WEEK 2.  Define standard cost  Explain how standard are set  Compute the standard cost of actual or equivalent units produced  Compute standard cost.

Slides:



Advertisements
Similar presentations
Budgeting and Variances
Advertisements

Standard Costing and Variance Analysis
Chapter 15 Fundamentals of Variance Analysis Learning Objectives 4.Prepare and use a profit variance analysis. 2.Develop and use flexible budgets.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Standard Costing and Variances
Chapter 22 Cost Control Using Standard Costing and Variance Analysis
Using Variances under Standard Cost System
MINGGU 3. Mix Variance is the result of mixing basic materials in a ratio that differs from standard materials specifications Yield Variance is the result.
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Variance Analysis Chapter 7 Prepared by Diane Tanner
Chapter 7: Standard Costing and Variance Analysis
Budgets and Variances continued: Production variances.
Manufacturing Overhead Variances Managerial Accounting Prepared by Diane Tanner University of North Florida Chapter 46.
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Factory Overhead Planned, Applied & Actual
Copyright © 2008 Prentice Hall All rights reserved 11-1 Flexible Budgets and Standard Costs Chapter 11.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Ch.11 Exercises Norwall Company’s Flexible budget manufacturing overhead (in condensed form) is given below : The following information is available for.
1 Brenda Mallouk Overhead Variance Analysis Management Accounting One.
Standard Costing and Variance Analysis
Flexible Budget, Overhead Cost Variances and Management Control Lecture 19 1 Readings Chapter 8,Cost Accounting, Managerial Emphasis, 14 th edition by.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Use only with permission of Susan Crosson Chapter 9 Standard Costing and Variance Analysis Fall 2007 Crosson.
Performance Evaluation
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
Chapter 10. Are standards the same as budgets? A standard is the expected cost for one unit. A budget is the expected cost for all units. Standards vs.
Standard Costing System Chapter 4 Managerial Accounting Concepts and Empirical Evidence.
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
ACC3200 STANDARD COSTING.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Hanson Inc. has the following direct material standard to manufacture one Zippy: 1.5 pounds per Zippy at $4.00 per pound Last week 1,700 pounds of material.
Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
24 - 1©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Flexible Budgets and Standard Costs Chapter 24.
1 Chapter 10. Standard Costs. M11-Chp-10-1-Standard-Costs Edited May 24, Copyright © 2011, Dr. Howard Godfrey This file contains illustrative.
Performance Evaluation and Using Variances Chapter M6.
Cost and Management Accounting: An Introduction, 7 th edition Colin Drury ISBN © 2011 Cengage Learning EMEA Cost and Management Accounting:
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Chapter 22. Prepare a flexible budget for the income statement.
STANDARD COSTING Setting Standard and Analyzing Variances Pertemuan 3, 4 dan 5 Matakuliah: > Tahun: >
Standard Costing and Variance Analysis
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
Flexible Budgets Static Budget Based on estimate of sales and production levels Compare costs associated with actual production to costs for budgeted production.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Flexible Budgets and Standard Costs Chapter 24. Objective 1 Prepare a Flexible Budget for the Income Statement.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall. Chapter 23 1.
Variance analysis 1 、 Basic variances 2 、 The reasons for variances 3 、 Operating statements 4 、 Investing variances 5 、 Materials mix and yield variances.
Variance Analysis: Manufacturing Overhead
STANDARD COST.
17 Flexible Budgets, Overhead Cost Management, and Activity-Based Budgeting.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Managerial Accounting
Lecture-16 Main Ahmad Farhan (ACA)
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Foundations and Evolutions
Standard Costs and Variances
Performance Evaluation Using Variances from Standard Costs
Standard Cost Accounting Materials, Labor, and Factory Overhead
Principles of Accounting 2002e
Power Notes Chapter 21 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Power Notes Chapter M6 Performance Evaluation, Variances from Standards Learning Objectives 1. Standards 2. Budgetary Performance Evaluation 3. Direct.
Presentation transcript:

WEEK 2

 Define standard cost  Explain how standard are set  Compute the standard cost of actual or equivalent units produced  Compute standard cost variances for materials, labor and FOH

Is the predetermined cost of manufacturing a single unit or a specific quantity of product under current or anticipated operating conditions ( Carter and Usry, 2002)

 Established budgets  Controlling costs by motivating employee and measuring operating efficiency  Simplifying costing procedures and expediting cost reports  Assigning cost to materials, work in progress and finished good in inventory  Establish contract bids and setting sales price

1. Material Standard and Variance: a. Material purchase price variance b. Material price usage variance c. Material inventory variance d. Material quantity (or usage) variance 2. Labor Standard and Variance a. Labor rate (wage or cost) variance b. Labor efficiency variance 3. Factory Overhead Standard and Variance a. Overall or net FOH Variance b. Two-variance method c. Three-variance method d. Four-variance method

a. Material purchase price variance = ( Qt x C.act ) – ( Qt x C. st ) or (C.act – C.st) Qt C.act > C.st = Unfavorable C.act < C.st = Favorable

b. Material price usage variance = ( Qt. used x C.act ) – ( Qt. used x C. st ) or (C.act – C.st) Qt.used C.act > C.st = Unfavorable C.act < C.st = Favorable

c. Material inventory variance = ( Qt. purchased x C.st ) – ( Qt. used x C. st ) or (Qt. purchased – Qt.used) C.st Qt. purchased > Qt. used = Unfavorable Qt. purchased < Qt. used = Favorable

d. Material quantity (or usage) variance = ( Qt. used x C.st ) – ( Qt. st x C. st ) or (Qt.used – Qt.st) C.st Qt. used > Qt. st = Unfavorable Qt. used < Qt. st = Favorable

a. Labor rate (wage or cost) variance = ( H. act x R. act ) - ( H. act x R. st ) or ( R.act – R.st) H.act R. act > R. st = Unfavorable R. act < R. st = Favorable

b. Labor efficiency variance = ( H. act x R. st ) – ( H. st x R. st ) or (H.act – H.st) R.st H. act > H. st = Unfavorable H. act < H. st = Favorable

a. Overall or net FOH Variance = FOH. act – FOH. st FOH. act > FOH. st = Unfavorable FOH. Act < FOH. st = Favorable

b. Two-variance method 1. Controllable Variance = FOH.act – ( FOH.var +FOH.fx) FOH.act > ( FOH.var +FOH.fx) = Unfavorable FOH.act < ( FOH.var +FOH.fx) = Favorable

2. Volume Variance = ( FOH.var +FOH.fx) – FOH.wip.st ( FOH.var +FOH.fx) > FOH.wip.st = UF ( FOH.var +FOH.fx) < FOH.wip.st = F Controllable variance + Volume variance = Overall or net FOH Variance

3. Three – variance Methods a. Spending Variance = FOH.act – (FOH.var1+FOH.fx) FOH.act > (FOH.var1+FOH.fx) = UF FOH.act < (FOH.var1+FOH.fx) = F Notes: FOH.var1 = on actual hours

b. Variable Efficiency Variance = (FOH.var1+FOH.fx) - ( FOH.var +FOH.fx) (FOH.var1+FOH.fx) > ( FOH.var +FOH.fx) = UF (FOH.var1+FOH.fx) < ( FOH.var +FOH.fx) = F

c. Volume Variance Spending var + Variable efficiency var + Volume var = Overall FOH variance

4. Four-Variance Method a. Fixed efficiency variance (H.act x FOH.fx.r) – (H.st x FOH.fx.r) (H.act x FOH.fx.r) > (H.st x FOH.fx.r)= UF (H.act x FOH.fx.r) < (H.st x FOH.fx.r) = F FOH.fx.r = Fixed FOH rate

b. Idle Capacity Variance = (FOH.var1+FOH.fx) – (H.act x FOH.r) (FOH.var1+FOH.fx) > (H.act x FOH.r) = UF (FOH.var1+FOH.fx) < (H.act x FOH.r) = F

c. Spending Variance d. Variable efficiency Variance Fixed Efficiency Var + Idle Cap Var + Spending Var + Variable eff.var = Overall FOH var

Carter,W & Usry, M, 2002, Cost Accounting, 13 th Edition, Thompson Learning