Core Performance Measures FY 2015

Slides:



Advertisements
Similar presentations
Benchmarking ANL Procurement (where do we stack up??)
Advertisements

Page Federal Contracting AbilityOne November 8, 2012 Midwest SBLO Meeting.
STRATEGIC PLAN Community Unit School District 300 7/29/
Presented by: Kathryn Hodges, NH
Presented to: Procurement Achievement Reporting System Advisory Council Location: Washington, D.C. Presented by: Fred Dendy, Director, FAA Small Business.
DCAA – Fort Walton Beach Branch Office
Quality Management System SEETHARAM- Quality Assurance
AUDIT COMMITTEE FORUM TM ACF Roundtable IT Governance – what does it mean to you as an audit committee member July 2010 The AUDIT COMMITTEE FORUM TM is.
Planning Process Language of Planning Planning Process
Performance Appraisal System Update
Strategic Purchasing at Penn Impacting the Institution's Bottom Line October 21, 2005 Presented by: Ralph Maier Director of Purchasing Services.
UC San Diego Financial Perspective How do we look to resource providers? Customer Perspective How do customers see us? Internal Process Perspective Are.
Pittsburgh, PA Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department of Defense.
College Strategic Plan by Strategic Planning and Quality Assurance Committee.
By Saurabh Sardesai October 2014.
THE BALANCED SCORECARD
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
DEPARTMENT OF ENERGY FEDERAL PROCUREMENT SYSTEM BALANCED SCORECARD PERFORMANCE MANAGEMENT PROGRAM Core Performance Measures FY 2012 Issued: Sep 14, 2011;
1 Department of Education Race to the Top Assessment Program Procurement Strategy Discussion Dr. Allan V. Burman President Jefferson Solutions
Defn Jack Ninemeir defines purchasing as "the series of activities designed to obtain products of the right quality and quantity at the right price and.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
Core Performance Measures FY 2005
ISO 9001 Auditing Practices Group
C H A P T E R 2 Stakeholder Relationships, Social Responsibility, and Corporate Governance.
Balanced Scorecard 101 A Brief Overview of the BSC Methodology
A Security Training Program through Transformational Leadership and Practical Approaches Tanetta N. Isler Federal Information Systems Security Educators’
Sub-theme Three The Self-Assessment Process and Embedding QA into the Life of an Institution by Terry Miosi, Ph.D. UAE Qualification Framework Project.
ISMMMO, Antalya April Internal Audit, Best Practices Özlem Aykaç, CIA,CCSA CAE Coca-Cola İçecek.
DAS: State Controller's Division1January 2010 Department of Administrative Services State Controller’s Division Updated January, 2010.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Federal Procurement Data System (FPDS) Data Accuracy 1.
Presentation on the Corporate Planning Department
The Changing Business Environment: A Manager’s Perspective 18.
December 14, 2011/Office of the NIH CIO Operational Analysis – What Does It Mean To The Project Manager? NIH Project Management Community of Excellence.
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
1 Monitoring and Evaluation System Mr M Thibela by Director: Corporate Planning Department: Water Affairs (DWA) 18 August 2009.
Chapter 12 Evaluating and improving human resource management.
2.2 Acquisition Methodology. “Acquisition methodology” – the processes employed and the means used to solicit, request, or invite offers that will normally.
The Balanced Score Card
Building Balanced Scorecards Thompson Leadership Team May 20, 2010 Annette Overton, Quality Performance Department.
平衡记分卡( Balanced Scorecard )概要. 学习与成长 - 雇员满意度 - 团队精神 - 信息利用程度 财务 - 成本最优 使命 愿景 战略 客户 - 客户满意度 内部运营流程 - 有效的内部控制 - 有效的供应商管理 - 综合利用多种获得资源的途径 - 流程不断改进 平衡记分卡的目标与衡量方法.
C H A P T E R 10 Continuous Improvement in Management Accounting Continuous Improvement in Management Accounting.
The Balanced Scorecard
Monitoring Region 3 Discretionary Roundtable May 20 – 23, 2008 Mary Evans And Conyers Garrett EMPLOYMENT AND TRAINING ADMINISTRATION UNITED STATES DEPARTMENT.
Federal Acquisition Service U.S. General Services Administration GSA Assisted Acquisition Services Peter Han General Services Administration March 16,
Information System Project Management Lecture Five
Starter: What is a mission statement?
Supply Chain Management Purchasing/Inventory/Materials.
Contracting with CMS and other Federal Agencies CMS Industry Day October 30, 2015 Anita Allen, Small Business Specialist and Claude Cable, SBA Procurement.
FAPPO Meeting November 5, 2004 Jacksonville, FL. 2 DMS Mission FY To become a customer focused agency providing effective and efficient services.
Internal Auditing Effectiveness
Administrative Cost Savings through Invoice Verification.
Strategic alignment.
Table 1: Comparison of Management and Financial Accounting.
Scottish Local Authority Chief Internal Auditors Group Conference - June 2013.
1 Balanced Scorecard Philosophy, Basics, Fundamentals, and Functions.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
Most Effective Use of Contracting Approaches to Maximize Efficiency and Cost Effectiveness Use of Electronic Commerce: Data Source: Electronic Small Purchase.
Human Resource Management 1 Performance Management Process.
Processes and Procedures for Contracting at UO
Balanced Scorecard “Puyallup Public Library, as an innovative information center, provides excellent service to all in their pursuit of information, knowledge,
Processes and Procedures for Contracting at UO
All IT Staff Meeting September 18, 2013
The Administration’s Small Business Agenda
City of Norfolk Office of the Purchasing Agent
Purchasing and Supply Chain Management
ISO 9001 Auditing Practices Group
ISO 9001 Auditing Practices Group
SWAM Procurement Training
ISO 9001 Auditing Practices Group
SWAM Procurement Training
Presentation transcript:

Core Performance Measures FY 2015 Department of Energy M&O CONTRACTOR PURCHASING SYSTEM BALANCED SCORECARD PERFORMANCE MANAGEMENT PROGRAM Core Performance Measures FY 2015 REVISED: 04/08/2015

PERSPECTIVES AND OBJECTIVES BALANCED SCORECARD PERSPECTIVES AND OBJECTIVES 2 CUSTOMER - Customer Satisfaction INTERNAL BUSINESS PROCESSES - Effective Internal Controls Effective Supplier Management Use of Effective Competition - Effective Utilization of Alternate Procurement Approaches - Acquisition Process - Good Corporate Citizenship through Purchasing FINANCIAL - Optimum Cost Efficiency of Purchasing Operations - Financial Contributions of Procurement via Cost Savings MISSION VISION STRATEGY LEARNING AND GROWTH - Employee Satisfaction - Employee Alignment

VISION STRATEGY MISSION 3 MISSION To provide acquisition and assistance services to support accomplishment of the Department’s programmatic goals and objectives. VISION To deliver on a timely basis the best value product or service to our customers while maintaining the public’s trust and fulfilling public policy objectives. STRATEGY To develop and maintain an organizational culture, management systems, and line processes in the acquisition system that ensure a focus on results while emphasizing integrity, fairness, competition, openness, and efficiency.

4 CUSTOMER PERSPECTIVE CUSTOMER - Customer Satisfaction

CUSTOMER PERSPECTIVE OBJECTIVE MEASURE NATIONAL TARGET 5 Customer Satisfaction Data Source: Annual Customer Climate Survey or Real-Time Transactional Survey Data Generation: Accomplished by using appropriate survey instrument. Data Verification: Purchasing Directors are responsible for accuracy of survey data generation, and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Customer Satisfaction Rating % of customer satisfaction with the timeliness, quality, and level of communication provided by the procurement office. The Customer Satisfaction Rating must address the following elements: Timeliness: Extent of customer satisfaction with timeliness of procurement processing; planning activities; and on-going communications Quality: Extent of customer satisfaction with the quality of procurement services Communications: Extent to which procurement communicates accurate information which impacts the work of the customer’s organization 92%

CUSTOMER PERSPECTIVE OBJECTIVE MEASURE NATIONAL TARGET 6 Customer Satisfaction (Cont .) The Customer Satisfaction Rating is to be determined by use of one of the following two alternatives (note: use of one or the other is required): 1. Annual Customer Climate Survey 2. Real-time Transactional Survey

INTERNAL BUSINESS PROCESSES PERSPECTIVE 7 INTERNAL BUSINESS PROCESSES PERSPECTIVE INTERNAL BUSINESS PROCESSES -Effective Internal Controls -Effective Supplier Management -Use of Effective Competition -Effective Utilization of Alternate Procurement Approaches -Acquisition Process -Good Corporate Citizenship through Purchasing

INTERNAL BUSINESS PROCESSES PERSPECTIVE 8 OBJECTIVE MEASURE NATIONAL TARGET Effective Internal Controls Data Source: Purchasing files, compliance reviews, review boards and Local Purchasing Information Systems (LPIS) Data Generation: Based upon results of compliance reviews, transactional review of purchasing files, review boards, LPIS, etc. Data Verification: Purchasing Directors are responsible for the retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Assessment of the degree to which the purchasing system is in compliance with stakeholder requirements including applicable laws, regulations, terms and conditions of contracts, ethics, good business practices, etc. The assessment result is to be expressed in percentage form. (Note: In assessing performance under this measure, contractors are to rely primarily on the results of the most recent formal compliance review, information gained from the periodic review of purchasing files, formal review boards (IG, GAO, etc.), and other appropriate sources. The cognizant DOE Contracting Officer is required to review and approve the contractor’s self-assessment methodology and score under this measure as part of the CO’s review of the contractor’s BSC self-assessment activities.) (Appropriate targets will be negotiated between the Cognizant DOE Contracting Officer and the contractor purchasing organization.)

INTERNAL BUSINESS PROCESSES PERSPECTIVE 9 OBJECTIVE MEASURE NATIONAL TARGET Effective Supplier Management Data Source: LPIS Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: % Delivery on-time (includes JIT, excludes Purchase Cards) 84%

INTERNAL BUSINESS PROCESSES PERSPECTIVE 10 OBJECTIVE MEASURE NATIONAL TARGET Use of Effective Competition Data Source: LPIS Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: % of total dollars obligated on actions over $150,000 that were awarded using effective competition. (Note: This measure applies to any dollars obligated during the fiscal year on a subcontract or purchase order that was awarded using effective competition and whose current dollar value exceeds $150,000. Effective competition means, given the size and complexity of the requirement, a sufficient number of potential sources are solicited with the expectation of receiving competitive proposals to support the reasonableness of price or cost. The placement of delivery orders, task orders, or releases against indefinite delivery, indefinite quantity, requirements-type or other similar contracts are considered competitive if the underlying contract was awarded using effective competition.) (Appropriate targets will be negotiated between the Cognizant DOE Contracting Officer and the contractor purchasing organization.)

INTERNAL BUSINESS PROCESSES PERSPECTIVE 11 OBJECTIVE MEASURE NATIONAL TARGET Effective Utilization of Alternate Procurement Approaches Data Source: LPIS Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Rapid Purchasing Techniques: 1. % of transactions placed by users (number of transactions placed by users divided by the sum of total transactions - including JIT, Purchase Card, etc.) 2. % of transactions placed through electronic commerce (number of transactions placed through e-commerce divided by the sum of total transactions. E-commerce means that all communication with the vendor(s) throughout the pre-award and award process is done by electronic means (i.e., paperless). E-commerce tools include the internet, use of CDs, e-catalogs, email, etc. Use of fax machines is not included unless it is a paperless fax.) (For the two measures, appropriate targets will be negotiated between the Cognizant DOE Contracting Officer and the contractor purchasing organization)

INTERNAL BUSINESS PROCESSES PERSPECTIVE 12 OBJECTIVE MEASURE NATIONAL TARGET Acquisition Process Data Source: LPIS Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Good Corporate Citizenship through Purchasing Core: Average cycle time (exception: Purchase Card) for each of the following dollar ranges: Average cycle time for <= $150,000 Average cycle time for > $150,000 Average cycle time for all actions % of economic and social diversity and local participation program goals achieved, including SB, SDB, Women Owned SB Goals, HubZone and Disabled Veterans. 6 to 9 days for <= $150,000 25 to 30 days for > $150,000 8 to 11 days for all actions 100% of established goals

LEARNING AND GROWTH PERSPECTIVE 13 LEARNING AND GROWTH PERSPECTIVE LEARNING AND GROWTH - Employee Satisfaction - Employee Alignment

LEARNING AND GROWTH PERSPECTIVE 14 OBJECTIVE MEASURE NATIONAL TARGET Employee Satisfaction Data Source: Employee Climate Survey, focus groups, and other methods as appropriate Data Generation: Accomplished by using appropriate survey instrument and other information sources. Data Verification: Purchasing Directors are responsible for accuracy of survey data generation, and other information sources, and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Employee Satisfaction Rating: % of employees satisfied with the work environment, and the organization’s professionalism, culture and values. This rating may include data from employee survey, focus groups, or other methods. (Appropriate targets will be negotiated between the Cognizant DOE Contracting Officer and the contractor purchasing organization.)

LEARNING AND GROWTH PERSPECTIVE 15 OBJECTIVE MEASURE NATIONAL TARGET Employee Alignment Data Source: Employee Performance Appraisals and LPIS as appropriate Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Employee Alignment: % of employees whose performance evaluation plans are aligned with organizational goals and objectives. 98% aligned

FINANCIAL PERSPECTIVE 16 FINANCIAL PERSPECTIVE FINANCIAL - Optimum Cost Efficiency of Purchasing Operations Financial Contributions of Procurement via Cost Savings

FINANCIAL PERSPECTIVE 17 FINANCIAL PERSPECTIVE OBJECTIVE MEASURE NATIONAL TARGET Optimum Cost Efficiency of Purchasing Operations Data Source: LPIS Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Cost to Spend Ratio Purchasing Operation’s operating costs (labor plus overhead) divided by purchasing obligations. (Appropriate targets will be negotiated between the Cognizant DOE Contracting Officer and the contractor purchasing organization)

FINANCIAL PERSPECTIVE 18 FINANCIAL PERSPECTIVE OBJECTIVE MEASURE NATIONAL TARGET Financial Contributions of Procurement via Cost Savings Data Source: LPIS Data Generation: Data is generated from the LPIS. Data Verification: Purchasing Directors are responsible for the accurate reporting of results and for retention of records in accordance with records management requirements. Records will be made available for compliance and/or DOE reviews. Core: Procurement Cost Improvement: 4% strategic sourcing cost savings against expected actionable procurement spend *Acceptable measures of procurement strategic sourcing cost improvements include, but are not limited to those identified in Policy Flash 2014-14 and Policy Flash 2012-67.   4% The national target will be the achievement of that percent goal as outlined in the DOE Strategic Plan, 2104-2018, Strategic Objective 10 for strategic sourcing savings.