rise / m = (1000 – 17.5) x 0.466 = 982.5 x 0.466 = 458 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 = (½ Span Major – ½ Ridge) x Rise / m = (1000 – 17.5) x 0.466 = 982.5 x 0.466 = 458 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = = (½ Span Minor – ½ Ridge) x Rise / m = (675 – 17.5) x 0.466 = 657.5 x 0.466 = 306 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 We recall that all hips & valleys bisect corners. In this building it means that they are at 45⁰.

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = Plan Length Crown End Rafter x Hip length/m = (1000 – 17.5) x 1.489 = 982.5 x 1.489 = 1.463 1.000 √2

Hip Rafter – Major Span Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = = Plan Length Crown End Rafter x Hip length/m = (0.675 – 17.5) x 1.489 = 657.5 x 1.489 = 979 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm 1.489 1.103 0.466 Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = = Plan Length Crown End Rafter x Hip length/m = (0.675 – 17.5) x 1.489 = 657.5 x 1.489 = 979 1.000 √2 Valley is the same as the hip

Hip Rafter – Minor Span Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut As Major & Minor Span are the same pitch the plumb cuts must be the same

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm Determine Centreline Length Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major Plan Length = ½ Span – Spacing + Correction = 1000 – 300 + (1.414 x -17.5 + 17.5) = 693 x Rafter Length / m = 693 x 1.103 = 764 1.489 1.103 0.466 1.000 √2 Note these measurements are directional as it goes back towards the Top Plate it must be a negative

Creepers– Major Span Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut Creepers are the same pitch as the Common Rafters. They must have the same Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm Determine Centreline Length Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 Plan Length = ½ Span – Spacing + Correction = 675 – 300 + (1.414 x -17.5 + 17.5) = 368 x Rafter Length / m = 368 x 1.103 = 406 1.489 1.103 0.466 1.000 √2

Creepers– Minor Span Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut Creepers are the same pitch as the Common Rafters. They must have the same Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 1st Valley Creeper = 698 Plan Length = ½ Span + Valley Correction – ½ Ridge = 675 - (1.414 x -17.5 + 17.5) – 17.5 = 633 x Rafter Length / m = 633 x 1.103 = 698 1.489 1.103 0.466 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Edge Bevel for Valley Creepers Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 What Triangle forms the Bevel

Crippled or Valley Creepers Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut Creepers are the same pitch as the Common Rafters. They must have the same Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter We recall that all hips & valleys bisect corners. In this building it means that they are at 45⁰.

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter Hips at 45° 1000-675 = 325 ½ Span Major – ½ Span Minor

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter We recall that all hips & valleys bisect corners. In this building it means that they are at 45⁰. Therefore where the Broken Hip intersects the Ridge Minor Span must be 325mm from the Centreline of the Ridge Major Span

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter Both Hips at 45° 1000-675 = 325 ½ Span Major – ½ Span Minor

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter = (½ Major Span – ½ Minor Span) x 2 Or = Major Span – Minor Span This must be 2x This

Lay out of Broken Hip Roof Roof Pitch = 25⁰ To develop other Roofing Members we need to determine the plan length first Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Determine Crippled Centring Rafter As the valley is at 45⁰ the intersection with the valley must be a further 325mm

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 1st Valley Creeper = 698 Crippled Centring Rafter = 689 Plan Length = Major Span – Minor Span + Valley Correction – ½ Ridge = 2000 – 1350 + (1.414 x -17.5 + 17.5) – 17.5 = 625 x Rafter Length / m = 625 x 1.103 = 689 1.489 1.103 0.466 1.000 √2

Crippled Centring Rafter Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut Crippled Centring Rafter is the same pitch as the Common Rafters. It must have the same Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Edge Bevel for Crippled Centring Rafter Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 What Triangle forms the Bevel

Simple Bevel Development From Previous Plumb Bevel Rafter Level Bevel Rafter Edge Bevel Creeper Edge Bevel Purlin Plumb Bevel Hip Level Bevel Hip Edge Bevel Hip Face Bevel Purlin

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Every Valley Creeper must have an opposing creeper Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Every Valley Creeper must have an opposing creeper Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Every Valley Creeper must have an opposing creeper Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Every Valley Creeper must have an opposing creeper Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 From previous calculations we determined the following

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Every Valley Creeper must have an opposing creeper Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Centreline length is the same as distance from the gathering point

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Every Valley Creeper must have an opposing creeper Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 To determine true length Long Pt Centreline length 325 +/- Long Point Correction -7.5 (-17.5 x 1.414 + 17.5) Deduct ½ Ridge 17.5 Plan Length = 325 + -7.5 - 17.5

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 1st Valley Creeper = 698 Crippled Centring Rafter = 689 Crippled Creeper Matching = 331 Plan Length = ½ Span Major – ½ Span Minor + Valley Correction – ½ Ridge = 1000 – 675 + (1.414 x -17.5 + 17.5) – 17.5 = 300 x Rafter Length / m = 300 x 1.103 = 331 1.489 1.103 0.466 1.000 √2

Crippled Matching Rafter Plumb Cut 1.489 1.103 0.466 1.000 √2 Plumb Cut Crippled Matching Rafter is the same pitch as the Common Rafters. It must have the same Plumb Cut

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 1st Valley Creeper = 698 Crippled Centring Rafter = 689 Crippled Creeper Matching = 331 Creeper Shortening = 331 Rafter Spacing x Rafter Length / m = 300 x 1.103 = 331 1.489 1.103 0.466 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm As both spans are the same pitch they are SIMILAR so Creeper Shortening is the same for both spans Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 1st Valley Creeper = 698 Crippled Centring Rafter = 689 Crippled Creeper Matching = 331 Creeper Shortening = 331

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Lay out of Broken Hip Roof Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Rafter Spacing 300mm So the roofing members we have previously looked at are determined the same way Determine Required Lengths Common Rafter Major Span = 1084 Common Rafter Minor Span = 725 Rise Main Roof = 458 Rise Minor Roof = 306 Hip Length Major Span = 1.463 Hip Length Minor Span = 979 1st Creeper Major = 764 1st Creeper Minor = 406 1st Valley Creeper = 698 Crippled Centring Rafter = 689 Crippled Creeper Matching = 331 Creeper Shortening = 331

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Edge Bevel for Crippled Centring Rafter Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Edge Bevel for Crippled Centring Rafter is the CREEPER EDGE BEVEL The same is for Valley Creepers Crippled Creepers

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 Edge Bevel for Crippled Centring Rafter is the CREEPER EDGE BEVEL The same is for Valley Creepers Crippled Creepers It follows that all the The purlin bevels are The same as the hip end

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Determine Centreline Length Broken Hip Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Broken Hip Run 325 x 1.414 = 460 Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 1.489 1.103 0.466 1.000 √2 Determine Plan Centreline Length = 325

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Broken Hip Run 325 x 1.414 = 460 Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 1.489 1.103 0.466 1.000 √2 Determine Plan Centreline Length = 325 Centreline True Length = Plan Length x Hip Rafter / m = 325 x 1.489 = 484

Broken Hip Edge Correction At Base

Broken Hip Edge Correction At Base

Valley at Base of Broken Hip

Valley at Base of Broken Hip

Broken Hip Edge Correction at Top

Broken Hip Edge Correction at Top

Lay out of Broken Hip Roof Roof Pitch = 25⁰ Plumb cut is the same as the hip Edge Bevels are the same as the hip Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35 1.489 1.103 0.466 1.000 √2

Lay out of Broken Hip Roof Roof Pitch = 25⁰ With the more complex roof a roof is. It is important to plan & determine as much of the roof offsite that you can Rafter 90 x 35 @ 450 c to c Hip Rafters 140 x 35 Ridge 140 x 35