The Challenge of Implementing an ERP System in a Small and Medium Enterprise Andrew C. Stephens 9/19/2012.

Slides:



Advertisements
Similar presentations
SafetyFirsts Customer-Only Web Site Resources A Green Light to Safety Research, Articles, Specialty Reports & Training Presentations.
Advertisements

Company Background: Nestlé SA is a giant food and pharmaceuticals company that operates virtually all over the world. Headquartered in Vevey, Switzerland,
J.D. Edwards By: Kevin Keefe Estella Veach Doug Cobb.
Entrepreneurs discover an entrepreneurial opportunity when they find a compelling solution to an unsolved problem or unsatisfied need. The first step.
The System Development Life Cycle
ERP Selection. Choosing ERP Although major vendors have been selling ERP software to billion dollar companies for a while, the selection of suitable package.
1 Meeting the Reporting Challenges at International Paper.
Chapter 1 Thinking Critically 2,4,5,9,10 Assoc. for Information Technology 1,2,3.
Achieving Operational Excellence Enterprise Applications Business Information Systems Laudon & Laudon Ch.8 (P.266)
Achieving Operational Excellence Enterprise Applications Business Information Systems Laudon & Laudon Ch.8 (P.266)
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 8 SUPPLY CHAIN MANAGEMENT.
© Prentice Hall, 2005: Enterprise Resource Planning, 1 st Edition by Mary Sumner 3-1 Enterprise Resource Planning, 1 st Edition by Mary Sumner Chapter.
 The Fundamental Reasons Behind The Failure Of ERP System SYSM 6309 Advanced Requirements Engineering By Shilpa Siddavvanahally.
ACCOUNTING INFORMATION SYSTEMS
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
Chapter 9: Software Tools and Dashboards. 2 V. Kumar and W. Reinartz – Customer Relationship Management Overview Topics discussed  CRM Implementation.
SOFTWARE AND VENDOR SELECTION
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Market Overview Bill Hill Director of Marketing Sage - Enterprise Solutions Division.
Laudon & Laudon: Canadian Edition
Mgt 20600: IT Management & Applications Introduction and Overview Tuesday August 30, 2005.
SOFTWARE AND VENDOR SELECTION
Mgt 20600: IT Management & Applications Introduction and Overview Thursday January 19, 2006.
11.1 © 2007 by Prentice Hall 11 Chapter Building Information Systems.
Supply Chain Management Common Learning Block II Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the.
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Information Systems Chapter 10.
R McFadyen Chapter 10 Selecting the Best Alternative Design Strategy.
Chapter 14 Information System Development
Enterprise Resource Planning ERP Systems
Chapter 10 Accounting Systems for Manufacturing Businesses.
John T. Vaughan, CEO, MarketDataInsite December 3, 2004 An Objective Look at IT Solutions for Hedge Fund Operations.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Chapter 12 Integrating the Organization from End to End – Enterprise Resource Planning.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #2.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
1 Supply Chain World Conference April Chicago Bryan Harris Origin Technology Develop and Engage Your Organization.
7-1 Computerized Accounting Systems Electronic Presentation by Douglas Cloud Pepperdine University Chapter F7.
Group Assignment 1  About 2-3 students per group.  Your group assignment is to develop a change management plan for an organization implementing any.
10-1 © Prentice Hall, 2004 Chapter 10: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh.
8-1 © Prentice Hall, 2007 Topic 8: Selecting the Best Alternative Design Strategy Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra,
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #15.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
ERP Implementation Lifecycle
MOSTAFA MAZEN MOIS 549 The ERP Selection Process Survival Guide Article from:
Phoenix Technology Solutions Products At the highest level, the products offered by Phoenix Technology Solutions are: IT Project/Programme Management.
David Van der Grient Research Assignment BUS 2302.
University of Wyoming Financial Reporting Initiative Update April 2016.
A Study and Analysis of SAP MM(Material Management)Module Name: Thangamani.MP Reg no: Guide name: S.Chandrasekaran.
Source: Article reprinted from 2014 Cloud Survey Report, Copyright: KPMG LLP © 2015, a Delaware limited liability partnership and the U.S. member.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
Customer Relationship Management. Presentation By: Tarun Rattan Jyoti Sodani Akash Gupta Saloni.
Phases of ERP Implementation Lifecycle By ControlERP
Overview of Enterprise Integration Efforts at Penn State by Ravi Ravindran Chair, EI Steering Committee Professor of Industrial Engineering.
The System Development Life Cycle
ERP vendor perspective
Enterprise Resource Planning
ERP(Enterprise Resource Planning)
Make-to-Stock Scenario Overview
Management Information Systems
of our Partners and Customers
Make-to-Stock Scenario Overview
Building Information Systems
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
The System Development Life Cycle
ACCOUNTING INFORMATION SYSTEMS
SOFTWARE AND VENDOR SELECTION
Chapter 22, Part
Enterprise Resource Planning, 1st Edition by Mary Sumner
Presentation transcript:

The Challenge of Implementing an ERP System in a Small and Medium Enterprise Andrew C. Stephens 9/19/2012

Overview  Researchers from Butler University studied the first phase ERP installation at Custom Engineering Solutions (CES)  CES provides custom electronic controls and services to various industries focusing on large motors.  They are divided into two sections with two different business models

Overview  The drive to implement an ERP was pushed by the CFO who stated the following objectives:  Support niche market strategy  Provide better cost data  Improve the accuracy of financial reporting  Other – including streamlining the value chain to reduce carrying inventory, tracking of sales, improved sales forecasting, and implementing a web store. (Hongijang, et al., 2011)

RFP Process  Epicor was slated to provide the ERP software for $250,000  Installation, conversion, and data cleaning being performed by CES  The IT manager had no input while Middle Managers were allowed little input  The final selection was made by the CFO and COO

Implementation  The younger and smaller division was selected to implement the ERP system  They were given a deadline of six months (July 1,2008)  Including  Installation  Data scrubbing  Testing  Training  However, they were not able begin the project until early April

Implementation  The CFO refused to push back the deadline stating… initial implementation date was fair and that individuals such as the IT manager were simply making excuses for not starting and completing their work on time (Hongijang, et al., 2011.)

PM Problems  The CFO stated that he assigned the IT Manager as the PM, however the IT Manager had no decision making capacity.  Epicore provided a 126 step project process, however CFO chose not to follow it closely. They decided to manage the process via a short task list with tasks.  Middle and line mangers were also given little to no decision authority. The CFO resisted requests from division managers to release employees from existing work to work on the project.  The project budget was set at $500k by the CFO. The justification for the budget, since the ERP software had cost $250k…the implementation for both divisions would not exceed twice the purchase price. The CFO was cautioned by Epicor, other Epicor ERP firms, and by other ERP consultants that the cost could greatly exceed the budget. “He dismissed their cost projections as greatly exaggerated.”

Other Problems  Training was provided using only vendor supplied test data  Users were not aware of reporting limits  They assumed that reports would be available simular to the old system; they were caught off-guard when they had to use reporting tools such as Crystal Reports to build new reports.

IT Manager(s)  The IT Manager who started the project was dismissed after the first implementation cost was $90,000, $10k less than budget.  The CFO’s explanation was “I expected the IT Manager to show leadership to implement the ERP system at [the first division] for significantly less than the $100,000 budgeted for the first division.”  The IT Manager was unaware of the budget

IT Manager(s)  The second IT Manager was brought in to finish the second division  He had a Masters Degree in CIS  Extensive experience in IT  He was dismissed after he fell out of favor with the CFO.  When interviewed by the case authors he stated that “management does not appear to believe it is important to do the upfront planning work.” (Hongijang, et al., 2011.)

Audience  Presented in the Journal of Information Systems Education  Academic  Peer reviewed  IS education focus  Similar to a HBR article in format

Author Credentials  All three authors are associated with Butler  One runs a consulting firm  All three have Ph.Ds

Review  They did review some of the differences in the ERP product but fall short of comparing business requirement differences.  The abstract introduces the idea that the case was an investigation at CES’ request, this was never discussed in the body of the document

Review  Authors appear to be free from bias in the circumstance.  However, it is unknown if the third associate (the consultant) had or has since attempted to transact business with CES.

Conclusion  The paper wanted to discuss ERP in small and mid-size business – they did this well  The paper also begins to shed light on the importance of early ERP implementation.  It raises questions as to the availability of scalable ERP systems for small businesses in an effort to scale up the software as the company grows.