OPERATIONAL RISK MANAGEMENT
Appendix H: Risk training slides (sample). What is Risk? “ Risk is the effect of uncertainty on objectives ” AS/NZS ISO31000:2009.
PROJECT RISK MANAGEMENT
Marine Corps Artillery Detachment, Fort Sill Veterans Day 2008 ORM.
Operational Risk Management Refresher Training
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Note: See the text itself for full citations. Information Technology Project Management, Seventh Edition.
John Burfiend Kris Damsgaard Jami Anzalone. Facts Regarding Aviation Use  There will always be some risk associated with utilizing aviation assets (necessary.
Operational risk management Margaret Guerquin, FSA, FCIA Canadian Institute of Actuaries 2006 General Meeting Chicago Confidential © 2006 Swiss Re All.
Unit 6 – Risk Management and safety management system
The Australian/New Zealand Standard on Risk Management
OPERATIONAL RISK MANAGEMENT
Operational Risk Management for Airport Emergency Planning
Operational Risk Management
Operational Risk Management
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
COBIT® 5 for Risk Introduction
14 Pierrepont Rd (617) Newton, MA 02462
PRM 702 Project Risk Management Lecture #28
OPERATIONAL RISK MANAGEMENT
Tom Cecich, CSP, CIH NC Chapter ASSE March 12, 2015.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
CDS Operational Risk Management - October 28, 2005 Existing Methodologies for Operational Risk Mitigation - CDS’s ERM Program ACSDA Seminar - October 26.
Slide 1Lesson 14: Fundamentals of the CAP Flying Safety Program Fundamentals of the CAP Flying Safety Program.
DESIGNING FOR SAFETY CHAPTER 9. IMPORTANCE OF DESIGNING FOR SAFETY  In the near future, the level of safety that companies and industries achieve will.
OPERATIONAL RISK MANAGEMENT Indoctrination Training.
OPERATIONAL RISK MANAGEMENT. The Benefits of Risk Management Reduction in Material and Property Damage. Effective Mission Accomplishment. Reduction in.
Introduction to Risk Management MR. D.C. Weightman Deputy Director HQMC(Safety Division)
Risk Management For the Board of The Law Society 16 February 2005.
Operational Risk Management. CAP Approach  Top-down leader backing  Decentralized implementation  Moderate implementation tempo  Safety lead role.
OPERATIONAL RISK MANAGEMENT
QUALITY RISK MANAGEMENT RASHID MAHMOOD MSc. Analytical Chemistry MS in Total Quality Management Senior Manager Quality Assurance Nabiqasim Group of Industries.
Liability Issues for TRIO Programs Managing Your Project’s Risk.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Risk Benefit Risk Management SSG MACK.
July 09 Safety Meeting Larry Brockshus. Overview Gen Courter guidance Annual ORM Review 2009 Aircraft incidents.
OPERATIONAL RISK MANAGEMENT
Project Management IV1021Fö5 Risk Management. Agenda Project Risk Project Risk Management The Risk Management Process Goal: get an understanding of basic.
Col. Francis S. Gabreski Squadron Col. Francis S. Gabreski Squadron Operational Risk Management.
RISK MANAGEMENT : JOURNEY OR DESTINATION ?. What is Risk? “ Any uncertain event that could significantly enhance or impede a Company’s ability to achieve.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS RISK VERSUS SAFETY.
Hazard Identification
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Minnesota Wing Safety Meeting July 2010 Lt Col Larry Brockshus MN Wg/SE.
How to Supervise Evaluate
OPERATIONAL RISK MANAGEMENT (ORM) LT MICHAEL HAUSCHEN C130 AIRCRAFT COMMANDER FLIGHT SAFETY OFFICER.
The Risk Management Process
Continual Service Improvement Methods & Techniques.
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
RISK MANAGEMENT FOR COMMUNITY EVENTS. Today’s Session Risk Management – why is it important? Risk Management and Risk Assessment concepts Steps in the.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
Risk Assessment: A Practical Guide to Assessing Operational Risk
IT Infrastructure Amna Riaz007 Tayaba Ashraf008.
Dr. Gerry Firmansyah CID Business Continuity and Disaster Recovery Planning for IT (W-XIV)
Campus Wide Safety Committee Initial Meeting 11/9/16
Ranjan kumar Assistant Manager CCL,Ranchi
BPM/NPC Individual-Managing Your Risk Training
Civil Air Patrol BASIC LEVEL OPERATIONAL RISK MANAGEMENT
Quality Risk Management
Air Carrier Continuing Analysis and Surveillance System (CASS)
COLUMBUS DAY ALL SECTIONS COMPLETE THE ORM AND TURN IN AN ATTENDANCE ROSTER TO THE SAFETY OFFICER BY 8 OCT ALL SECTIONS REVIEW SAFETY CONCERNS WITHIN.
BPM/NPC Individual-Managing Your Risk Training
Operational Risk Management (ORM) and the Driving Task
Introduction to Risk Management.
Presentation transcript:

OPERATIONAL RISK MANAGEMENT (ORM)

OBJECTIVES Describe what ORM is and why the USCG is using it. Describe when and why to apply ORM. Use the seven step USCG ORM process. Use USCG ORM tools and job aids.

WHAT IS OPERATIONAL RISK MANAGEMENT (ORM)? A systematic approach to optimizing risk to support best mission outcomes. A specific seven step process supported with tools and job aids.

USCG ORM VISION “Increase mission success while reducing the risk to personnel, resources and the environment…” “Change from a compliance based to a risk-based philosophy…” “Provide logical process to identify & exploit opportunities producing greatest return on our investment…”

WHY IMPLEMENT ORM? ORM applications are proven to offer mission supportive breakthrough potential. Force reductions make every USCG person and item of equipment more critical to mission success. ORM can significantly increase USCG operational capabilities and training realism.

4 KEY ORM PRINCIPLES 1. Accept no unnecessary risks. 2. Make risk decisions at the appropriate level. 3. Accept risks when benefits outweigh costs. 4. Integrate ORM into operations and planning at all levels. KEY POINTS: * By understanding these key ideas, you understand the basis of ORM. STUDENT NOTES: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________________________ ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

BUT.... NOBODY TAKES “UNNECESSARY” RISKS? 1. Accept No Unnecessary Risks BUT.... NOBODY TAKES “UNNECESSARY” RISKS? If all the hazards that could have been detected have not been detected then unnecessary risks are being accepted. The single greatest advantage of ORM over traditional risk management is the consistent detection of 50%+ more hazards.

2. Make Risk Decisions at the Appropriate Level Factors below become basis of a decision-making system to guide leaders Who has operational control & responsibility? Who is the senior person at the scene? Who possesses best insight into the full benefits and costs of a risk? Who has the resources to mitigate the risk? What level makes the most operational sense? KEY POINTS: * In our discussion of step four - Make Control Decisions, we will outline the procedures for building effective risk control decisions systems in your organization. These systems resolve these various factors into a consistent routine process. STUDENT NOTES: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________________________

3. Accept Risks When Benefits Outweigh Costs. MAINTAINING A BOLD, RISK-TAKING ORGANIZATION IS ALWAYS A CHALLENGE. ORM HELPS. KEY POINTS: * In the late 1960’s, the USAF failed to take the risks associated with realistic air-to-air combat. As a result, the kill ratio with the NV Air Force reached nearly 1 to 1. The risks were taken when Red Flag was developed. - Result: The kill ratio quickly increased to a favorable 10 to 1 or more. ORM can assure that we never make a similar mistake. STUDENT NOTES: _______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ ______________________________________________________________________________________________________________________________ _______________________________________________________________ Taking calculated risks is essential for an organization to grow and capitalize on its capabilities.

4. Integrate ORM Into Operations and Planning At All Levels. This is the one we want!! Loss Control Staff Injects Operational Leaders Add-On Operational Process Operational Process Operational Process Loss Control Occurs Within The Process 2-21

HOW WILL THE COAST GUARD IMPLEMENT ORM? Apply the seven step ORM process and the supporting tools In a consistently mission supportive way Through a highly integrated and decentralized approach

HOW DO WE ASSURE THAT ORM IS ALWAYS MISSION SUPPORTIVE? Target optimum mission risk, not minimum risk. Involve operators to insure risk controls are mission supportive. Use only the amount of ORM dictated by the risk. Low risk - less ORM, high risk - more ORM.

USING THE 7-STEP PROCESS THE RISK MANAGEMENT CONTINUUM PLANNING OPERATIONS AFTER-ACTION -Deliberate ORM -Detailed Hazard ID -Integrated -Largely Time-Critical -Change Analysis -Real Time -Highly Decentralized -Assess Indicators -Integration -Feedback We try to get most ORM done here But continue the process here and here

WHAT IS THE SEVEN STEP ORM PROCESS? A decision-making technique A job aid & tool Optimizes risk

Step 1 - Identify Mission Task (COMDTINST 3500.3, Encl 1) Clearly state the mission objective. Define what tasks are required to accomplish the mission. Define the conditions under which to accomplish the task.

UNDERSTANDING THE FLOW OF EVENTS THE MISSION ANALYSIS UNDERSTANDING THE FLOW OF EVENTS 3 5-2

MISSION ANALYSIS The “MA” is a must do! METHOD: List the events in sequence. RESOURCES: Mission planners & operators. COMMENTS: ORM must cover all aspects of an operation. The Mission Analysis supports that. The “MA” is a must do! 5 5-4

MISSION ANALYSIS Advance Rescue Ops Beach party on scene. Launch aircraft. Enroute considerations. Approach to water. “Survivor” & RS events. Aircraft Switch-Out Subsequent Scenarios Recovery all elements 8 5-7

Step 2 - Identify the Hazards (COMDTINST 3500.3, page 4) Hazard: Any real or potential condition that can cause mission degradation, injury, illness, or death to personnel or damage to or loss of equipment or property.

HAZARD ANALYSIS What can go wrong? Focus on the critical OVERALL MISSION Focus on the critical components of your mission: Equipment Personnel/Experience Environment Timeline 3-3

HAZARD ANALYSIS P.E.A.C.E. What Can Go Wrong? Planning Event Asset Equipment Personnel Environment Timeline What Safe Guards Exist? How Effective Are They? P.E.A.C.E. Planning Event Asset Communication Environment 3-9

Step 3 - Assess the Risks The Process which associates “hazards with 3-12

HAZARD VERSUS RISK HAZARD RISK A description of a condition that can impair mission accomplishment. No indication of its mission significance. HAZARD A hazard for which we have estimated the severity, probability, and exposure to determine the scope with which it can impact our mission. RISK 3-14

ASSESS RISKS SEVERITY - What are the effects? PROBABILITY - Can this happen to us? EXPOSURE - What is the event frequency or degree of involvement?

SEVERITY Potential Consequences measured in terms of degree of impact on: Mission Man Machine/Materiel 3-16

SEVERITY CATEGORIES CATASTROPHIC - Complete mission failure, death, or loss of system. MAJOR - Major mission degradation, severe injury, occupational illness, or major system damage. SIGNIFICANT - Minor mission degradation, injury, minor occupational illness, or minor system damage. MINIMAL - Less than minor mission degradation, injury, occupational illness or minor system damage. NONE - No impact to personnel or mission outcome. 3-17

Acknowledge “uncertainty” PROBABILITY Likelihood that potential consequences will occur: Very likely to happen Likely, greater than 50% chance Occasional, about 50-50 chance Unlikely under normal conditions Remote under any conditions Acknowledge “uncertainty” 3-18

EXPOSURE Duration/repetition/number of people &/or equipment involved in event: Great Above Average Average None or below average 3-18

THE RISK PRIORITY LIST Biggest hazard By ranking the hazards, we can work them on a worst first basis. This is vital because risk control resources are always limited and should be directed at the big problems first to assure maximum bang for the buck. Least hazard worthy of action 3-21

USCG Aviation Risk Assessment Simplifies SPE assessment through use of Model Simplifies SPE assessment through use of Green Amber Red (GAR) Model 3-20

3-31

Use Risk Priority List - Attack “Worst First” Step 4. Identify Options Are risks acceptable or unacceptable? Can we modify the mission to reduce risk? Are any safeguards missing? What new options should we consider? Use Risk Priority List - Attack “Worst First” 5 5-4

Mission Priority & Time Criticality Often Drive Options IDENTIFY OPTIONS S.T.A.A.R Spread Out Transfer Avoid Accept Reduce Mission Priority & Time Criticality Often Drive Options 3-25

Step 5. Evaluate Risk vs Gain Seek optimal risk management Gain should balance or outweigh the Risk Risk Decision made at lowest appropriate level Command validates Assessment & Management Equates to “Reality Check” 5 5-4

3-31

Risk vs Gain 3-31

Step 6. Execute Decision Control Options must be implemented Decision Rational must be communicated Facilitates S.A. regarding Risk Management process 5 5-4

Step 7. Monitor Situation Insure Control Options are effective ID changes requiring further RA/RM Capture “Lessons Learned” Failure to respond to changes can become Links in the Mishap Chain 5 5-4

Questions?

USING THE 7-STEP PROCESS LEVELS OF EFFORT “TIME CRITICAL” “DELIBERATE” “STRATEGIC” Little: - Time - Complexity - Risk Lot of: - Time - Complexity - Risk ORM is applied proportionate to operational complexity, criticality, and risk!