G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Juliette PLOUIN – CEA/SaclayCARE’08, 3 December /21 Superconducting Cavity activities within HIPPI CARE ‘08 CERN, 2-5 December 2008 Juliette PLOUIN.
Rosier Ph. – IPNO – Detector Dpt. – 27/05/2011APRIME HPS collaboration meeting 1/24 1- Vacuum chamber proposal 1.1- Stainless steel chamber design and.
Material choice Ofelia Capatina OC, Material choices Discuss material choices for – Helium tank – Flanges, joints, bellow OC,
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
SCRF Activities at IPN Orsay Sébastien Bousson On behalf of the SCRF group Eurisol Net Meeting – CERN, 28 th June 2011.
Spoke Cryomodules (WP4) Guillaume OLRY (CNRS/IPN Orsay) WP4 Deputy Leader April 21, 2015.
Cavity design Fundamental parameters : frequency, beta, number of cells (gaps), Eacc Optimisation : R/Q, surface fields / Eacc, Qex, damping of HOMs, kloss,
ESS cavities interfaces
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
The design of elliptical cavities Gabriele Costanza.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1 Spoke cavities for ESS and MYRRHA G. Olry, P. Duchesne (IPN Orsay) SLHiPP-2, 3-4 May 2012, Catania.
The ESS Linear Accelerator
56 MHz SRF Cavity and Helium vessel Design
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
SPL cavity design by IPN Orsay Guillaume OLRY November rd SPL collaboration meeting.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
ESS AD RETREAT 5 th December 2011, Lund “A walk down the Linac” SPOKES Sébastien Bousson IPN Orsay.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
LASA status for medium-beta cavity Paolo Michelato.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
1 LUND March 16 th, 2016 ESS ELLIPTICAL CRYOMODULE Vacuum vessel: Ports and sealing, Manufacturing feedback LUND, March 16th, 2016 Unité mixte de recherche.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
1 SLHiPP2013 meeting – Louvain la Neuve Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : +33.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
H-ECCTD KICK-OFF DESCRIPTION AND CHALLENGES 16/03/2016 F. PEAUGER.
Accelerator/ Medium Beta Cavities Rocco Paparella on behalf of INFN Milano – LASA ESS Team April 21st, 2016.
SC cavity development for IHEP Jianping Dai RF group, Accelerator Center, IHEP International Review Meeting on C-ADS Acc. Phys. Design, Sept. 19~20,
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
F LESEIGNEUR / G OLIVIER LUND January 9th, ESS HIGH BETA CRYOMODULE ESS CRYOMODULE STATUS MEETING HIGH BETA CRYOMODULE LUND JANUARY 9TH, 2013 Unité.
Spoke Cavities developments in Europe CNRS/IN2P3/ IPN– Paris-Sud University Sébastien Bousson On behalf of the IPNO team.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
WP High Beta Cavities Delivery
Status of the beta=0.65 cavity RF desigN
CERN – Zanon discussions
WP5 Elliptical cavities
Status of developments at CEA-Saclay
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Progress and Issues with VTS Upgrade
Fabrication of Nb and Cu SPL cavities and required tools CERN status
VERTICAL TEST RESULTS OF SPOKE RESONATOR AT IPNO
SC spoke cavity for China-ADS 3~10MeV injector
Double Quarter Wave Crab Cavity
Cavity + He Vessel interface
RAPPEL TITRE PRESENTATION
Prototype cryomodule development
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Double-Spoke Cavities
FLUX TRAPPING STUDIES ON LOW BETA CAVITIES
Magnetic shielding and thermal shielding
Presentation transcript:

G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax :

Since the last EuCARD-SRF Meeting in March Overall cavity design  From march ’10 to July ’10: new cavity design under study based on  Proposal for having the same end-groups for cavity β=1 (CEA) and cavity β=0.65  New parameter for vacuum load: 1.5  From July ’10 to 15 th Oct ’10: Technical modifications to fit CERN’s short-cryomodule requirements  15 th Oct ’10: β=1 elliptical cavities will not be settle inside CERN’s short-cryomodule Call for tender and first order  Cavity and helium vessel technical drawings  Niobium Conclusion  Manpower & planning

April’10: Identical END-GROUPS between β=1 & β=0.65 cavities  major changes on beta 0.65 cavity mechanical and RF designs: Bigger beam tube apertures  New design of the 2 external half cells (field flatness)  New location and interface of the power coupler (Qext) New helium vessel New tuning system interface April’10: Identical END-GROUPS between β=1 & β=0.65 cavities  major changes on beta 0.65 cavity mechanical and RF designs: Bigger beam tube apertures  New design of the 2 external half cells (field flatness) NNew location and interface of the power coupler (Qext) New helium vessel New tuning system interface Retuned Increased f (MHz)704.0 Epk/Eacc Bpk/Eacc (mT/MV/m) K (%) % r/Q (Ohm) G (Ohm)197  g & 1 Joule (MV) 1.11 Qo Rres=2n  ) Transit Time Factor0.65 specs beta=0.65 cavity inside beta=1 helium vessel S. Rousselot (IPNO)

 Von Mises stresses for K < 50 MPa with 4mm  Lorentz forces detuning with 1 stiffening ring : K L ~ -1.6 Hz/(MV/m)² Cavity walls thickness = 4 mm 46 MPa H-M Gassot (IPNO) Optimized rings position: h=94 mm Beam axis h fixed free H-M Gassot (IPNO)

July ’10 to 15 th Oct ’10: many iterations to fit the CERN’s short-cryomodule requirements  Tuning system & holding bars integration: pb of angular position...  Power coupler flange material: SS, Ti, Nb/Ti  Overall Helium vessel design: connecting parts between cavity/tank, cryogenics pipes location and size... July ’10 to 15 th Oct ’10: many iterations to fit the CERN’s short-cryomodule requirements  Tuning system & holding bars integration: pb of angular position...  Power coupler flange material: SS, Ti, Nb/Ti  Overall Helium vessel design: connecting parts between cavity/tank, cryogenics pipes location and size... Flange of the coupler port Ti flange for the tuning system

15 th Oct ’10: CERN-CEA-CNRS major decision  Beta=1 and Beta=0.65 cavities will be tested in CRYHOLAB only!  No more constraints on interfaces and helium vessel design 15 th Oct ’10: CERN-CEA-CNRS major decision  Beta=1 and Beta=0.65 cavities will be tested in CRYHOLAB only!  No more constraints on interfaces and helium vessel design Thick tube in Nb Nb-to-Ti transition (EB weld) Thick tube in Nb Nb-to-Ti transition (EB weld) SS flange (brazed)

S. Rousselot (IPNO) Final design  Technical drawings: ready  Technical specifications: ready  Call for tender: currently under progress  Technical drawings: ready  Technical specifications: ready  Call for tender: currently under progress

 Nb sheets: 4.2 mm (cells), 3.2 mm (end-groups), 2 mm (pick-up & HOM ports)  3 offers for RRR>250  Neyco: euros  Plansee: euros  Tokyodenkai: euros  winner!...  ”small” budget overrun of about 100%!  Nb sheets: 520 €/kg! (270 € in 2006, 350 € in 2008)  Thick tubes for cavity-to-helium vessel transition  Coupler side: 1500 euros  Tuning system side: 3300 euros  Material received in February this year

MANPOWER  From April ’09 to end of March ’10: p.m PLANNING  --> end of June ’11: call for tender (public contract > 125k€ HT)  July ’11: choice of the manufacturer  Sept ’11: beginning of the fabrication  June ’12: cavity delivery w/o helium vessel  field flatness  July ’12: helium vessel welding  Sept ’12: cavity preparation (BCP + HPR) & assembly in clean room  Oct ’12: test in vertical cryostat  Before end of March ’13: cavity installation & test in CRYHOLAB MANPOWER  From April ’09 to end of March ’10: p.m PLANNING  --> end of June ’11: call for tender (public contract > 125k€ HT)  July ’11: choice of the manufacturer  Sept ’11: beginning of the fabrication  June ’12: cavity delivery w/o helium vessel  field flatness  July ’12: helium vessel welding  Sept ’12: cavity preparation (BCP + HPR) & assembly in clean room  Oct ’12: test in vertical cryostat  Before end of March ’13: cavity installation & test in CRYHOLAB