Production and Service Systems Operations

Slides:



Advertisements
Similar presentations
Manufacturing Planning and Control
Advertisements

Chapter 7. Capacity Planning and Management
WEEK 11A – [S&OP] AGGREGATE PLANNING (CHAPTER 13) Planning levels (long, intermediate and short ranges and real time control); Planning & Control Model;
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Manufacturing’s Objectives
Principles of Operations Management
Rev. 03/09/05SJSU Bus David Bentley1 Chapter 12 – Aggregate Planning Planning levels (long, intermediate and short ranges and real time control);
Chapter 9 Capacity Planning 2000 by Prentice-Hall, Inc.
Perencanaan Kapasitas Produksi
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
Utdallas.edu/~metin 1 Planning Demand and Supply in a Supply Chain Forecasting and Aggregate Planning Chapter 8.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring MRP-II and ERP Slide Set #13.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Production Planning and Control Introduction
1 DSCI 3123 Forecasting & Aggregate Production Planning Strategic Role Of Forecasting Forecasting Methods Capacity Planning Aggregate Production Planning.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Aggregate Production Planning (APP) Slide Set #8.
Thursday Night Operations Management Class 7. Chapter 14 Resource Planning.
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
Resource Requirements Planning:
MRP Systems MRP – Material Requirements Planning Commonly used method in industry to coordinate the production scheduling of end items and their associated.
Chapter 16 Inventory Systems for Dependent Demand
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Chapter 12a Resource Requirements Planning: MRP and CRP.
11DSCI4743 Capacity Management Capacity management is planning & controlling resources needed to meet production objectives –Planning: determining resources.
1 OM3 Chapter 13 Resource Management © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Lot Sizing Slide Set #11.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
1 OMGT 4743/6743 Aggregate Production Planning (APP) Matches market demand to company resources Plans production 6 months to 12 months in advance Expresses.
Aggregate Planning This Chapter explores:
Manufacturing Planning & Control System Major Tasks restate business objectives in operations management terms ensure feasibility of plans identify gaps.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Aggregate Planning and Resource Planning Chapters 13 and 14.
CAPACITY MANAGEMENT Nyoman Pujawan.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
Activity Scheduling and Control
AGGREGATE PRODUCTION PLANNING. Business Planning Exercise  Business plan is strategic in nature and addresses the following questions: Should we meet.
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Master Production Scheduling (MPS) Slide Set #9.
© 2008 Prentice Hall, Inc.14 – 1 Material Requirements Planning (MRP)
Basics of Supply Chain Management
Capacity Planning and Utilization
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
Introduction to Materials Management
Chapter 7 Capacity Planning and Management
Manufacturing Planning and Control
Capacity Planning.
Slide 1. Machine Capacities
Manufacturing’s Objectives
Aggregate Production Planning (APP)
Capacity Management Capacity management is planning & controlling resources needed to meet production objectives Planning: determining resources needed.
Presentation transcript:

Production and Service Systems Operations Spring 2009-2010 Capacity Planning Slide Set #12

Capacity Planning The two major activities of MPC planning / control of materials planning / control of capacity Capacity plans must be developed concurrently with materials plans if the materials plans are to be realized Trade-off insufficient capacity versus excess capacity Chapter 10 in VBWJ

Capacity Planning Hierarchy in MPC

Capacity Planning Hierarchy in MPC Resource planning converting monthly, quarterly or annual data from the APP into aggregate resources such as gross labor hours, floor space and machine hours the level of planning involves new capital expansion, bricks and mortar (buildings), machine tools, warehouse space etc. Rough-cut capacity planning to modify the resource levels or material plan to ensure the execution of the MPS three techniques capacity planning using overall planning factors (CPOF) capacity bills resource profiles

Capacity Planning Hierarchy in MPC Capacity Requirements Planning (CRP) time-phased capacity requirements determined from MRP data Finite loading shop scheduling process Input / Output analysis method for monitoring the actual consumption of capacity during the execution of detailed material planning

Capacity Planning and Control Techniques Capacity planning using overall factors (CPOF) Capacity bills Resource profiles Capacity Requirements Planning (CRP) MPS MRP

Capacity Planning Using Overall Factors (CPOF) Simple technique Allocates workload to work centers based on historical data Assumes that product mixes and historical divisions of work between work centers remain unchanged

Capacity Planning Using Overall Factors (CPOF)

Capacity Bills Takes into account the period-to-period shifts in product mix BOM and routing data required The Bill of capacity indicates the total standard time required to produce one end product in each work center Sample product structures:

Capacity Bills

Capacity Bills The total hours for MPS in each period is the same as the hours in CPOF The difference is

Resource Profiles Introduces the time dimension Leadtimes: Assume 2 week for component C, and 1 week for all other end products and components Consider, as an example, the requirements for

Resource Profiles and the requirements for end product B for period 5:

Resource Profiles

Resource Profiles The work center percentage allocations and the total hours (939.20) is the same as the “capacity bill” method results However, the period requirements for individual work centers vary due to

Capacity Requirements Planning (CRP) Medium-term capacity planning utilizing time-phased MRP data (including lot sizes and timing) improved accuracy in timing capacity requirements The other three methods use only MPS data Accounts for available inventories through MRP’s gross-to-net feature Recognizes the completed shop orders considers only the capacity needed to complete the remaining work on open shop orders Takes into account the demand that may not be accounted for in the MRP for example, demand for service parts

Capacity Requirements Planning (CRP) Item C is processed at work center 300 during the second week of the 2-week leadtime 1+40*.175=8 hours watch out for timing

Capacity Monitoring with Input / Output Control Monitoring the execution of the plan Compare the planned work input and output with the actual input and output

Capacity Monitoring with Input / Output Control Backlog decouples input from output, allowing work center operations to be less affected by variations in requirements Do not release orders to a work center that already has an excessive backlog The bathtub analogy to input/output analysis (VBWJ, p355) backlog: the water in the tube Find the bottlenecks in the system, and concentrate on managing their capacities efficiently an hour of capacity lost in a bottleneck work center is an hour lost to the entire company an hour of capacity gained in a non-bottleneck work center will only increase work in process inventory and confusion