(C) Ghanendra Fago (M. Phil, MBA) 1 Standard Costing, Variance Analysis and Management Cycle Use standard costs to prepare budgets and establish goals.

Slides:



Advertisements
Similar presentations
Chapter 11 Standard Costs and Variance Analysis
Advertisements

CHAPTER 10 The Need for Standards Standards Are common in business They are often imposed by government agencies (and called regulations) Standard costs.
Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 10 Standard Costing, Operational Performance Measures,
Principles of Managerial Accounting Chapter 10. Standard Costs Set to encourage efficient operations – management by exception. Quantity Standards A benchmark.
Standard Costing and Variances
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA McGraw-Hill/Irwin.
Cost Analysis for Control
Standard Costs and the Balanced Scorecard
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Standard Costs 11/16/04 Chapter 10. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for.
Standard Costs Pertemuan 7. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Standard Costs Standard Costs are Predetermined. Used for planning.
Chapter 10 Standard Costing: A Managerial Control Tool
VARIANCE ANALYSIS 1 LECTURE 8.
Standard Costs and Balanced Scorecard
The Master Budget and Flexible Budgeting
Financial and Managerial Accounting
Standard Costing & Variance Analysis!
Chapter 23 Flexible Budgets and Standard Cost Systems
Material variances 1) Material cost variance 2) Material price variance 3) Material usage or quantity variance 4) Material mix variance 5) Material mix.
Chapter 25-1 Chapter 25 Standard Costs and Balanced Scorecard Accounting Principles, Ninth Edition.
Standard Costs and Operating Performance Measures
24-1. CHAPTER 24 C ONTROL THROUGH S TANDARD C OSTS.
Performance Evaluation Through Standard Costs
11-1 Islamic University of Gaza Managerial Accounting Standard Costs and Balanced Scorecard Chapter 6 Dr. Hisham Madi.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 24-1 STANDARD COST SYSTEMS Chapter 24.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 8 Standard Costs.
Standard Costing and Variance Analysis
Needles Powers Crosson Principles of Accounting 12e Standard Costing and Variance Analysis 24 C H A P T E R © human/iStockphoto.
: Mrs. Kamlesh.  Standard cost is: A predetermined cost. Used for cost-control. And the technique is known as standard costing.
Variance Analysis Topic Six by Dr. Ong Tze San
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
ACC3200 STANDARD COSTING.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Chapter 10 Standard Costs and the Balanced Scorecard.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
Copyright © by Houghton Miffin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Standard Cost Systems Chapter 23.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 8 © The McGraw-Hill Companies, Inc., 2007 McGraw-Hill /Irwin Standard Costs.
Standard Costs and Operating Performance Measures.
9-1 Standard Costing: A Functional-Based Control Approach 9.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Slide The Flexible Budget and Standard Costing: Direct Materials and Direct Labor.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
8-1 PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright © 2016 by McGraw-Hill.
1 Copyright © 2008 Cengage Learning South-Western. Heitger/Mowen/Hansen Standard Costing: A Managerial Control Tool Chapter Eight Fundamental Cornerstones.
MANUFACTURING FIRMS USE STANDARD COSTS AND STANDARD QUANTITIES TO BUDGET FOR AND ANALYZE PRODUCTION Standard Cost Variance Analysis.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Cornerstones of Managerial Accounting 2e Chapter Nine
Standard Costs and Variances
Performance Evaluation
Copyright © 2013 Nelson Education Ltd.
Pertemuan 7 Standard Costs.
Standard Costs and Variances
Topic Six by Dr. Ong Tze San
Principles of Accounting 2002e
Standard Costing and Variance Analysis
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Standard Costs and the Balanced Scorecard
Flexible Budgets, Standard Costs, and Variances Analysis Chapter 8
Presentation transcript:

(C) Ghanendra Fago (M. Phil, MBA) 1 Standard Costing, Variance Analysis and Management Cycle Use standard costs to prepare budgets and establish goals for product costing. Apply dollar, time, and quantity standards to work. Use standard costs to report on operations and managers’ performance. Calculate variances between standard and actual costs, determine their causes, identify inefficient operations, and take corrective action. Use variances to evaluate managers’ performance.

(C) Ghanendra Fago (M. Phil, MBA) 2 Standard Costs 1.Standard costs are predetermined costs that are developed from analyses of both: 1.a. Past operating costs, quantities, and times 2.b. Future costs and operating conditions. 2.In a standard costing system, standard costs for direct materials, direct labor, and manufacturing overhead flow through the inventory accounts and eventually into the Cost of Goods Sold account.

(C) Ghanendra Fago (M. Phil, MBA) 3 The Management Cycle Managers use standard costs throughout the management cycle: In the planning stage of the management cycle, standard costs aid in the development of budgets. During the executing stage, standard costs, quantities, and time are applied to work performed. During the reviewing stage, actual costs are compared with standard costs to compute variances, and managers analyze the causes of those variances to improve operations. During the reporting stage, a variance report provides information on operations and managerial performance

(C) Ghanendra Fago (M. Phil, MBA) 4 The Management Cycle In today’s globally competitive environment, new standards or measurements are necessary to help managers: –Reduce processing time. –Improve quality. –Improve customer satisfaction. –Improve on-time deliveries

(C) Ghanendra Fago (M. Phil, MBA) 5 Standard Costs Standard costs are used with existing job order or process costing systems. Standard costs are usually expressed as the cost per unit of a finished product or process. –Standard costs are based on: –Engineering estimates. –Forecasted demand. –Worker input. –Time and motion studies. –Type and quality of direct materials

(C) Ghanendra Fago (M. Phil, MBA) 6 Standard Costing The technique for application of standard cost is known as Standard Costing. It is the preparation of standard cost and applying them to measure the variation between standard cost and actual cost. The preparation of standard costs of products and service and a technique whereby the planned activities of an undertaking are expressed in budgets, standard costs, standard selling price and standard profit margins, and the differences between these and the comparable actual results are accounted for.’ Standard costing is expensive to use because the management accounting system must keep separate records of actual costs to compare with what should have been spent.

(C) Ghanendra Fago (M. Phil, MBA) 7 Standard costing may be summarized as To fix the standard cost for material, labour and overhead. To find out the actual cost To compare the actual cost with standard cost To analyse the variance between standard cost and actual cost

(C) Ghanendra Fago (M. Phil, MBA) 8 Use of Standard Costs  Preparing operating budgets.  Identifying production costs and processes that must be managed to reduce waste and inefficiency.  Evaluating the performance of managers and workers.  Setting prices.  Simplifying inventory and product costing procedures

(C) Ghanendra Fago (M. Phil, MBA) 9 Standard Cost per Unit There are six standards used to determine the standard cost per unit: 1.Direct materials price standard 2.Direct materials quantity standard 3.Direct labor time standard 4.Direct labor rate standard 5.Standard variable manufacturing overhead rate 6.Standard fixed manufacturing overhead rate

(C) Ghanendra Fago (M. Phil, MBA) 10 Direct Materials Price Standard The direct materials price standard is found by carefully considering: –Expected price increases –Changes in available quantities. –Possible new sources of supply. Direct Materials Quantity Standard The direct materials quantity standard is affected by: –Product engineering specifications. –Quality of direct materials. –Age and productivity of machines. –Quality and experience of the work force.

(C) Ghanendra Fago (M. Phil, MBA) 11 Direct Labor Time Standard The direct labor time standard is based on current time and motion studies of workers and machines and past performance. Direct Labor Rate Standard The direct labor rate standards are affected by labor union contracts and company personnel policies.

(C) Ghanendra Fago (M. Phil, MBA) 12 Standard Direct Materials, Standard Direct Labor Costs Manufacturing Overhead Costs Standard Direct Materials Cost = Direct Materials Price Standard X Direct Materials Quantity Standard Standard Direct Labor Cost = Direct Labor Time Standard X Direct Labor Rate Standard Standard Manufacturing Overhead Cost = (Standard Variable Overhead Rate +Standard Fixed Overhead Rate) X Application Basis

(C) Ghanendra Fago (M. Phil, MBA) 13 Standard Rates Standard Variable Manufacturing Overhead Rate =Total budgeted variable manufacturing overhead costs ÷ Expected number of standard machine hours Standard Fixed Manufacturing Overhead Rate = Total budgeted fixed manufacturing overhead costs ÷Normal capacity in terms of standard machine hours

(C) Ghanendra Fago (M. Phil, MBA) 14 Standard Unit Cost A product’s standard unit cost is determined by adding standard direct materials cost, standard direct labor cost and standard manufacturing overhead rate.

(C) Ghanendra Fago (M. Phil, MBA) 15 Four Step Approach of Variance Analysis 1.Compute the variance. If the variance is insignificant, actual operating results are close to or equal to anticipated operation conditions, no corrective action is needed. 2.Determine the cause of any significant variance. 3.Identify the performance measures that track those activities. 4.Take action to correct the problem or continue to improve operations.

(C) Ghanendra Fago (M. Phil, MBA) 16 Using Variance Analysis to Control Costs Compute Variance No Corrective Action Needed No Is the Variance Material Significant? Take Corrective Action Determine Cause(s) of Variance Yes Identify and Analyze Performance Measures to Determine Corrective Action

(C) Ghanendra Fago (M. Phil, MBA) 17 Material Variance Analysis  The term variance refers to the deviation of the actual cost from the standard cost due to the various causes.  Variances will occur if in any given production period the actual costs vary from the standard costs.  "Cost variance is the difference between the standard cost and the comparable actual cost incurred during a given period“ : ICMA  For example, if the price paid for material bought during a given production period, differed from the standard (expected) price for that material, a material price variance will arise.  Similarly if the amount of material actually used exceeded the standard (expected) usage a material usage variance will arise.

(C) Ghanendra Fago (M. Phil, MBA) 18 Material Cost Variance The difference between material at the standard material price and actual material price is known as material usage variance. The variance can be favorable or unfavorable.If the actual cost is lower than the standard cost, it is considered as a favorable variance and if the actual cost exceeds the standard cost the difference is deemed to be unfavorable. Material Cost Variance (MCV): = SQ  SP–AQ  AP = (SQ*SP)-(AQ*AP) = ((SQ/SO*AO)*SP)-(AQ*AP)

(C) Ghanendra Fago (M. Phil, MBA) 19 Material Price Variance (MPV) Material price variance is the deviation of the actual price paid from the standard price specified. Formula: Material Price Variance (MPV)= AQ (SP–AP)

(C) Ghanendra Fago (M. Phil, MBA) 20 Possible Causes of Direct Materials Price Variance Changes in vendor prices, inaccurate or outdated direct materials price standards, and differences between the quality of direct materials purchased and the quality desired. Differences between quantity discounts received and those anticipated. The purchase of substitute direct materials that differ from product specifications.

(C) Ghanendra Fago (M. Phil, MBA) 21 Material Usage Variance (MUV) It indicates the difference between the standard quantities of the material specified from the actual quantity of output and actual quantities of material used.The material usage variance can be calculated by multiplying the difference between the actual quantity and standard quantity by standard price. Formula: Material Usage Variance (MUV) = SP*(SQ-AQ)

(C) Ghanendra Fago (M. Phil, MBA) 22 Material Mix Variance (MMV) The material mix variance is the result of the deviation of the actual composition of a mixture of the material from the standard one. Normally, a material mix variance arises where there is the change in the composition of the material mixture Formula: Material Mix Variance (MMV) = (Total Weight of AM/Total weight of SM)  (SC of SM)–SC of AM

(C) Ghanendra Fago (M. Phil, MBA) 23 Possible causes of a direct materials quantity variance Inaccurate or outdated direct materials quantity standards Poor workmanship or excellent workmanship Faulty equipment Inferior or superior quality of direct materials Poor materials handling

(C) Ghanendra Fago (M. Phil, MBA) 24 Material Yield Variance (MYV) The difference between the standard yield output) specified and actual yield (output) obtained This variance is based on the output of the product The standard loss during its processing is expected to be 15%. Formula: Material yield variance (MYV): (Actual yield or output- Standard yield or output for actual input)*Standard cost per unit = SC/SO (Actual Yield –standard Yield)

(C) Ghanendra Fago (M. Phil, MBA) 25 Material Cost Variance (MCV) Material Price Variance (MPV) Material Usage Variance (MUV) Material Mix Variance (MMV) Material Yield Variance (MYV) VERIFICATION

(C) Ghanendra Fago (M. Phil, MBA) 26 Direct Cost Variance (LCV)  Is the difference between the standard direct labor cost for the actual output and the actual labor cost paid.  The deviation of the actual direct wages paid from the direct wages specified for the standard output. Formula:  Labour Cost Variance (LCV) = ST SR – AT  A = ((ST/SO AO)*SR) -(AT  AR)

(C) Ghanendra Fago (M. Phil, MBA) 27 Labor Rate (wage) Variance  Difference between standard wage rate per hour/day/week/month/fixed and actual wage rate paid.  It is usually caused due to increases in wage rate because of negotiation with the union or other causes.  Labour Rate Variance = AT (SR – AR) Causes of Direct Labor Rate Variance A worker is hired at a pay rate that is higher or lower than expected. An employee performed the duties of a higher- or lower-paid position.

(C) Ghanendra Fago (M. Phil, MBA) 28 Labor Efficiency Variance (LEV) “Have the workers performed as efficiently as they were expected to perform”? It compares the quantity of work achieved in the time paid for, with the production that should have been achieved in that time if the labor force had worked according to standard timings. Labour Efficiency Variance (LEV) = SR (ST – AT) Causes of Direct Labor Efficiency Variance Overall wage rates changed due to New labor agreements, labor strikes that cause the temporary hiring of unskilled help, large layouts that result in unusual usage of remaining workers etc.

(C) Ghanendra Fago (M. Phil, MBA) 29 Favorable Direct Labor Efficiency Variance A favorable direct labor efficiency variance can be caused by improved training of employees, new machinery and higher quality of materials. Unfavorable Direct Labor Efficiency Variance An unfavorable direct labor efficiency variance can be caused by machine breakdowns, inferior direct materials, poor supervision, slow materials handling, and poor employee performance

(C) Ghanendra Fago (M. Phil, MBA) 30 Labor Mix Variance (MMV)  It is possible when more than one type of labor is used for the job.  It represents the variance due to the change in standard and actual labor force composition. Labour Mix Variance (LMV) = (Total AT Mix/Total ST Mix)– SC of AM

(C) Ghanendra Fago (M. Phil, MBA) 31 Labor Yield Variance (LYV)  It represents that portion of labor efficiency variance which is due to difference between the standard output and the actual output.  If the actual labor output is higher as compare to the relative standard, then variance would be favorable and vice versa Labour Yield Variance (LYV)= SR (Actual Yield or Output – Standard Yield for Actual Input i.e. Time)

(C) Ghanendra Fago (M. Phil, MBA) 32 Labor Idle Time Variance (LITV)  Sub efficiency variance.  Indicates the standard cost of the actual hours for which the employees may remain idle due to abnormal circumstances like strikes, lockouts, power failure, breakdown of machinery, unavailability or raw materials etc.  Always unfavorable.  For the accurate of the labor efficiency variance labor, idle time should be adjusted.  Labour Idle Time Variance = Idle Time  SR (U)

(C) Ghanendra Fago (M. Phil, MBA) 33 Labour Cost Variance (LCV) Labour Rate Variance (LRV) Labour Efficiency Variance (LEV) Labour Mix Variance (LMV) Labour Yield Variance (LYV) Labour Idle Time Variance (LITV) VERIFICATION